ENVIRONMENTAL DOCUMENT LISTING
JUNE 29, 2010
1. BACKGROUND INFORMATION @ IAAAP
2. DRAFT INSTALLATION ASSESSMENT SEPTEMBER 1978
FINAL INSTALLATION ASSESSMENT JANUARY 1980
2.1 SUBSURFACE INVESTIGATION AT SITE Z-1 (ABANDONED PINKWATER LAGOON) AT IOWA ARMY AMMUNITION PLANT, FEBRUARY 25, 1982, PREPARED BY SCS ENGINEERS
3. EVALUATION OF PINKWATER LAGOON, LINE 6 AND LINE 4A BY SCS ENGINEERS SEPTEMBER 22, 1981
4. CONTAMINATION REPORTS SEPTEMBER 17, 1982, PREPARED BY ERG
GEOTECHNICAL REPORT SEPTEMBER 17, 1982, PREPARED BY ERG
CONTAMINATION REPORT JUNE 15, 1982, PREPARED BY ERG
5. FOLLOW-ON STUDY OF ENVIRONMENTAL CONTAMINATION AUGUST 29, 1984
6. PLANT UPTAKE STUDIES, PERFORMED BY ORNL, 1990-1996
7. (IAG) COMMUNITY RELATIONS PLAN, FEBRUARY 2001
7.1 DRAFT FINAL POTENTIAL AREAS OF CONCERN SUPPLEMENT MAY 1991, PREPARED BY THE CORPS OF ENGINEERS
7.2 DRAFT COMMUNITY RELATIONS PLAN UPDATE, MARCH 2009, PREPARED BY TETRA TECH
8. PRELIMINARY ASSESSMENT (PAS) FOR THE 43 IAAAP SITES 1991, PREPARED BY JAYCOR
9. FINAL WORK PLAN PHASE 1 REMEDIAL INVESTIGATION/FEASIBILITY STUDY JUNE 1992 VOLUME 1 OF 3, PREPARED BY JAYCOR
10. FINAL WORK PLAN PHASE 1 REMEDIAL INVESTIGATION/FEASIBILITY STUDY JUNE 1992 VOLUME 2 OF 3, PREPARED BY JAYCOR
11. FINAL WORK PLAN PHASE 1 REMEDIAL INVESTIGATION/FEASIBILITY STUDY JUNE 1992 VOLUME 3 OF 3, PREPARED BY JAYCOR
12. ACUTE & CHRONIC TOXICITY TESTS – IAAAP 1993, PREPARED BY ESE
13. BASEWIDE ANALYSIS & DRILLING PROCEDURES JAYCOR 1993
14. INSTALLATION ENVIRONMENTAL ASSESSMENT OCTOBER 12, 1995
15. PRELIMINARY SITE CHARACTERIZATION REPORTS MARCH 1993, PREPARED BY JAYCOR
16. SITE CHARACTERIZATION REPORT R01, PREPARED BY JAYCOR
17. SITE CHARACTERIZATION REPORT R02 & R03, PREPARED BY JAYCOR
18. SITE CHARACTERIZATION REPORT R04 - R11, PREPARED BY JAYCOR
19. SITE CHARACTERIZATION REPORT R12 - R21, PREPARED BY JAYCOR
20. SITE CHARACTERIZATION REPORT R22 - R30, PREPARED BY JAYCOR
21. ANNUAL HISTORICAL REVIEW OCTOBER 1, 1991 – SEPTEMBER 30, 1992, PREPARED BY MASON & HANGER
22. FEASIBILITY STUDY INITIAL SCREENING DOCUMENT JAN 1994
DRAFT FEASIBILITY STUDY MAY 1994, PREPARED BY JAYCOR
23. DRAFT FINAL FIELD SAMPLING PLAN ADDENDUM FOLLOW-ON RI SAMPLING MARCH 1995, PREPARED BY JAYCOR
24. RISK ASSESSMENT PROTOCOL DOCUMENT FOR THE RI/FS OCTOBER 1992, PREPARED BY JAYCOR
25. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 1 OF 11, PREPARED BY JAYCOR
26. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 2 OF 11, PREPARED BY JAYCOR
27. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 3 OF 11, PREPARED BY JAYCOR
28. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 4 OF 11, PREPARED BY JAYCOR
29. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 5 OF 11, PREPARED BY JAYCOR
30. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 6 OF 11, PREPARED BY JAYCOR
31. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 7 OF 11, PREPARED BY JAYCOR
32. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 8 OF 11, PREPARED BY JAYCOR
33. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 9 OF 11, PREPARED BY JAYCOR
34. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 10 OF 11, PREPARED BY JAYCOR
35. REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 11 OF 11, PREPARED BY JAYCOR
36. DRAFT BENCH SCALE COMPOSTING INVESTIGATION FOR THE IOWA ARMY AMMUNITION PLANT SOILS NOVEMBER 1997
37. FINAL EVALUATION OF NATURAL ATTENUATION AT INDUSTRIAL OPERATIONS COMMAND SITES OCTOBER 1999, PREPARED BY PLATINUM INTERNATIONAL
38. GUIDELINES FOR THE COORDINATION OF CERCLA ACTIVITIES BETWEEN ATSDR AND DOD, FEBRUARY 1995
39. Draft IOWA AAP PUBLIC HEALTH ASSESSMENT AUGUST 21, 1999, PREPARED BY FEDERAL FACILITIES ASSESSMENT BRANCH
40. IOWA AAP PUBLIC HEALTH ASSESSMENT DECEMBER 28, 1999, PREPARED BY FEDERAL FACILITIES ASSESSMENT BRANCH
42. DRAFT ATSDR HEALTH CONSULTATION ENVIRONMENTAL PATHWAY EVALUATION FOR BERYILLIUM AND DU 8/15/03, PREPARED BY FEDERAL FACILITIES ASSESSMENT BRANCH
43. FINAL ATSDR HEALTH CONSULTATION ENVIRONMENTAL PATHWAY EVALUATION FOR BERYILLIUM AND DU DECEMBER 9, 2003, PREPARED BY FEDERAL FACILITIES ASSESSMENT BRANCH
44. DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 1 – TEXT (LINE 1 & FIRING SITE) & FIGURES, PREPARED BY TN & ASSOCIATES
45. DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 2 – APPENDICIES A-J, PREPARED BY TN & ASSOCIATES
46. DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 3 APPENDIX K, PREPARED BY TN & ASSOCIATES
47. DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 4 APPENDIX K, PREPARED BY TN & ASSOCIATES
48. DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 5 APPENDIX K, PREPARED BY TN & ASSOCIATES
49. DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 6 APPENDIX K, PREPARED BY TN & ASSOCIATES
50. DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 7 APPENDIX L THRU 0, PREPARED BY TN & ASSOCIATES
51. DRAFT LINE 1 & FIRING SITE SUPPLEMENTAL RI REPORT MAY 2002 VOLUME 1, PREPARED BY TN & ASSOCIATES
52. DRAFT LINE 1 & FIRING SITE SUPPLEMENTAL RI REPORT MAY 2002 VOLUME 2, PREPARED BY TN & ASSOCIATES
53. DRAFT FINAL LINE 1 & FIRING SITE SUPPLEMENTAL RI REPORT AUGUST 2002 VOLUME 1, PREPARED BY TN & ASSOCIATES
54. DRAFT FINAL LINE 1 & FIRING SITE SUPPLEMENTAL RI REPORT AUGUST 2002 VOLUME 2, PREPARED BY TN & ASSOCIATES
55. DRAFT AERIAL RADIATION SURVEY WORK PLAN, PREPARED BY ENVIRONMENTAL ASSESMENT DIVISION, SEPTEMBER 2002
56. DRAFT FINAL AERIAL RADIATION SURVEY WORK PLAN, PREPARED BY ENVIRONMENTAL ASSESMENT DIVISION
57. FINAL AERIAL RADIATION SURVEY WORK PLAN (2 COPIES), PREPARED BY ENVIRONMENTAL ASSESMENT DIVISION
59. DRAFT AERIAL RADIOLOGICAL SURVEY APRIL 2003, PREPARED BY ARGONNE NATIONAL LAB AND REMOTE SENSING LAB
60. DRAFT FINAL AERIAL RADIATION SURVEY JULY 10, 2003, PREPARED BY ARGONNE NATIONAL LAB AND REMOTE SENSING LAB
61. DRAFT PROJECT MANAGEMENT PLAN JULY 2004, PREPARED BY TETRA TECH
62. FINAL PROJECT MANAGEMENT PLAN DECEMBER 2004, PREPARED BY TETRA TECH
62.1 FINAL PROJECT MANAGEMENT PLAN AUGUST 2008, PREPARED BY TETRA TECH
63. WORK PLAN FOR UNEXPLODED ORDNANCE (UXO) SUPPORT WORK SITE INVESTIGATION BLDG 600-84, JANUARY 2008, PA WEBER LC
64. FINAL REPORT FOR UNEXPLODED ORDNANCE (UXO) SCAN WORK BLDG 600-84, JANUARY 28, 2008, PA WEBER LC
66. DRAFT SITE CONSTRUCTION AND MANAGEMENT PLAN FOR THE 40MM TEST RANGE, MAY 2010, PREPARED BY AMERICAN ORDNANCE
75. INSTALLATION ACTION PLAN FY05AUGUST 2004
76. INSTALLATION ACTION PLAN FY06 JUNE 2005
77. INSTALLATION ACTION PLAN APR/FY06, SEPTEMBER 27, 2006
78. INSTALLATION ACTION PLAN (PUBLIC VERSION) APR/FY06, SEPTEMBER 27, 2006
80. CLOSED TRANSFERRING AND TRANSFERRED RANGE/SITE INVENTORY, PREPARED BY ENGINEERING ENVIRONMENTAL MANAGEMENT
82. INSTALLATION ACTION PLAN (PUBLIC VERSION) FY2008, NOVEMBER 10, 2008
83. INSTALLATION ACTION PLAN FY2009 COMPLIANCE-RELATED CLEANUP, 22 JULY 2009
99. WATER QUALITY ENGINEERING CONSULTATION NO. 31-24-0673-85 INVESTIGATION OF GROUNDWATER CONTAMINATION, 1985 SAMPLING EVENT, PREPARED BY UNITED STATES ARMY ENVIRONMENTAL HYGIENE AGENCY
100. UNDERGROUND POLLUTION INVESTIGATION @ THE IAAAP FEBRUARY 22, 1982, PREPARED BY SCS ENGINEERS
101. GROUNDWATER QUALITY ASSESSMENT PLAN INERT LANDFILL & LINE 6 AREA JUNE 1995, PREPARED BY AEHA
102. DRAFT REPORT MIDWEST SITE CONFIRMATION SURVEY SAMPLING REPORT FEBRUARY 28, 1986, PREPARED BY DAMES & MOORE
103. DRAFT FINAL MIDWEST SITE CONFIRMATION SURVEY SAMPLING AUGUST 29, 1986, PREPARED BY DAMES & MOORE
104. FINAL REPORT GROUNDWATER QUALITY ASSESSMENT INERT LANDFILL AND LINE 6 AREAS DECEMBER 1989, PREPARED BY TERRA CON
105. COMPREHENSIVE MONITORING EVALUATION (FINAL REPORT) JANUARY 21, 1992, PREPARED BY PRC ENVIRONMENTAL MANAGEMENT
106. FINAL WORK PLAN AND GROUNDWATER QUALITY ASSESSMENT PLAN FOR TRENCH 5 AND LINE 6 OCTOBER 1993, PREPARED BY THE EARTH TECHNOLOGY CORPORATION
107. DRAFT FINAL ACCELERATED GROUNDWATER QUALITY ASSESSMENT FOR THE ASH DISPOSAL CELL IN TRENCH 5 AND LINE 6 OCTOBER 1994 VOLUME 1, PREPARED BY THE EARTH TECHNOLOGY CORPORATION
108. DRAFT FINAL ACCELERATED GROUNDWATER QUALITY ASSESSMENT FOR THE ASH DISPOSAL CELL IN TRENCH 5 AND LINE 6 OCTOBER 1994 VOLUME 2, PREPARED BY THE EARTH TECHNOLOGY CORPORATION
109. SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT DECEMBER 1, 1997 VOLUME 1, PREPARED BY HARZA
110. SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT DECEMBER 1, 1997 VOLUME 2, PREPARED BY HARZA
111. SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION (1997) REVISED DRAFT FINAL VOLUME 1 AUGUST 2001, PREPARED BY HARZA
112. SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION (1997) REVISED DRAFT FINAL VOLUME 2 AUGUST 2001, PREPARED BY HARZA
113. QUALITY CONTROL SUMMARY REPORT – SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATIONS JANUARY 1998, PREPARED BY HARZA
114. DRAFT GROUNDWATER FEASIBILITY STUDY REPORT DECEMBER 22, 1997, PREPARED BY HARZA
115. DRAFT WORK PLAN & DRAFT SAMPLING AND ANALYSIS PLAN – SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 800/PINKWATER LAGOON JULY 1998, PREPARED BY HARZA
116. DRAFT/FINAL WORK PLAN & DRAFT/FINAL SAMPLING AND ANALYSIS PLAN – SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 800/PINK WATER LAGOON AUGUST 1998, PREPARED BY HARZA
117. QUALITY CONTROL SUMMARY REPORT (DRAFT) – SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 800/PINK WATER LAGOON FEBRUARY 1999, PREPARED BY HARZA
118. ANALYTICAL DATA REPORT – SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT LINE 800/PINK WATER LAGOON MARCH 1999, PREPARED BY HARZA
119. WORK PLAN ADDENDUM – SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 800/PINK WATER LAGOON (DRAFT) SEPTEMBER 1999, PREPARED BY HARZA
120. RECOMMENDATIONS FOR ADDITIONAL REMEDIAL INVESTIGATION LINE 800/PINK WATER LAGOON, MAY 1999, PREPARED BY HARZA
121. DRAFT SUPPLEMENTAL REMEDIAL INVESTIGATION REPORT LINE 800/PINK WATER LAGOON FEBRUARY 2001, PREPARED BY HARZA
122. DRAFT FINAL SUPPLEMENTAL REMEDIAL INVESTIGATION REPORT LINE 800/PINK WATER LAGOON JULY 2001, PREPARED BY HARZA
123. DRAFT INTERIM GROUNDWATER FEASIBILITY STUDY REPORT AUGUST 4, 1998, PREPARED BY HARZA
124. DRAFT TECHNICAL MEMORANDUM FATE AND TRANSPORT OF CONTAMINANTS DRAFT 1999, PREPARED BY HARZA
DRAFT TECHNICAL MEMORANDUM EVALUATION OF CONTAMINANT SOURCES TO SURFACE STREAMS FEBRUARY 2001
DRAFT FINAL TECHNICAL MEMORANDUM EVALUATION OF CONTAMINANT SOURCES TO SURFACE STREAMS AUGUST 2001
125. OFF BASE RESIDENTIAL DRINKING WATER WELLS VOLUME 1, APRIL 1993
126. OFF BASE RESIDENTIAL DRINKING WATER WELLS VOLUME 2, APRIL 1993
126.1 1993 ACTION MEMO FOR OFFPOST RATHBUN HOOKUP
126.2 2001 ACTION MEMO ADDENDUM FOR PERMANENT POTABLE WATER SUPPLY
127. WORK PLAN & SAMPLING & ANALYSIS PLAN – GROUNDWATER INVESTIGATION OFFSITE GROUNDWATER INVESTIGATION (OU3) JUNE 1999, PREPARED BY HARZA
128. TRANSMITTAL OF DRAFT SUMMARY TABLES LABORATORY ANALYTICAL RESULTS OFFSITE GROUNDWATER INVESTIGATION PHASE 1 AUGUST 11, 1999, PREPARED BY HARZA
129. OFFSITE GROUNDWATER INVESTIGATION PHASE II, III, IV WORK PLAN ADDENDUM, PREPARED BY HARZA
130. TECHNICAL MEMORANDUM – SUPPLEMENTAL INVESTIGATION OFF SITE GROUNDWATER, SURFACE WATER & SEDIMENT JANUARY 25, 2000, PREPARED BY HARZA
131. PRELIMINARY DRAFT TECHNICAL MEMORANDUM – SUPPLEMENTAL INVESTIGATION OFFSITE GROUNDWATER PHASE III JULY 2000, PREPARED BY HARZA
132. QUALITY CONTROL SUMMARY REPORT OFFSITE GROUNDWATER INVESTIGATION (OU3) PHASE I, II, III SEPTEMBER 2000, PREPARED BY HARZA
133. QUALITY CONTROL SUMMARY REPORT OFF-SITE GROUNDWATER INVESTIGATION (OU3) PHASE IV MAY 2001, PREPARED BY HARZA
134. DRAFT TECHNICAL MEMORANDUM, SUPPLEMENTAL INVESTIGATION, OFF-SITE GROUNDWATER PHASE IV JULY 2001, PREPARED BY HARZA
135. FINAL TECHNICAL MEMORANDUM SUPPLEMENTAL INVESTIGATION OFF-SITE GROUNDWATER PHASE IV MAY 2002, PREPARED BY HARZA
136. DRAFT OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION WORK PLAN ADDENDUM AUGUST 2001, PREPARED BY URS
137. PUBLIC MEETING TRANSCRIPT, OFFPOST RATHBUN CONNECTION, AUGUST 18, 1993
138. DRAFT FINAL DIRECT PUSH FIELD INVESTIGATION TECHNICAL MEMORANDUM & REVISED WORK PLAN OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION APRIL 2002, PREPARED BY URS
142. DRAFT FINAL OFFSITE REMEDIAL INVESTIGATION REPORT APRIL 2003 VOLUME 1, PREPARED BY URS
143. DRAFT FINAL OFFSITE REMEDIAL INVESTIGATION REPORT APRIL 2003 VOLUME 2, PREPARED BY URS
147. DRAFT TECHNICAL MEMORANDUM GROUNDWATER FLOW AND CONTAMINANT FATE AND TRANSPORT MODELING OFF-SITE GROUNDWATER OCTOBER 2003, PREPARED BY URS
148. DRAFT FINAL OFF-SITE GROUNDWATER FEASIBILITY STUDY MARCH 2004, PREPARED BY URS
149. DRAFT FINAL TECHNICAL MEMORANDUM GROUNDWATER FLOW AND CONTAMINANT FATE AND TRANSPORT MODELING OFF-SITE GROUNDWATER MARCH 2004, PREPARED BY URS
151. REVISED DRAFT FINAL OFF-SITE GROUNDWATER PROPOSED PLAN JULY 2004 (2 COPIES)
155. DRAFT FINAL OFF-SITE GROUNDWATER ROD JANUARY 2005, PREPARED BY URS
156. DRAFT FINAL OFF-SITE GROUNDWATER RECORD OF DECISION MAY 2005, PREPARED BY URS
159. DRAFT FINAL OFF-SITE GROUNDWATER TREATABILITY STUDY WORK PLAN NOVEMBER 2004, PREPARED BY TETRA TECH
161. DRAFT TREATABILITY STUDY RESULTS FOR IN SITU ENHANCED DEGRADATION OF OFF-SITE GROUNDWATER OCTOBER 2005, PREPARED BY TETRA TECH
162. FINAL TREATABILITY STUDY RESULTS FOR IN SITU ENHANCED DEGARDATION OF OFF-SITE GROUNDWATER DATED AUGUST 2006, PREPARED BY TETRA TECH
164. DRAFT REMEDIATION DESIGN FOR AN ENHANCED DEGRADATION SYSTEM FOR RDX IN OFF-SITE GROUNDWATER, MARCH 2006, PREPARED BY TETRA TECH
165. DRAFT FINAL REMEDIAL DESIGN FOR AN ENHANCED DEGRADATION SYSTEM FOR RDX IN OFF-SITE GROUNDWATER, AUGUST 2006, PREPARED BY TETRA TECH
167. DRAFT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, APRIL 2007, PREPARED BY TETRA TECH
168. FINAL REDLINE/STRIKEOUT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, AUGUST 2007, PREPARED BY TETRA TECH
169. DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, DECEMBER 2007, PREPARED BY TETRA TECH
170. DRAFT FINAL REVISION 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, MAY 2008, PREPARED BY TETRA TECH
171. FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, APRIL 2009, PREPARED BY TETRA TECH
173. DRAFT OFFSITE GROUNDWATER REMEDIATION PROGRESS REPORT ONE (OCTOBER 2007-FEBRUARY 2008), JUNE 2009, PREPARED BY TETRA TECH
174. DRAFT FINAL OFFSITE GROUNDWATER REMEDIATION PROGRESS REPORT ONE (OCTOBER 2007-FEBRUARY 2008), NOVEMBER 2009, PREPARED BY TETRA TECH
176. DRAFT OFFSITE GROUNDWATER REMEDIATION PROGRESS REPORT TWO (FEBRUARY 2008-OCTOBER 2008), JUNE 2009, PREPARED BY TETRA TECH
183. TECHNICAL MEMORANDUM OFFSITE BRUSH CREEK SUPPLEMENTAL SURFACE WATER AND GROUNDWATER SAMPLING, FEBRUARY 2009, PREPARED BY TETRA TECH
184. TECHNICAL MEMORANDUM OFFSITE BRUSH CREEK SUPPLEMENTAL SURFACE WATER AND GROUNDWATER RESULTS COLLECTED MARCH/APRIL 2009, DATED JUNE 2009, PREPARED BY TETRA TECH
191. DRAFT FINAL FTP, WBPA, EBP FEASIBILTY STUDY DATA COLLECTION WORK PLAN ADDENDUM AUGUST 2002, PREPARED BY URS
195. DRAFT FIRE TRAINING PIT GROUNDWATER REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 MAY 2004, PREPARED BY URS
196. DRAFT FIRE TRAINING PIT GROUNDWATER REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 MAY 2004, PREPARED BY URS
197. DRAFT EAST BURN PADS GROUNDWATER REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JUNE 2004, PREPARED BY URS
198. DRAFT EAST BURN PADS GROUNDWATER REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JUNE 2004, PREPARED BY URS
199. DRAFT WEST BURN PADS GROUNDWATER INVESTIGATION VOLUME 1 JUNE 2004, PREPARED BY URS
200. DRAFT WEST BURN PADS GROUNDWATER INVESTIGATION VOLUME 2 JUNE 2004, PREPARED BY URS
201. SIX SITES FEASIBILITY STUDY DATA COLLECTION MONITORING WELL AND STAFF GUAGE INSTALLATION DOCUMENTATION AND PHOTO LOG MAY 2004, PREPARED BY URS
203. DRAFT SPRING CREEK, LONG CREEK AND SKUNK RIVER WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN OCTOBER 2004, PREPARED BY TETRA TECH
204. DRAFT FINAL SPRING CREEK, LONG CREEK AND SKUNK RIVER WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN JANUARY 2005, PREPARED BY TETRA TECH
206. DRAFT BRUSH CREEK WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN OCTOBER 2004, PREPARED BY TETRA TECH
207. REVISED DRAFT FINAL BRUSH CREEK WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN JANUARY 2005, PREPARED BY TETRA TECH
208. DRAFT FINAL BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN OCTOBER 2005, PREPARED BY TETRA TECH
209. DRAFT FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN VOLUME I OF II, OCTOBER 2005, PREPARED BY TETRA TECH
210. DRAFT FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN VOLUME II OF II, OCTOBER 2005, PREPARED BY TETRA TECH
211. DRAFT FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN, OCTOBER 2006, PREPARED BY TETRA TECH (Note: this is an incomplete document. It is still in redline strikeout format and the figures are not included).
212. FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN, DECEMBER 2006, VOLUME I OF II, PREPARED BY TETRA TECH
213. FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN, DECEMBER 2006, VOLUME II OF II, PREPARED BY TETRA TECH
216. DRAFT REMEDIAL INVISTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2007, VOLUME 1 OF 4, PREPARED BY TETRA TECH
217. DRAFT REMEDIAL INVISTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2007, VOLUME 2 OF 4, PREPARED BY TETRA TECH
218. DRAFT REMEDIAL INVISTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2007, VOLUME 3 OF 4, PREPARED BY TETRA TECH
219. DRAFT REMEDIAL INVISTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2007, VOLUME 4 OF 4, PREPARED BY TETRA TECH
220. REVISED DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2008, VOLUME 1 OF 4, PREPARED BY TETRA TECH
221. REVISED DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2008, VOLUME 2 OF 4, PREPARED BY TETRA TECH
222. REVISED DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2008, VOLUME 3 OF 4, PREPARED BY TETRA TECH
223. REVISED DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2008, VOLUME 4 OF 4, PREPARED BY TETRA TECH
233. DRAFT FINAL TECHNICAL MEMORANDUM GROUNDWATER FLOW AND TRANSPORT MODELING LINE 800 LAGOON FEBRUARY 2003, PREPARED BY URS
236. DRAFT FINAL LINE 800 PINKWATER LAGOON FEASIBILITY STUDY FEBRUARY 2003, PREPARED BY URS
238. DRAFT PROPOSED PLAN FOR THE LINE 800 PINKWATER LAGOON GROUNDWATER EXPLOSIVES PLUME APRIL 2003, PREPARED BY URS
240. DRAFT FINAL LINES 2, 3 & 9 FEASIBILITY STUDY DATA COLLECTION WORK PLAN AUGUST 2002, PREPARED BY URS
241. DRAFT FINAL LINE 3 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JANUARY 2004, PREPARED BY URS
242. DRAFT FINAL LINE 3 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JANUARY 2004, PREPARED BY URS
243. DRAFT FINAL LINE 9 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JANUARY 2004, PREPARED BY URS
244. DRAFT FINAL LINE 9 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JANUARY 2004, PREPARED BY URS
245. DRAFT FINAL LINE 2 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 FEBRUARY 2004, PREPARED BY URS
246. DRAFT FINAL LINE 2 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 FEBRUARY 2004, PREPARED BY URS
247. IAAP SAMPLING AND RECONNAISSANCE OF BRUSH CREEK 1/20/2004, PREPARED BY C.C. JOHNSON & MALHOTRA, P.C.
250. DRAFT FINAL BRUSH CREEK POINT SOURCE CONTROL WORK PLAN NOVEMBER 2004, PREPARED BY TETRA TECH
251. FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM DESIGN MARCH 2005, PREPARED BY TETRA TECH
252. FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM DESIGN MAY 2005, PREPARED BY TETRA TECH
253. DRAFT OPERATION AND MAINTENANCE MANUAL FOR BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM, DATED OCTOBER 2005, PREPARED BY TETRA TECH
254. FINAL OPERATION AND MAINTENANCE MANUAL FOR BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM, DATED JUNE 2006,
PREPARED BY TETRA TECH
254.1 FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM REPORT, APRIL 2008, PREPARED BY TETRA TECH
254.2 FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM REPORT, JUNE 2009, PREPARED BY TETRA TECH
255. DRAFT-FINAL TREATABILITY STUDY TEST PLAN FOR IN SITU BIODEGRADATION OF ON-POST GROUNDWATER APRIL 2005, PREPARED BY TETRA TECH
256. DRAFT TECHNICAL MEMORANDUM FULL SCALE TREATABILITY STUDY FOR IN SITU BIODEGRADATION OF ON POST GROUNDWATER, DATED SEPTEMBER 2007, PREPARED BY TETRA TECH
257. FINAL TECHNICAL MEMORANDUM FULL SCALE TREATABILITY STUDY FOR INSITU BIODEGRADATION OF ON POST GROUNDWATER, DATED FEBRUARY 2009, PREPARED BY TETRA TECH
310. MONITORING WELL INVENTORY VOLUME 1 1-93 THRU 800-MW-26
311. MONITORING WELL INVENTORY VOLUME 2 C95-1 THRU G-16
312. MONITORING WELL INVENTORY VOLUME 3 G-17 THRU JAW-45
313. MONITORING WELL INVENTORY VOLUME 4 JAW-46 THRU L3-MW2
314. MONITORING WELL INVENTORY VOLUME 5 L9-MW1 THRU MW-517
315. MONITORING WELL INVENTORY VOLUME 6 NBPLF-MW1 THRU WBP-MW3
315.1 MONITORING WELL INVENTORY VOLUME 7
315.2 MONITORING WELL INVENTORY VOLUME 8
315.3 MONITORING WELL INVENTORY VOLUME 9
316. MONITORING WELL MANAGEMENT PLAN (DRAFT REPORT) JANUARY 1999, PREPARED BY HARZA
317. DRAFT FINAL – LETTER WORK PLAN FOR MONITORING WELL ABANDONMENT AND MAINTENANCE APRIL 12, 2000, PREPARED BY TN & ASSOCIATES
318. MONITORING WELL MAINTENANCE AND ABANDONMENT REPORT 10/17/00, PREPARED BY TN & ASSOCIATES
319. FINAL SPRING 2001 GROUNDWATER MONITORING WORK PLAN ADDENDUM MAY 2001, PREPARED BY URS
320. DRAFT FINAL FACILITY WIDE WORK PLAN FEBRUARY 2002, PREPARED BY URS
321. DRAFT SPRING 2002 GROUNDWATER MONITORING WORK PLAN ADDENDUM MAY 2002, PREPARED BY HYDROGEOLOGIC
324. DRAFT FINAL 2003 GROUNDWATER MONITORING REPORT VOLUME 1 DECEMBER 2004, PREPARED BY HYDROGEOLOGIC
325. DRAFT FINAL 2003 GROUNDWATER MONITORING REPORT VOLUME 2 DECEMBER 2004, PREPARED BY HYDROGEOLOGIC
328. DRAFT FINAL 2004 GROUNDWATER MONITORING REPORT, VOLUME 1 OF 2, FEBRUARY 2005, PREPARED BY HYDROGEOLOGIC
329. DRAFT FINAL 2004 GROUNDWATER MONITORING REPORT, VOLUME 2 OF 2, FEBRUARY 2005, PREPARED BY HYDROGEOLOGIC
330. DRAFT GROUNDWATER MONITORING PROGRAM JANUARY 2005, PREPARED BY TETRA TECH
331. DRAFT FALL 2005 GROUNDWATER AND SURFACE WATER SAMPLING PROGRAM WORK PLAN SEPTEMBER 2005, PREPARED BY TETRA TECH
333. DRAFT FINAL 2004-2005 GROUNDWATER SAMPLING REPORT, DECEMBER 2005, PREPARED BY TETRA TECH
336. DRAFT 2006 GROUNDWATER SAMPLING REPORT, JULY 2007, PREPARED BY TETRA TECH
337. FINAL 2006 GROUNDWATER SAMPLING REPORT, FEBRUARY 2009, PREPARED BY TETRA TECH
338. CONCENTRATION TRENDS FOR SELECTED WELLS AND PARAMETERS, AUGUST 2007, PREPARED BY TETRA TECH
340. DRAFT 2007 GROUNDWATER SAMPLING REPORT, DECEMBER 2007, PREPARED BY TETRA TECH
341. FINAL 2007 GROUNDWATER SAMPLING REPORT, FEBRUARY 2009, PREPARED BY TETRA TECH
400. REPLACE/UPGRADE EXPLOSIVES COLLECTION SUMPS STUDY DECEMBER 14, 1990, PREPARED BY MASON & HANGER
401. FINAL REPORT – CONTAMINATION ASSESSMENT OF CONCRETE SUMPS JUNE 9, 1993, PREPARED BY JAYCOR
402. FINAL EE/CA FOR SUMPS OCTOBER 11, 1994, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
403. FINAL ENGINEERING EVALUATION/COST ANALYSIS FOR PESTICIDE PIT REMOVAL AUGUST 16, 1994 & OCTOBER 11, 1994, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
404. PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS REMOVAL ACTIONS SEPTEMBER 1, 1994, PREPARED BY OHM
405. DRAFT ACTION MEMO PESTICIDE PIT AND SUMPS MARCH 7, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
406. ACTION MEMORANDUM FOR THE PESTICIDE PIT MARCH 20, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
407. FINAL ACTION MEMORANDUM FOR THE EXPLOSIVE – CONTAMINATED SUMP REMOVAL NOVEMBER 3, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
408. SAMPLING AND ANALYSIS PLAN FOR RAPID RESPONSE INTERIM REMOVAL ACTIONS AT THE PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS, APRIL 1995, PREPARED BY OHM
409. FINAL WORK PLAN – RAPID RESPONSE INTERIM REMOVAL ACTION @ THE PESTICIDE PIT & EXPLOSIVE CONTAMINATED SUMPS APRIL 11, 1995, PREPARED BY OHM
410. DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 1, PREPARED BY OHM
411. DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 2, PREPARED BY OHM
412. DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 3, PREPARED BY OHM
413. DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 4, PREPARED BY OHM
414. DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 5, PREPARED BY OHM
415. FINAL REPORT ADDENDUM FOR FINAL TRANSPORTATION AND DISPOSAL AND OTHER ACTIVITIES, NOVEMBER 6, 1996, PREPARED BY OHM
416. DRAFT FINAL REPORT ENDANGERMENT ASSESSMENT FORMER LINE 1 IMPOUNDMENT AND LINE 800 PINK WATER LAGOON JULY 1989, PREPARED BY DAMES & MOORE
417. DRAFT FINAL FEASIBILITY STUDY FORMER LINE 1 IMPOUNDMENT AND PINKWATER LAGOON AUGUST 1989, PREPARED BY DAMES & MOORE
418. DRAFT FINAL REPORT (REVISED) FEASIBILITY STUDY FORMER LINE 1 IMPOUNDMENT AND PINK WATER LAGOON JUNE 1, 1994, PREPARED BY JAYCOR AND CDM FEDERAL PROGRAMS CORPORATION
419. DRAFT FINAL REPORT (REVISED) BASELINE HUMAN HEALTH ECOLOGICAL RISK ASSESSMENT FORMER LINE 1 IMPOUNDMENT AND PINK WATER LAGOON JUNE 1, 1994, PREPARED BY JAYCOR AND ICAIR
420. DRAFT EE/CA FOR THE PINKWATER LAGOON AND THE LINE 1 IMPOUNDMENT, DECEMBER 1994, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
421. DRAFT FIELD INVESTIGATION REPORT FORMER LINE 1 IMPOUNDMENT AND LINE 800 PINK WATER LAGOON APRIL 1995, PREPARED BY THE CORPS OF ENGINNERS
422. DRAFT EVALUATION OF TREATMENT ALTERNATIVES LINE 1 IMPOUNDMENT AND LINE 800 PINKWATER LAGOON, JUNE 15, 1995, PREPARED BY PLEXUS CORP.
423. DRAFT ACTION MEMORANDUM FOR THE LINE 800 PINK WATER LAGOON LINE 1 IMPOUNDMENT AND EXPLOSIVES-CONTAMINATED SOIL STOCK PILE SEPTEMBER 7 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
424. ACTION MEMORANDUM FOR THE LINE 800 PINK WATER LAGOON AND FORMER LINE 1 IMPOUNDMENT OCTOBER 1996, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
425. LINE 1 & 800 PHYTOREMEDIATION MONITORING FEBRUARY 5, 1999, PHYTOREMEDIATION RESULTS FALL 1997
PHYTOREMEDIATION RESULTS 1997, PREPARED BY ECC
426. ACTION MEMORANDUM FOR THE INERT LANDFILL OCTOBER 4, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
427. ACTION MEMORANDUM FOR THE INERT LANDFILL SEPTEMBER 1997, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
428. DRAFT EE/CA FOR MULTIPLE REMOVAL ACTIONS MARCH 6, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
429. DRAFT EE/CA MULTIPLE REMOVAL ACTIONS VOLUME 1 APRIL 3, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
430. DRAFT EE/CA MULTIPLE REMOVAL ACTIONS VOLUME 2 APRIL 3, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
431. DRAFT FINAL ENGINEERING EVALUATION/COST ANALYSIS FOR THREE REMOVAL ACTIONS VOLUME 2 APPENDICES MAY 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
432. ACTION MEMO MULTIPLE REMOVAL ACTIONS AUGUST 17, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION
433. DESIGNATION OF CAMU MARCH 8, 1996
434. FINAL WORK PLAN FOR MULTIPLE REMOVAL ACTIONS AUGUST 31, 1996, PREPARED BY ECC
435. MULTIPLE REMOVAL ACTIONS – CONSTRUCTION PROGRESS PHOTOGRAPHS SEPTEMBER 1997, PREPARED BY THE CORPS OF ENGINNERS
436. DRAFT FINAL REPORT – MULTIPLE REMOVAL ACTIONS JANUARY 11, 1999, PREPARED BY ECC
437. FINAL REPORT – MULTIPLE REMOVAL ACTIONS APRIL 2001, PREPARED BY ECC
438. DRAFT ENGINEERING EVALUATION/COST ANALYSIS – FIRE TRAINING PIT JANUARY 1996, PREPARED BY HARZA
439. FINAL ENGINEERING EVALUATION/COST ANALYSIS – FIRE TRAINING PIT MAY 1996, PREPARED BY HARZA
440. DRAFT ACTION MEMORANDUM & EXPLANATION OF SIGNIFICANT DIFFERENCE – FIRE TRAINING PIT NOV 1997, PREPARED BY ECC
441. FINAL FIRE TRAINING PIT - EXPLANATION OF SIGNIFICANT DIFFERENCE & ACTION MEMORANDUM, DECEMBER 1997, PREPARED BY ECC
442. FINAL WORK PLAN , FINAL SAMPLING AND ANALYSIS PLAN ADDENDUM, FINAL SITE SAFETY & HEALTH PLAN ADDENDUM – FIRE TRAINING PIT JULY 1998, PREPARED BY ECC
443. DRAFT REMEDIAL ACTION REPORT – FIRE TRAINING PIT JUNE 1999, PREPARED BY ECC
444. FINAL REMEDIAL ACTION – FIRE TRAINING PIT OCTOBER 2000, PREPARED BY ECC
445. DRAFT SUPPLEMENTAL RA WORK PLAN FOR THE FIRE TRAINING PIT REMOVAL ACTION JULY & AUGUST 2003, PREPARED BY ECC
446. FINAL SUPPLEMENTAL WORK PLAN FOR THE FIRE TRAINING PIT REMOVAL ACTION JULY & AUGUST 2003, PREPARED BY ECC
448. DRAFT REMEDIAL ACTION REPORT ADDENDUM FOR THE FIRE TRAINING PIT SEPTEMBER 2003, PREPARED BY ECC
448B. DRAFT ADDENDUM REMEDIAL ACTION REPORT FOR THE FIRE TRAINING PIT REMOVAL ACTION APPENDIX B VOLUME 2 JULY 28 2005, PREPARED BY ECC
448C. DRAFT ADDENDUM REMEDIAL ACTION REPORT FOR THE FIRE TRAINING PIT REMOVAL ACTION APPENDIX B VOLUME 3 JULY 28 2005, PREPARED BY ECC
448D. DRAFT ADDENDUM REMEDIAL ACTION REPORT FOR THE FIRE TRAINING PIT REMOVAL ACTION APPENDIX B VOLUME 4 JULY 28 2005, PREPARED BY ECC
450. DRAFT FINAL ADDENDUM REMEDIAL ACTION REPORT FOR THE FIRE TRAINING PIT AUGUST 2005, PREPARED BY ECC
451. DRAFT FINAL SOILS FOCUSED FEASIBILITY STUDY VOLUME 1 OF 1 PREPARED BY JAYCOR 24 JUNE 1996
452. DRAFT FINAL SOILS FOCUSED FEASIBILITY VOLUME 1 OF 1 PREPARED BY ENGINEERED EFFICIENCY NOVEMBER 1996
453. EPA REGION VII REWRITE OF FOCUSED FEASIBILITY STUDY JANUARY 1997
454. SOILS FOCUSED FEASIBILITY STUDY VOLUME 1 OF 1 PREPARED BY ENGINEERED EFFICIENCY MAY 8, 1997
455. DRAFT SOILS FEASIBILITY STUDY MARCH 27, 1997, PREPARED BY ENGINEERED EFFICIENCY
456. DRAFT FINAL FEASIBILITY STUDY FOR OPERABLE UNIT 1: CONTAMINATED SOILS NOVEMBER 10, 1997 PREPARED BY ENGINEERED EFFICIENCY
457. DRAFT ENVIRONMENTAL PROTECTION PLAN OCTOBER 14, 1997, PREPARED BY ECC
458. DRAFT/FINAL SOILS FEASIBILITY STUDY REPORT MAY 18, 1998, PREPARED BY HARZA
459. FINAL SOILS FEASIBILITY STUDY REPORT/OPERABLE UNIT NO. 1 JUNE 19, 1998, PREPARED BY HARZA
460. FOCUSED SOILS PROPOSED PLAN MAY 1997
461. SUPERFUND PROPOSED PLAN SOILS OPERABLE UNIT #1, DRAFT MARCH 1997, DRAFT FINAL MAY 1998, FINAL JUNE 1998
462. PUBLIC MEETING TRANSCRIPT JULY 9, 1998
463. U.S. ARMY INTERIM SOILS ACTION FOR OPERABLE UNIT #1 RECORD OF DECISION MARCH 4, 1998
464. DRAFT RECORD OF DECISION SOILS OPERABLE UNIT #1 JULY 1998, PREPARED BY HARZA
465. FINAL RECORD OF DECISION SOILS OPERABLE UNIT #1 AUGUST 1998
466. DRAFT FINAL ESD FOR THE FINAL ROD FOR THE SOILS OPERABLE UNIT (OU-1) JANUARY 2003 SIGNED APRIL 2003 (2 COPIES)
466.2 DRAFT ESD FOR DELETION OF RADIOLOGICALLY CONTAMINATED SOILS FROM RECORD OF DECISION (ROD) SOILS OU1, DECEMBER 2005
466.3 FINAL ESD FOR DELETION OF RADIOLOGICAL CONTAMINANTS FROM INTERIM RECORD OF DECISION (IROD) SOILS OPERABLE UNIT 1, JUNE 2006, PREPARED BY TETRA TECH
466.5 EXPLANATION OF SIGNIFICANT DIFFERENCES FOR THE INTERIM ACTION RECORD OF DECISION (IROD) SOILS OU1 – ADDITION OF ENVIRONMENTAL PROTECTIVENESS TO THE REMEDY AND TRANSFER OF SITES FROM OU4 TO OU1, JANUARY 2008, PREPARED BY TETRA TECH
466.6 FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES FOR THE INTERIM ACTION RECORD OF DECISION (IROD) SOILS OU1 – ADDITION OF ENVIRONMENTAL PROTECTIVENESS TO THE REMEDY AND TRANSFER OF SITES FROM OU4 TO OU1, JUNE 2008, PREPARED BY TETRA TECH
467. SUMMARY REPORT – PRE-DESIGN EXCAVATION DELINEATION DECEMBER 1998 LINE 5A/5B ROUNDHOUSE RDX SITE IDA STORAGE/BURNING GROUNDS, PREPARED BY THE CORPS OF ENGINEERS, DECEMBER 1998
466.8 DRAFT ESD FOR THE FINAL RECORD OF DECISION SOILS OU1 CHANGE OF PRIMARY TREATMENT TECHNOLOGY FROM BIOLOGICAL TO ALKALINE HYDROLYSIS CHEMICAL TREATMENT, JUNE 2009
468. A.O. CONSTRUCTION PROJECTS SAMPLING AND ANALYSIS WORKPLAN JAN 2002, PREPARED BY URS
469. DRAFT REPORT OF ACTION LAUNDRY EFFLUENT PRETREATMENT SAMPLING & ANALYSIS SEPTEMBER 1997, PREPARED BY MASON & HANGER
470. FINAL REVISED WORK PLAN & REVISED CQCP-PHASE 1 MAY 12, 1998, PREPARED BY ECC
471. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 OCTOBER 2000 BOOK 1 OF 19, PREPARED BY ECC
472. DRAFT FINAL WORK PLAN ADDENDUM, CONTINGENCY PLAN, CQCP ADDENDUM. SAP ADDENDUM, SSHP ADDENDUM PHASE 2 JUNE 1999, PREPARED BY ECC
473. INFORMATION SUMMARY FOR FOCUSED FEASIBILITY STUDY SITES, PREPARED BY CORPS OF ENGINEERS, SEPTEMBER 1996
474. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APRIL 2001 BOOK 1 OF 21, PREPARED BY ECC
478. DRAFT FINAL WORK PLAN AMENDMENT FOCUSED FEASIBILITY STUDIES SOILS REMEDIATION BARIUM CONTAMINATED SOILS STABILIZATION VOLUME 1 OF 2 OCTOBER 2000, PREPARED BY CAPE ENVIRONMENTAL
479. WORK PLAN AMENDMENT FOCUSED FEASIBILITY STUDIES SOILS REMEDIATION BARIUM CONTAMINATED SOILS STABILIZATION VOLUME 2 OF 2 OCTOBER 2000, PREPARED BY CAPE ENVIRONMENTAL
481. BIOREMEDIATION/METALS TREATMENT WBPLF SOILS IN INERTLANDFILL TRENCH 6 & 7 JULY 24, 2001 WORK PLAN AMENDMENT, PREPARED BY CAPE ENVIRONMENTAL
482. BIOREMEDIATION/METALS TREATMENT WBPLF SOILS IN INERTLANDFILL TRENCH 6 & 7 SUPPLEMENTAL WORK PLAN AUGUST 7, 2001, PREPARED BY CAPE ENVIRONMENTAL
483. DRAFT FINAL WORK PLAN ADDENDUM METALS TREATMENT WEST BURN PADS LANDFILL SOILS IN INERT LANDFILL TRENCH 6 & 7 AUGUST 2002, PREPARED BY CAPE ENVIRONMENTAL
484. DRAFT FINAL EXCAVATION REPORT PHASE 3 NOVEMBER 2001, PREPARED BY ECC
487. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY SOIL STUDY SITES, PHASE III REMEDIAL ACTION-WBPA DEC 2002, PREPARED BY CAPE ENVIRONMENTAL
491. DRAFT FINAL FACILITY WIDE WORK PLAN REMEDIAL DESIGN/REMEDIAL ACTION ACTIVITES OPERABLE UNIT 1 REVISION 2, JULY 2003, PREPARED BY SHAW
492. DRAFT LABORATORY QUALIFICATIONS PACKAGE 10/15/03, PREPARED BY SHAW
504. DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL REMEDIAL DESIGN (INCLUDING HAS) FOR PHASE 4 SOIL SITE MARCH 2003 VOLUME 1, PREPARED BY TN & ASSOCIATES
505. DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL REMEDIAL DESIGN (INCLUDING HAS) FOR PHASE 4 SOIL SITE MARCH 2003 VOLUME 2, PREPARED BY TN & ASSOCIATES
507. DRAFT PROPOSED REVISIONS TO WORK PLAN FOR SUPPLEMENTAL REMEDIAL DESIGN PHASE 4 SOIL SITES, OPERABLE UNIT 1 DECEMBER 22, 2003, PREPARED BY SHAW
508. DRAFT REMEDIAL ACTION ADDENDUM FOR SOILS EXCAVATION PHASE 4 SOILS SITES JANURARY 20, 2004, PREPARED BY SHAW
509. DRAFT FINAL REMEDIAL ACTION WORK PLAN FOR SOIL EXCAVATION PHASE 4 SOIL SITES MAY 20, 2004, PREPARED BY SHAW
511. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005, PREPARED BY SHAW
511A. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005, PREPARED BY SHAW
511B. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 1 OF 15, PREPARED BY SHAW
511C. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 2 OF 15, PREPARED BY SHAW
511D. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 3 OF 15, PREPARED BY SHAW
511E. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 4 OF 15, PREPARED BY SHAW
511F. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 5 OF 15, PREPARED BY SHAW
511G. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 6 OF 15, PREPARED BY SHAW
511H. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 7 OF 15, PREPARED BY SHAW
511I. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 8 OF 15, PREPARED BY SHAW
511J. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 9 OF 15, PREPARED BY SHAW
511K. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 10 OF 15, PREPARED BY SHAW
511L. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 11 OF 15, PREPARED BY SHAW
511M. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 12 OF 15, PREPARED BY SHAW
511N. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 13 OF 15, PREPARED BY SHAW
511O. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 14 OF 15, PREPARED BY SHAW
511P. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 15 OF 15, PREPARED BY SHAW
512. FINAL REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 2005, PREPARED BY SHAW ENVIRONMENTAL, INC.
513. DRAFT HISTORICAL SITE ASSESMENT FOR LINE 6, LINE 800, CENTRAL TEST AREA, AND DEACT FURNACE SEPTEMBER 2003, PREPARED BY TN & ASSOCIATES
514. DRAFT FINAL HISTORICAL RECORDS REVIEW FOR LINE 6, LINE 800, CENTRAL TEST AREA, AND DEACTIVATION FURNACE OCTOBER 2004, PREPARED BY TN & ASSOCIATES
516. DRAFT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OU#1 OCTOBER 2004, PREPARED BY TETRA TECH
517. DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OPERABLE UNIT 1 FEBRUARY 2005, PREPARED BY TETRA TECH
518. REVISED DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OPERABLE UNIT 1 JUNE 2005, PREPARED BY TETRA TECH
521. DRAFT FINAL OPERATIONS AND MAINTENANCE OPTIMIZATION PLAN AT THE INERT DISPOSAL AREA, LINE 1 POND, AND LINE 800 LAGOON SEPTEMBER 2005, PREPARED BY TETRA TECH
521.1 FINAL OPERATIONS AND MAINTENANCE OPTIMIZATION PLAN AT THE INERT DISPOSAL AREA, LINE 1 POND, AND LINE 800 LAGOON FEBRUARY 2009, PREPARED BY TETRA TECH
522. OVERALL OPERABLE UNIT 1 DATA – ALL EXCAVATIONS DONE AT THE IAAAP BY SITE, DEPTH OF SAMPLING POINTS, SOURCES OF CONTAMINATION, TRENCH CHARTS, FIGURES AND TABLES, MAY 2005, PREPARED BY TETRA TECH
523. IDA TOPOGRAPHICAL SURVEY JULY 27, 2005 MARTIN 7 WHITACRE SURVEYORS & ENGINEERS, INC
524. DRAFT FINAL TECHNICAL MEMORANDUM CESIUM SOURCE EVALUATION SEPTEMBER 2005, PREPARED BY TETRA TECH
524.1 FINAL TECHNICAL MEMORANDUM CESIUM SOURCE EVALUATION, FEBRUARY 2009, PREPARED BY TETRA TECH
526. DRAFT FINAL OPERATION AND MAINTENANCE PLAN FOR IDA, LINE 1 IMPOUNDMENT, AND LINE 800 LAGOON, DATED APRIL 2006, PREPARED BY TETRA TECH
527. FINAL OPERATION AND MAINTENANCE PLAN FOR IDA, LINE 1 IMPOUNDMENT, AND LINE 800 LAGOON, DATED FEBRUARY 2009, PREPARED BY TETRA TECH
531. DRAFT HISTORICAL SITE ASSESSMENT FOR LINE 2, 3, 3A, INCENDIARY DISPOSAL AREA, OLD FLYASH WASTE PILE, POSSIBLE DEMOLITION SITE, EXPLOSIVE WASTE INCINERATOR, CONSTRUCTION DEBRIS LANDFILL AND LINE 3A POND AUGUST 25, 2004, PREPARED BY SHAW
532. DRAFT FINAL HISTORICAL RECORDS REVIEW FOR LINE 2, 3, 3A, INCENDIARY DISPOSAL AREA, OLD FLYASH WASTE PILE, POSSIBLE DEMOLITION SITE, EXPLOSIVE WASTE INCINERATOR, CONSTRUCTION DEBRIS LANDFILL AND LINE 3A POND JANUARY 5, 2005, PREPARED BY SHAW
538. DRAFT WORK PLAN FOR SOIL SAMPLING LINE 7 DECONTAMINATION AND DECOMMISSIONING ACTIVITIES, JANUARY 2006, PREPARED BY TETRA TECH
539. DRAFT FINAL SITE SAFETY AND HEALTH PLAN REMEDIAL DESIGN/REMEDIAL ACTION ACTIVITIES DECEMBER 2005, PREPARED BY TETRA TECH
541. DRAFT MEMORANDUM FOR POST-RECORD OF DECISION CHANGE FOR THE INCLUSION OF OPERABLE UNIT 4 SOILS TO OPERABLE UNIT 1 FEBRUARY 2006, PREPARED BY TETRA TECH
542. PROPOSED EXCAVATIONS FOR LINES 3 AND 3A, SEPTEMER 2005, PREPARED BY TETRA TECH
543. OU1 SOIL EXCAVATION PLANS, VOLUME 1 OF 2, SUMMER 2006, PREPARED BY TETRA TECH
544. OU1 SOIL EXCAVATION PLANS, VOLUME 2 OF 2, SUMMER 2006, PREPARED BY TETRA TECH
545. DRAFT TECHNICAL MEMORANDUM FOR NO FURTHER REMEDIAL ACTION OF COPPER IMPACTED DITCH SOILS DOWNSTREAM OF LOAD LINE 3, OPERABLE UNIT 1, SEPTEMBER 2006 AND MAY 2007 SUBMITTALS, PREPARED BY TETRA TECH
547. DRAFT EXCAVATION PLAN FOR REMEDIAL ACTION FOR PHASES 5, 7, AND 7 OF OPERABLE UNIT 1, MARCH 2007, PREPARED BY TETRA TECH
548. DRAFT FINAL EXCAVATION PLAN FOR REMEDIAL ACTION FOR PHASES 5, 7, AND 7 OF OPERABLE UNIT 1, JULY 2007, PREPARED BY TETRA TECH
550. DRAFT REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION SIDE ECOLOGICAL EVALUATION, JULY 2007, PREPARED BY TETRA TECH
551. DRAFT FINAL REDLINE STRIKEOUT REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, MAY 2008, PREPARED BY TETRA TECH
552. DRAFT FINAL REV. 1 REDLINE STRIKEOUT REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, AUGUST 2008, PREPARED BY TETRA TECH
553. DRAFT FINAL REV. 2 REDLINE STRIKEOUT REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, FEBRUARY 2009, PREPARED BY TETRA TECH
554. FINAL REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, VOLUME 1 OF 2, AUGUST 2009, PREPARED BY TETRA TECH
555. FINAL REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, VOLUME 2 OF 2, AUGUST 2009, PREPARED BY TETRA TECH
572. DRAFT FINAL SUPPLEMENTAL RI FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA AND LINE 3A POND JULY 2003, PREPARED BY MKM ENGINEERS
573. DRAFT FINAL VERSION 2 SUPPLEMENTAL RI FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA AND LINE 3A POND OCTOBER 2003, PREPARED BY MKM ENGINEERS
574. DRAFT FINAL VERSION 3 SUPPLEMENTAL RI FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR JANUARY 2004, PREPARED BY MKM ENGINEERS
575. DRAFT FINAL VERSION 4 SOIL DATA COLLECTION FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR MAY 2004, PREPARED BY MKM ENGINEERS
576. DRAFT FINAL VERSION 5 SOIL DATA COLLECTION FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR JULY 2004, PREPARED BY MKM ENGINEERS
579. DRAFT FINAL REPORT FOR THE SOIL DATA COLLECTION AT THE INCENDIARY DISPOSAL AREA, FLY ASH WASTE PILE, POSSIBLE DEMOLITION SITE, LINE 3A POND, EXPLOSIVE WASTE INCINERATOR AND CONSTRUCTION DEBRIS LANDFILL MAY 2005, PREPARED BY MKM ENGINEERS
581. DRAFT SUPPLEMENTAL REMEDIAL INVESTIGATION WORK PLAN FOR OU4 OCTOBER 2004, PREPARED BY TETRA TECH
582. DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 FEBRUARY 2005, PREPARED BY TETRA TECH
583. DRAFT FINAL (REVISION 1) WORK PLAN FOR SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 AUGUST 2005, PREPARED BY TETRA TECH
584. DRAFT FINAL (REVISION 2) WORK PLAN FOR SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 MAY 2006, PREPARED BY TETRA TECH
586. DRAFT SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, DATED APRIL 2006, PREPARED BY TETRA TECH
587. DRAFT SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 – APPENDICES APRIL 2006, PREPARED BY TETRA TECH
588. DRAFT FINAL SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 1 OF 2, DATED AUGUST 2006, PREPARED BY TETRA TECH
589. DRAFT FINAL SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 2 OF 2, DATED AUGUST 2006, PREPARED BY TETRA TECH
589.1 REVISED DRAFT FINAL SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 1 OF 2, DATED APRIL 2007, PREPARED BY TETRA TECH
589.2 REVISED DRAFT FINAL SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 2 OF 2, DATED APRIL 2007, PREPARED BY TETRA TECH
589.3 DRAFT FINAL REV. 1 SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 1 OF 2, DATED JULY 2008, PREPARED BY TETRA TECH
589.4 DRAFT FINAL REV. 1 SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 2 OF 2, DATED JULY 2008, PREPARED BY TETRA TECH
589.5 DRAFT FINAL REV. 2 SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, DATED SEPTEMBER 2009, PREPARED BY TETRA TECH
591. DRAFT FEASIBILITY STUDY FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA (IDA) OU4, JULY 2006, PREPARED BY TETRA TECH
592. DRAFT FINAL REDLINE/STRIKEOUT FOCUSED FEASIBILITY STUDY FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA (IDA) OU4, OCTOBER 2006, PREPARED BY TETRA TECH
593. FINAL FOCUSED FEASIBILITY STUDY FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA (IDA) OU4, JANUARY 2007, PREPARED BY TETRA TECH
594. DRAFT (SECURITY REVIEW) PROPOSED PLAN FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA, JANUARY 2007, PREPARED BY TETRA TECH
595. DRAFT PROPOSED PLAN FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA, JANUARY 2007, PREPARED BY TETRA TECH
596. FINAL PROPOSED PLAN FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA, MAY 2007, PREPARED BY TETRA TECH
598. DRAFT INTERIM ACTION RECORD OF DECISION FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA IN SOILS OU4, SEPTEMBER 2007, PREPARED BY TETRA TECH
599. DRAFT FINAL INTERIM ACTION RECORD OF DECISION FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA IN SOILS OU4, REDLINE STRIKEOUT VERSION, DECEMBER 2007, PREPARED BY TETRA TECH
599.1 DRAFT FINAL REV. 1 INTERIM ACTION RECORD OF DECISION FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA IN SOILS OU4, REDLINE STRIKEOUT VERSION, FEBRUARY 2008, PREPARED BY TETRA TECH
599.1.1 DRAFT FINAL REV. 1 INTERIM ACTION RECORD OF DECISION FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA IN SOILS OU4, SEPTEMBER 2008, PREPARED BY TETRA TECH
599.3 DRAFT REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION AREA (CEA), SEPTEMBER 2008, PREPARED BY TETRA TECH
599.4 DRAFT FINAL REDLINE STRIKEOUT REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION AREA (CEA), DECEMBER 2008, PREPARED BY TETRA TECH
599.5 FINAL REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION AREA (CEA), APRIL 2009, PREPARED BY TETRA
599.6 DRAFT CONSTRUCTION QA/QC PLAN (ATTACHMENT 1 TO THE REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION ARE (CEA), JANUARY 2009, PREPARED BY TETRA TECH
599.7 DRAFT FINAL REDLINE STRIKEOUT CONSTRUCTION QA/QC PLAN [ATTACHMENT 1 TO THE REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION ARE (CEA)], APRIL 2009, PREPARED BY TETRA TECH
599.8 FINAL CONSTRUCTION QA/QC PLAN [ATTACHMENT 1 TO THE REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION ARE (CEA)], MAY 2009, PREPARED BY TETRA TECH
601. DRAFT REMEDIAL ACTION WORK PLAN FOR SOILS TREATMENT AT INERT DISPOSAL AREA DECEMBER 2004, PREPARED BY TETRA TECH
602. DRAFT FINAL REMEDIAL ACTION WORK PLAN FOR SOILS TREATMENT AT THE INERT DISPOSAL AREA APRIL 2005, PREPARED BY TETRA TECH
602.1 DRAFT FINAL (REVISION 1) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, APRIL 2007, PREPARED BY TETRA TECH
602.2 DRAFT FINAL (REVISION 2) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, AUGUST 2007, PREPARED BY TETRA TECH
602.3 DRAFT FINAL (REVISION 3) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, FEBRUARY 2008, PREPARED BY TETRA TECH
602.4 DRAFT FINAL (REVISION 4) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, JUNE 2008, PREPARED BY TETRA TECH
602.5 DRAFT FINAL (REVISION5) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, JUNE 2008, PREPARED BY TETRA TECH
602.6 DRAFT FINAL (REVISION 6) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, AUGUST 2008, PREPARED BY TETRA TECH
602.6.2 DRAFT REMEDIAL ACTION REPORT FOR BIOLOGICAL SOIL TREATMENT AT THE INERT DISPOSAL AREA, OCTOBER 2009
602.6.3 FINAL REMEDIAL ACTION REPORT FOR BIOLOGICAL SOIL TREATMENT AT THE INERT DISPOSAL AREA, JANUARY 2010
603. DRAFT SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7 JULY 2005, PREPARED BY TETRA TECH
604. DRAFT (REVISION 1) SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7 AUGUST 2005, PREPARED BY TETRA TECH
605. DRAFT FINAL SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7, DECEMBER 2005, PREPARED BY TETRA TECH
606. DRAFT FINAL REVISION 1 SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7 (CAMU), FEBRUARY 2006, PREPARED BY TETRA TECH
607. DRAFT FINAL REVISION 2 SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7 (CAMU), MARCH 2006, PREPARED BY TETRA TECH
607.1 STATUS REPORT FOR SOIL CHEMICAL TREATMENT INERT DISPOSAL AREA, FEBRUARY 2009, PREPARED BY TETRA TECH
607.2.1STATUS REPORT FOR SOIL CHEMICAL TREATMENT INERT DISPOSAL AREA, MARCH 2009, PREPARED BY TETRA TECH
607.4 TECHNICAL MEMORANDUM FOR SOIL TREATMENT RESULTS FOR ALKALINE HYDROLYSIS IN TRENCH 6 INERT DISPOSAL AREA, JULY 2009, PREPARED BY TETRA TECH
607.5 FINAL TECHNICAL MEMORANDUM FOR SOIL TREATMENT RESULTS FOR ALKALINE HYDROLYSIS IN TRENCH 6 INERT DISPOSAL AREA, NOVEMBER 2009, PREPARED BY TETRA TECH
609. DRAFT FINAL BRUSH CREEK SURFACE WATER AND SEDIMENT INVESTIGATION WORK PLAN OPERABLE UNIT 4 JANUARY 2006, PREPARED BY TETRA TECH
610. DRAFT FINAL BRUSH CREEK SURFACE WATER AND SEDIMENT INVESTIGATION WORK PLAN OPERABLE UNIT 4, FEBRUARY 2006, PREPARED BY TETRA TECH
610.1 PROGRESS REPORT: EVALUATION OF PHASE 1 SEDIMENT AND SURFACE WATER DATA AND RECOMMENDATIONS FOR PHASE 2 SAMPLING IN BRUSH CREEK, BRUSH CREEK SURFACE WATER AND SEDIMENT INVESTIGATION OPERABLE UNIT 4, MAY 2007, PREPARED BE TETRA TECH
610.2 DRAFT PROGRESS REPORT: EVALUATION OF PHASE 1 SEDIMENT AND SURFACE WATER DATA AND RECOMMENDATIONS FOR PHASE 2 SAMPLING IN BRUSH CREEK, BRUSH CREEK SURFACE WATER AND SEDIMENT INVESTIGATION OPERABLE UNIT 4, JULY 2007, PREPARED BY TETRA TECH
610.3 PROGRESS REPORT: EVALUATION OF PHASE 1 AND PHASE 2 BRUSH CREEK SEDIMENT AND SURFACE WATER DATA AND RECOMMENDATIONS FOR PHASE 3 SAMPLING IN BRUSH CREEK, JULY 2008, PREPARED BY TETRA TECH
632. DRAFT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR CAPPING OF TRENCH 6, MARCH 2010, PREPARED BY TETRA TECH
633. DRAFT ATTACHMENT 1 TO THE REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR CAPPING OF TRENCH 6: CONSTRUCTION QUALITY ASSURANCE/QUALITY CONTROL PLAN, MARCH 2010, PREPARED BY TETRA TECH
655. DRAFT FINAL MEC DENSITY SURVEY REPORT FOR LINE 6 AND THE CENTRAL TEST AREA MAY 2005, PREPARED BY MKM ENGINEERS
701. DRAFT FIVE YEAR REVIEW AUGUST 2004, PREPARED BY THE CORPS OF ENGINEERS
703. DRAFT FINAL FIVE YEAR REVIEW VOLUME 1, DECEMBER 2004, PREPARED BY THE CORPS OF ENGINEERS
704. DRAFT FINAL FIVE YEAR REVIEW VOLUME 2, DECEMBER 2004, PREPARED BY THE CORPS OF ENGINEERS
705. REVISED DRAFT FINAL FIVE YEAR REVIEW, JANUARY 2006, PREPARED BY THE CORPS OF ENGINEERS
706. REVISED DRAFT FINAL FIVE YEAR REVIEW REPORT, FEBRUARY 2006, PREPARED BY TETRA TECH
707. FINAL FIVE-YEAR REVIEW REPORT, MARCH 2006, PREPARED BY TETRA TECH
721. IAAP CLOSURE PLAN LINE 6 30 JUNE – 30 JULY 1988
722. SITE CLEAN-UP REPORT CONTAMINATED WASTE PROCESSOR NOVEMBER 17, 1993, PREPARED BY GEOTECHNICS
723. DRAFT CLOSURE PLAN LINE 6 & BILLET SPLITTER SITE FEBRUARY 1992, PREPARED BY THE CORPS OF ENGINEERS
724. INERT LANDFILL CLOSURE PLANS 1994, PREPARED BY THE CORPS OF ENGINEERS
725. CLOSURE/POST CLOSURE PLANS FOR THE INERT LANDFILL APRIL 1998
AMENDMENT TO CLOSURE/POST CLOSURE PLAN FEBRUARY 1997, PREPARED BY THE CORPS OF ENGINEERS
726. RCRA CLOSURE REPORT EXPLOSIVE WASTE INCINERATOR JUNE 1998, PREPARED BY PDC TECHNICAL SERVICES
727. FACILITY REDUCTION PROGRAM LINE 7 AND BUILDINGS 500-30-10 AND 500-197-3 CLOSE OUT REPORT, JUNE 2005, PREPARED BY PARSONS
750. DRAFT (REVISION 2) DECONTAMINATION AND DEMOLITION LOAD, ASSEMBLY, AND PACK (LAP) LINES 5A, 5B, 6, 7, 8, 9, AND 800 WORK PLAN AUGUST 2005, PREPARED BY PLEXUS SCIENTIFIC CORPORATION.
751. DRAFT FINAL (REVISION 4) DECONTAMINATION AND DEMOLITION LOAD, ASSEMBLY, AND PACK (LAP) LINES 5A, 5B, 6, 7, 8, 9, AND 800 WORK PLAN, NOVEMBER 2005, PREPARED BY PLEXUS SCIENTIFIC CORPORATION.
752. DECONTAMINATION/DEMOLITION OF LINES 5A, 5B, 6, 7, 8, 9, AND 800 VOLUME II HEALTH AND SAFETY PLAN AUGUST 2005. PLEXUS SCIENTIFIC CORPORATION.
753. FINAL 3X BUILDING ASSESSMENT AND WASTE CHARACTERIZATION, JANUARY 2006, PREPARED BY PLEXUS SCIENTIFIC
754. LUCE COMPANIES WORK PLAN TLC JOB NO. 2122
755. ASBESTOS REMOVAL FOR LINE 7, 23 NOVEMBER 2005, PREPARED BY PLEXUS SCIENTIFIC
756. DOCUMENTATION OF ASBESTOS REMOVAL/DISPOSAL AT LINE 7, 5 DECEMBER 2005, PREPARED BY PLEXUS SCIENTIFIC
757. DRAFT FINAL REPORT FOR LINE 7 DECONTAMINATION AND DEMOLITION, MARCH 2006, PREPARED BY PLEXUS SCIENTIFIC
758. FRP SAMPLING AND ANALYSIS PLAN, PART 1: FIELD SAMPLING PLAN DEMOLITION OF MULTIPLE BUILDINGS, BHATE ENVIRONMENTAL ASSOCIATES, OCTOBER 2008
759. COMPLETION REPORT: DEMOLITION OF MULTIPLE BUILDINGS, AUGUST 2007, PREPARED BY BHATE ASSOCIATES
760. FRP SAMPLING AND ANALYSIS PLAN, PART 1: FIELD SAMPLING PLAN DEMOLITION OF MULTIPLE BUILDINGS, BHATE ENVIRONMENTAL ASSOCIATES, AUGUST 2009
761. FRP SAMPLING AND ANALYSIS PLAN, PART 2: QUALITY ASSURANCE PROJECT PLAN DEMOLITION OF MULTIPLE BUILDINGS, BHATE ENVIRONMENTAL ASSOCIATES, AUGUST 2009
762. FRP SAMPLING AND ANALYSIS PLAN, REVISION 2, PART 1: FIELD SAMPLING PLAN POST BUILDING DEMOLITION SAMPLING, ADDENDUM TO DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION ACTIVITIES OPERABLE UNIT 1, BHATE ENVIRONMENTAL ASSOCIATES, MARCH 2010
763. FRP SAMPLING AND ANALYSIS PLAN, REVISION 2, PART 2: QUALITY ASSURANCE PROJECT PLAN DEMOLITION OF MULTIPLE BUILDINGS, BHATE ENVIRONMENTAL ASSOCIATES, MARCH 2010
800. DRAFT WORK/QUALITY ASSURANCE PLAN – ECOLOGICAL RISK ASSESSMENT ADDENDUM JUNE 1997, PREPARED BY THE HARZA
801. FINAL WORK/QUALITY ASSURANCE PLAN – ECOLOGICAL RISK ASSESSMENT
ADDENDUM JULY 1997, PREPARED BY THE HARZA
802. HISTORICAL ECOLOGICAL RISK ASSESSMENT ADDENDUM, DRAFT REPORT, OCTOBER 1997, VOLUME 1, PREPARED BY THE HARZA
803. HISTORICAL ECOLOGICAL RISK ASSESSMENT ADDENDUM, DRAFT FINAL REPORT, MARCH 1998, VOLUME 1, PREPARED BY THE HARZA
804. DRAFT TECHNICAL MEMORANDUMS NO 1-4 FOR THE ECOLOGICAL RISK ASSESSMENT, APRIL 2002
805. MODIFICATION TO THE SAMPLING & ANALYSIS PLAN (SAP) REVISED INVESTIGATION RELATED TO THE ECOLOGICAL ASSESSMENT APRIL 10, 2000, PREPARED BY THE HARZA
806. ECO-RISK ROUND 2 SAMPLING SEPTEMBER 2000, PREPARED BY THE HARZA
807. ECOLOGICAL RISK ASSESSMENT – SCREENING LEVEL ASSESSMENT, APRIL 4 2001, PREPARED BY THE HARZA
808. DEVELOPMENT OF DOSE ESTIMATION MODELS AND TOXICITY REFERENCE VALUES ECOLOGICAL RISK ASSESSMENT AUGUST 2001, PREPARED BY THE HARZA
809. SCREENING LEVEL RISK ASSESSMENT, ECOLOGICAL RISK ASSESSMENT AUGUST 2001, PREPARED BY THE HARZA
810. ADDENDUM TO SCREENING LEVEL RISK ASSESSMENT ECOLOGICAL RISK ASSESSMENT DECEMBER 2001, PREPARED BY THE HARZA
815. DRAFT BASELINE ECOLOGICAL RISK ASSESSMENT VOLUME 1 OCTOBER 2003, PREPARED BY THE HARZA
816. DRAFT BASELINE ECOLOGICAL RISK ASSESSMENT VOLUME 2 OCTOBER 2003, PREPARED BY THE HARZA
819. PRESUBMITTAL DRAFT FINAL BASELINE ECOLOGICAL RISK ASSESSMENT AUGUST 2004
820. DRAFT FINAL BASELINE ECOLOGICAL RISK ASSESSMENT VOLUME 1 OCTOBER 2004, PREPARED BY THE HARZA
821. DRAFT FINAL BASELINE ECOLOGICAL RISK ASSESSMENT VOLUME 2 OCOTBER 2004, PREPARED BY THE HARZA
823. TECHNICAL MEMORANDUM TO CLOSE OUT BASELINE ECOLOGICAL RISK ASSESSMENT (BERA), DATED APRIL 2006, PREPARED BY TETRA TECH
826. ENVIRONMENTAL BASELINE SURVEY, PROJECT NO. IAANG 03007, TRANSFER OF LAND TO IOWA NATIONAL GUARD, BARKER LEMAR, JULY 20, 2005
900. ANNUAL REPORT 2000 REGISTRY OF HAZARDOUS WASTE
901. ANNUAL REPORT 1999 REGISTRY OF HAZARDOUS WASTE
902. ANNUAL REPORT 1998 REGISTRY OF HAZARDOUS WASTE
903. ANNUAL REPORT 1997 REGISTRY OF HAZARDOUS WASTE
904. SEMINAR PUBLICATION – TRANSPORT AND FATE OF CONTAMINANTS IN THE SUBSURFACE
905. HANDBOOK – REMEDIATION OF CONTAMINATED SEDIMENTS
906. SEMINAR PUBLICATION – SITE CHARACTERIZATION FOR SUBSURFACE REMEDIATION
907. STABILIZATION/SOLIDIFICATION OF CERCLA & RCRA WASTES – PHYSICAL TESTS, CHEMICAL TESTING PROCEDURES, TECHNOLOGY SCREENING & FIELD ACTIVITIES
908. CONTROL OF AIR EMISSIONS FROM SUPERFUND SITES
909. HANDBOOK – GROUNDWATER AND WELLHEAD PROTECTION
910. HANDBOOK – CONTROL TECHNOLOGIES FOR HAZARDOUS POLLUTANTS
911. HANDBOOK – APPROACHES FOR THE REMEDIATION OF FEDERAL FACILITIES SITES CONTAMINATED WITH EXPLOSIVES OR RADIOACTIVE WASTE
912. HANDBOOK – RECYCLING AND REUSE OF MATERIAL FOUND ON SUPERFUND SITES
913. COMMUNITY RELATIONS IN SUPERFUND: A HANDBOOK
914. ENVIRONMENTAL QUALITY – 1975
915. FIELD DEMONSTRATION OF SLURRY REACTOR BIOTREATMENT OF EXPLOSIVES-CONTAMINATED SOURCES
916. EXPLOSIVE SOIL COMPOSTING 1991
917. WHAT WORKS? ALTERNATIVE STRATEGIES FOR SUPERFUND CLEANUPS SEPTEMBER 1991
918. MAKING SUPERFUND WORK RECOMMENDATIONS TO IMPROVE PROGRAM IMPLEMENTATIONS JANUARY 1989
919. SECTION 106, STEP-BY-STEP
920. SUPERFUND GUIDANCE FEBRUARY 1994
921. FINAL REPORT OF THE FEDERAL FACILITIES ENVIRONMENTAL RESTORATION DIALOGUE COMMITTEE APRIL 1996
922. FINAL REPORT OF THE FEDERAL FACILITIES ENVIRONMENTAL RESTORATION DIALOGUE COMMITTEE APRIL 1996
923. GROUNDWATER NOVEMBER – DECEMBER 1992
924. EVALUATION OF GROUNDWATER QUALITY IN THE SKUNK RIVER BASIN
925. EVALUATION OF SW846 METHOD 8330 FOR CHARACTERIZATION OF SITES CONTAMINATED WITH RESIDUES OF HIGH EXPLOSIVES
926. INTERIM REPORT OF THE FEDERAL FACILITIES ENVIRONMENTAL RESTORATION DIALOGUE COMMITTEE FEB 1993
ENVIRONMENTAL ACRONYMS, ABBREVIATIONS AND GLOSSARY OF TERMS
927. ENVIRONMENTAL QUALITY TECHNOLOGY DEMONSTRATION, EVALUATION AND TRANSFER ACTIVITIES ANNUAL REPORT
928. REMEDIATION TECHNOLOGIES SCREENING MATRIX AND REFERENCE GUIDE
930. ARMY GUIDANCE CONCERNING RESTORATION ADVISORY BOARDS
RESTORATION ADVISORY BOARD (RAB) RESOURCE BOOK
931. ARMY MATERIAL COMMAND FOST/FOSL GUIDANCE FEBRUARY 1998
932. BIOLOGICAL SURVEY OF FEDERALLY ENDANGERED BATS SEPTEMBER 1998
933. 2003 INDIANA BAT INVSETIGATIONS
934. DRAFT ENVIRONMENT SITE CLOSEOUT GUIDE NOVEMBER 1998
935. EPA CITIZEN’S GUIDES TO CLEAN-UP TECHNOLOGIES
936. FEDERAL FACILITIES AGREEMENT
937. GUIDANCE ON CONDUCTING NON-TIME CRITICAL REMOVAL ACTIONS UNDER CERCLA
938. INDEPENDENT TECHNICAL REVIEW QUESTIONNAIRE, JANUARY 29, 1999
939. MANAGEMENT GUIDANCE FOR THE DEFENSE ENVIRONMENTAL RESTORATION PROGRAM & DRAFT MANAGEMENT GUIDANCE FOR THE DERP SEPTEMBER 2001
940. U.S. ARMY ENVIRONMENTAL RESTORATION PROGRAM GUIDANCE MANUAL APRIL 4, 1998
941. PRINCIPLES OF ENVIRONMENTAL RESTORATION AND THEIR APPLICATION TO STREAM LINING INITIATIVES
942. REQUIREMENTS FOR THE PREPARATION OF SAMPLING & ANALYSIS PLAN
943. THE ROAD TO ROD
944. SUPERFUND AMENDMENTS OF AND REAUTHORIZATION ACT 1986
945. SUPERFUND REMOVAL PROCEDURE ACTION MEMORANDUM GUIDANCE
946. PHYTOREMEDIATION STUDIES
947. INTERIM ARMY LAND USE CONTROLS (LUC) MANAGEMENT PLAN AUGUST 2001
948. LINKING LEGACIES CONNECTING THE COLDWAR NUCLEAR WEAPONS PRODUCTION PROCESSES TO THEIR ENVIRONMENTAL CONSEQUENCES
949. DOCUMENTS THAT CORRESPOND TO DSERTS SITES
950. LINE 6 SEWER COLLECTION SYSTEM VISUAL RECCONNAISSANCE FOR UXO 3/25/03
951. POLYCHLORINATED BIPHENYL (PCB) SITE REVITALIZATION GUIDANCE UNDER THE TOXIC SUBSTANCES CONTROL ACT (TSCA), EPA, NOVEMBER 2005
1000. DRAFT CLOSED, TRANSFERRING, AND TRANSFERRED RANGE/SITE INVENTORY REPORT, AUGUST 2003, PREPARED BY ENGINEERING-ENVIRONMENTAL MANAGEMENT
1001. FINAL CLOSED, TRANSFERRING, AND TRANSFERRED RANGE/SITE INVENTORY REPORT, OCTOBER 2003, PREPARED BY ENGINEERING-ENVIRONMENTAL MANAGEMENT
1002. DRAFT U.S. ARMY OPERATIONAL RANGE INVENTORY SUSTAINMENT FY06, JUNE 2006, PREPARED BY USAEC
1003. FINAL U.S. ARMY OPERATIONAL RANGE INVENTORY SUSTAINMENT FY06, FEBRUARY 2007, PREPARED BY USAEC
1005. DRAFT HISTORICAL RECORDS REVIEW FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, MARCH 2007, PREPARED BY URS
1006. FINAL HISTORICAL RECORDS REVIEW FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, JULY 2007, PREPARED BY URS
1007. FINAL SITE INSPECTION REPORT FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2007, PREPARED BY URS
1009. DRAFT CHECK COPY REMEDIAL INVESTIGATION WORK PLAN FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2007, PREPARED BY URS
1010. DRAFT REMEDIAL INVESTIGATION WORK PLAN FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2007, PREPARED BY URS
1011. DRAFT FINAL REMEDIAL INVESTIGATION WORK PLAN FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, APRIL 2008, PREPARED BY URS
1012. FINAL PROJECT MANAGEMENT PLAN FOR THE MILITARY MUNITIONS RESPONSE PROGRAM REMEDIAL INVESTIGATION WORK PLAN, AUGUST 2007, PREPARED BY URS
1014. DRAFT WORK PLAN ADDENDUM MILITARY MUNITIONS RESPONSE PROGRAM GEOPHYSICAL PROVE-OUT PLAN, APRIL 2008, PREPARED BY URS
1015. DRAFT FINAL WORK PLAN ADDENDUM MILITARY MUNITIONS RESPONSE PROGRAM GEOPHYSICAL PROVE-OUT PLAN, JUNE 2008, PREPARED BY URS
1016. DRAFT GEOPHYSICAL INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, 30 JULY 2008, PREPARED BY URS
1017. DRAFT FINAL GEOPHYSICAL INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2008, PREPARED BY URS
1018. DRAFT GEOPHYSICAL PROVE-OUT TECHNICAL MEMORANDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, AUGUST 2008, PREPARED BY URS
1019. DRAFT FINAL GEOPHYSICAL PROVE-OUT TECHNICAL MEMORANDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2008, PREPARED BY URS
1020. DRAFT INTRUSIVE INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, FEBRUARY 2008, PREPARED BY URS
1021. DRAFT INTRUSIVE INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, FEBRUARY 2009, PREPARED BY URS
1022. DRAFT FINAL INTRUSIVE INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, MAY 2009, PREPARED BY URS
1024. DRAFT REMEDIAL INVESTIGATION REPORT FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, MAY 2010, PREPARED BY URS
S100. DOCUMENTS FROM REPOSITORIES-DOCUMENT 1 NEWS RELEASE ENVIRONMENTAL STUDY BEGINS DATED AUGUST 1991, DOCUMENT 3 CONCEPTUAL PROGRAM PLAN FOR THE RI/FS AT IAAP DATED SEPTEMBER 12, 1991, DOCUMENT 5 WATER QUALITY QUESTIONNAIRES WITH COVER LETTER DATED OCTOBER 29 ,1992, DOCUMENT 6 TECHNICAL REVIEW COMMITTE MINUTES DATED MAY 19, 1993 DOCUMENT 7 ADDITIONAL WATER QUALITY QUESTIONNAIRES
S101. CONTAMINATION SURVEY SCOPE OF WORK
S102. CONCEPTUAL PROGRAM PLAN FOR RI/FS AT IAAAP SEPTEMBER 12, 1991, JAYCOR
S103. SAMPLING AND ANALYSIS PLAN AND QUALITY ASSURANCE PROJECT PLAN VOLUME 1 JUNE 1991, JAYCOR
S104. SAMPLING AND ANALYSIS PLAN AND FIELD SAMPLING PLAN VOLUME 2 JUNE 1991, JAYCOR
S105. SAMPLING AND ANALYSIS PLAN AND QUALITY ASSURANCE PROJECT PLAN VOLUME 1 JULY1991, JAYCOR
S106. RISK ASSESSMENT PROTOCOL OCTOBER 1992, JAYCOR
S107. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 1 OF 10, JAYCOR
S108. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 2 OF 10, JAYCOR
S109. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 3 OF 10, JAYCOR
S110. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 4 OF 10, JAYCOR
S111. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 5 OF 10, JAYCOR
S112. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 6 OF 10, JAYCOR
S113. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 7 OF 10, JAYCOR
S114. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 8 OF 10, JAYCOR
S115. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 9 OF 10, JAYCOR
S116. DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 10 OF 10, JAYCOR
S117. DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 1 OF 7, JAYCOR
S118. DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 2 OF 7, JAYCOR
S119. DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 3 OF 7, JAYCOR
S120. DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 4 OF 7, JAYCOR
S121. DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 5 OF 7, JAYCOR
S122. DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 6 OF 7, JAYCOR
S123. DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 7 OF 7, JAYCOR
S124. DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 7 OF 7, JAYCOR
S125. DRAFT FOLLOW ON REMEDIAL INVESTIGATIO SAMPLING ADDENDUM DECEMBER 1, 1994, JAYCOR
S126. DRAFT WORK PLAN FOR SUUPLEMENTAL REMEDIAL INVESTIGATION FOR LINE 1 AND THE FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) VOLUME 1 MARCH 29, 2001, TN & A ASSOCIATES
S127. DRAFT WORK PLAN FOR SUPLEMENTAL REMEDIAL INVESTIGATION FOR LINE 1 AND THE FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) VOLUME 2 MARCH 29, 2001, TN & A ASSOCIATES
S150. TEST BORING AND MONITORING WELL INSTALLATION PLAN AT THE INERT LANDFILL AND LINE 6 DECEMBER 1987, TERRACON EC
S151. SAMPLING AND ANALYSIS PLAN/ QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR INERT LANDFILL AND LINE 6 MARCH 1988, TERRACON EC
S152. GROUNDWATER ASSESSMENT TRENCH 5 AND LINE 6 MAY 5, 1994
S153. SITE GROUNDWATER INVESTIGATION FIRE TRAINING PIT WORK PLAN (FINAL) SAMPLING AND ANALYSIS PLAN (FINAL) APRIL 1997, HARZA
S154. DRAFT SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT HISTORICAL VOLUME 1 APRIL 1997, HARZA
S155. DRAFT SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT HISTORICAL VOLUME 2 APRIL 1997, HARZA
S200. DRAFT GROUNDWATER FLOW MODELING LINE 800 PINKWATER LAGOON JUNE 2002 – WITHDRAWN, URS
S202. draft technical memorandum groundwater flow modeling line 800 pinkwater lagoon, URS AUGUST 2002
S204. DRAFT LINE 800 PINKWATER LAGOON FEASIBILITY STUDY AUGUST 2002, URS
S205. DRAFT FINAL LINE 800 PINKWATER LAGOON FEASIBILITY STUDY FEBRUARY 2003, URS
S206. DRAFT FINAL TECHNICAL MEMORANDUM GROUNDWATER FLOW AND CONTAMINANT FATE AND TRANSPORT MODELING LINE 800 PINK WATER LAGOON FEBRUARY 2003, URS
S208. DRAFT LINE 800 PINK WATER LAGOON PROPOSED PLAN APRIL 2003, URS
S209. OFF-SITE MONITORING WELL AND STAFF GAUGE PHOTOGRAPHIC LOG DECEMBER 2002, URS
S210. DRAFT FINAL OFF-SITE REMEDIAL INVESTIGATION VOLUME 1 APRIL 2003, URS
S211. DRAFT FINAL OFF-SITE REMEDIAL INVESTIGATION VOLUME 2 APRIL 2003, URS
S212. DRAFT FINAL OFF-SITE GROUNDWATER FEASIBILITY STUDY MARCH 2004, URS
S213. DRAFT FINAL OFF-SITE GROUNDWATER TECHNICAL MEMORANDUM FOR GROUNDWATER FLOW AND CONTAMINANT FATE AND TRANSPORT MODELING, URS MARCH 2004
S214. DRAFT DIRECT PUSH FIELD INVESTIGATION TECHNICAL MEMORANDUM & REVISED WORK OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION, URS, FEBRUARY 2002
S216. DRAFT OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION DECEMBER 2002 VOLUME 1, URS
S217. DRAFT OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION DECEMBER 2002 VOLUME 2, URS
S219. DRAFT OFF-SITE GROUNDWATER FEASIBILITY STUDY, DATED SEPTEMBER 2003, URS
S221. OFF-SITE GROUNDWATER PROPOSED PLAN PUBLIC MEETING HANDOUTS
PUBLIC MEETING TRANSCRIPT FOR OFF POST GROUNDWATER PROPOSED PLAN (2 COPIES), 2004, URS
S223. DRAFT OFF-SITE GROUNDWATER ROD, DATED SEPTEMBER 2004, URS
S224. DRAFT FINAL OFF-SITE GROUNDWATER RECORD OF DECISION MAY 2005, URS
S226. DRAFT OFF-SITE GROUNDWATER TREATABILITY STUDY WORK PLAN AUGUST 2004, TETRA TECH
S227. DRAFT FINAL OFF-SITE GROUNDWATER TREATABILITY STUDY WORK PLAN NOVEMBER 2004, TETRA TECH
S241. DRAFT LINES 2, 3 & 9 FEASIBILITY STUDY DATA COLLECTION WORK PLAN AUGUST 2002, URS
S242. DRAFT FINAL SPRING CREEK, LONG CREEK AND SKUNK RIVER WATERSHED EVALUATION AND DATA COLLECTION WORK PLAN, DATED JANUARY 2005, PREPARED BY TETRA TECH
S243. DRAFT FINAL BRUSH CREEK WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN JANUARY 2005, TETRA TECH
S246. DRAFT BRUSH CREEK POINT SOURCE CONTROL WORK PLAN AUGUST 2004, TETRA TECH
S247. DRAFT FINAL BRUSH CREEK POINT SOURCE CONTROL WORK PLAN NOVEMBER 2004, TETRA TECH
S248. FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM DESIGN MAY 2005, TETRA TECH
S249. DRAFT-FINAL TREATABILITY STUDY TEST PLAN FOR IN SITU BIODEGRADATION OF ON-POST GROUNDWATER APRIL 2005, TETRA TECH
S250. INITIAL GROUNDWATER ANALYTICAL RESULTS & PROPOSED MONITORING WELL LOCATIONS SIX SITES FEASIBILITY STUDY DATA COLLETION JANUARY 30, 2003, URS
S251. INITIAL GROUNDWATER ANALYTICAL RESULTS & PROPOSED MONITORING WELL LOCATIONS SIX SITES FEASIBILITY STUDY DATA COLLETION FEBRUARY 20, 2003, URS
S252. INITIAL GW ANALYTICAL RESULTS 6 SITES FS DATA COLLECTION 9/9/03, URS
S253. SIX SITES FEASIBILITY STUDY DATA COLLECTION MONITORING WELL AND STAFF GAUGE INSTALLATION DOCUMENTATION & PHOTO LOG MAY 2004, URS
S254. DRAFT FIRE TRAINING PIT REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 MAY 2004, URS
S255. DRAFT FIRE TRAINING PIT REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 MAY 2004, URS
S256. DRAFT EAST BURN PADS REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JUNE 2004, URS
S257. DRAFT EAST BURN PADS REMEDIAL ALTERNATVE ANALYSIS VOLUME 2 JUNE 2004, URS
S258. DRAFT WEST BURN PADS GROUNDWATER INVESTIGATION VOLUME 1 JUNE 2004, URS
S259. DRAFT WEST BURN PADS GROUNDWATER INVESTIGATION VOLUME 2 JUNE 2004, URS
S260. DRAFT LINE 3 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JANUARY 2004, URS
S261. DRAFT LINE 3 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JANUARY 2004, URS
S262. DRAFT LINE 9 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JANUARY 2004, URS
S263. DRAFT LINE 9 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JANUARY 2004, URS
S264. DRAFT LINE 2 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 FEBRUARY 2004, URS
S265. DRAFT LINE 2 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 FEBRUARY 2004, URS
S266. DRAFT FTP, WBPA, EBP FEASIBILTY STUDY DATA COLLECTION WORK PLAN ADDENDUM AUGUST 2002, URS
S300. FINAL SUPPLEMENTAL RA WORK PLAN FOR THE FIRE TRAINING PIT REMOVAL ACTION JULY & AUGUST 2003, ECC
S301. DRAFT FINAL FACILITY WIDE WORK PLAN REMEDIAL DESIGN/REMEDIAL ACTION ACTIVITIES OPERABEL UNIT 1 REVISION 2 JULY 2003, SHAW
S302. DRAFT WORK PLAN AMENDMENT & SAP AMENDMENT & SSHP AMENDMENT PHASE 3 DECEMBER 1999, ECC
S303. DRAFT WORK PLAN AMENDMENT FOCUSED FEASIBILITY STUDIES SOILS REMEDIATION BARIUM – CONTAMINATED SOILS STABILIZATION AUGUST 2000, CAPE ENVIRONMENTAL
S304. DRAFT TREATABILITY STUDY FOR BARIUM IMPACTED SOIL STABILIZATION AUGUST 2000, CAPE ENVIRONMENTAL
S305. BIOREMEDIATION/METALS TREATMENT JUNE 14, 2001, CAPE ENVIRONMENTAL
S307. DRAFT REMEDIAL ACTION REPORT FOCUSED FEASIBILITY SOIL STUDY SITES, PHASE III REMEDIAL ACTION-WBPA MAY 2002, CAPE ENVIRONMENTAL
S310. DRAFT FACILITY WIDE WORK PLAN FOR REMEDIAL DESIGN/ REMEDIAL ACTION ACTIVITIES, DATED 3/20/03 VOLUME 1, SHAW
S313. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOIL SITES VOLUME 1 OCTOBER 2002, TN & ASSOCIATES
S314. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOIL SITES VOLUME 2 OCTOBER 2002, TN & ASSOCIATES
S315. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 5 SOIL SITES VOLUME 1 OCTOBER 2002, TN & ASSOCIATES
S316. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 5 SOIL SITES VOLUME 2 OCTOBER 2002, TN & ASSOCIATES
S317. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 1 DECEMBER 2002, TN & ASSOCIATES
S318. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 2 DECEMBER 2002, TN & ASSOCIATES
S319. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 3 DECEMBER 2002, TN & ASSOCIATES
S320. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 4 DECEMBER 2002, TN & ASSOCIATES
S321. DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 5 DECEMBER 2002, TN & ASSOCIATES
S322. DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOIL SITES VOLUME 1 MARCH 2003, TN & ASSOCIATES
S323. DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOIL SITES VOLUME 2 MARCH 2003, TN & ASSOCIATES
S328. DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OPERABLE UNIT 1 FEBRUARY 2005, TETRA TECH
S329. revised DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OPERABLE UNIT 1 JUNE 2005, TETRA TECH
S400. TRENCH 5 REPORT 1995, EARTH TECH
S401. TRENCH 5 REPORT 1996, EARTH TECH
S402. TRENCH 5 REPORT 1997, MASON & HANGER
S403. TRENCH 5 REPORT 1998, MASON & HANGER
S404. TRENCH 5 REPORT 1999, AMERICAN ORDNANCE
S405. ANNUAL REPORT SEMI ANNUAL GROUNDWATER MONITORING REPORT ASH DISPOSAL CELL TRENCH 5, INERT DISPOSAL AREA MARCH 2000, TN & ASSOCIATES
S406. ASH DISPOSAL CELL TRENCH 5, INERT DISPOSAL AREA MONITORING WELL INSTALLATION WORK PLAN AUGUST 30, 2000, TN & ASSOCIATES
S407. INTERIM REPORT SEMI ANNUAL GROUNDWATER MONITORING ASH DISPOSAL CELL TRENCH 5 INERT DISPOSAL AREA OCTOBER 2001, URS
S408. ANNUAL REPORT SEMI ANNUAL GROUNDWATER MONITORING (INCLUDING NEW MONITORING WELL INSTALLATIONS) ASH DISPOSAL CELL, TRENCH 5 REPORT 2001, TN & ASSOCIATES
S409. TRENCH 5 REPORT 2001, URS
S410. TRENCH 5 REPORT 2002, HYDROLGEOLOGIC
S411. TRENCH 5 REPORT 2003, HYDROLGEOLOGIC
S412. TRENCH 5 REPORT 2004, HYDROLGEOLOGIC
S412.1.2005 SEMI-ANNUAL GROUNDWATER MONITORING REPORT – TRENCH 5 INERT DISPOSAL AREA, DATED FEBRUARY 2006, TETRA TECH
S412.2 DRAFT 2006 SEMI-ANNUAL GROUNDWATER MONITORING REPORT – ASH DISPOSAL CELL AT TRENCH 5 INERT DISPOSAL AREA, DATED FEBRUARY 2007, TETRA TECH
S413. PROJECT SUMMARY REPORT FOR THE ENVIRONMENTAL GROUNDWATER MONITORING COVERING THE PERIOD 15 JULY 1994 – 30 JUNE 1995, TECHNICAL DATA REPORT FOR THE ENVIRONMENTAL GROUNDWATER MONITORING FY1994 SAMPLING, TECHNICAL DATA REPORT FOR THE ENVIRONMENTAL GROUNDWATER MONITORING FY1995, LB&M ASSOCIATES
S414. REPORT FOR THE FALL 1995 MONITORING OF IRP WELLS, MASON & HANGER
S415. REPORT FOR THE SPRING 1996 MONITORING OF IRP WELLS, MASON & HANGER
S416. REPORT FOR THE FIRST CYCLE 1997 MONITORING OF IRP WELLS, MASON & HANGER
S417. REPORT FOR THE SECOND CYCLE 1997 MONITORING OF IRP WELLS, MASON & HANGER
S418. DRAFT LONG-TERM MONITORING EVENTS FALL 1999 AND SPRING 2000 WORK PLAN ADDENDUM OCTOBER 1999, HARZA
S419. DRAFT LONG-TERM MONITORING EVENTS FALL 1999 AND SPRING 2000 WORK PLAN ADDEDUM NOVEMBER 1999, HARZA
S420. LONG-TERM MONITORING SPRING 2000 WORK PLAN ADDENDUM MARCH 2000, HARZA
S421. LONG-TERM MONITORING SPRING 2000 WORK PLAN ADDENDUM APRIL 2000, HARZA
S422. WELL COMPLETION REPORT FALL 1999 LONG-TERM GROUNDWATER MONITORING EVENT JUNE 2000, HARZA
S423. LONG-TERM MONITORING REPORT FALL 1999 JUNE 2000, HARZA
S424. MONITORING WELL MAINTENANCE & ABANDONMENT REPORT OCTOBER 2000, TN & ASSOCIATES
S425. QUALITY CONTROL SUMMARY REPORT GROUNDWATER MONITORING PROGRAM FALL 1999 SAMPLING EVENT JULY 2000, HARZA
S426. WELL COMPLETION REPORT SPRING 2000 GROUNDWATER MONITORING EVENT JULY 2000, HARZA
S427. GROUNDWATER MONITORING REPORT SPRING 2000 OCTOBER 2000, HARZA
S428. QUALITY CONTROL SUMMARY REPORT GROUNDWATER MONITORING PROGRAM SPRING 2000 SAMPLING EVENT AUGUST 2001, HARZA
S429. DRAFT GROUNDWATER MONITORING PROGRAM JANUARY 2001 DRAFT FINAL GROUNDWATER MONITORING PROGRAM AUGUST 2001, HARZA
S430. DRAFT FALL 2001 GROUNDWATER MONITORING INTERIM REPORT APRIL 2001 VOLUME 1, URS
S431. DRAFT FALL 2001 GROUNDWATER MONITORING INTERIM REPORT APRIL 2001 VOLUME 2, URS
S432. DRAFT FALL 2000 GROUNDWATER MONITORING RESULTS SUMMARY APRIL 2001, URS
S433. DRAFT FALL 2000 SPRING 2001 GROUNDWATER MONITORING REPORT SEPTEMBER 2001 VOLUME 1, URS
S434. DRAFT FALL 2000 SPRING 2001 GROUNDWATER MONITORING REPORT SEPTEMBER 2001 VOLUME 2, URS
S435. DRAFT FINAL FALL 2000 SPRING 2001 GROUNDWATER MONITORING REPORT VOLUME 1, URS
S436. DRAFT FINAL FALL 2000 SPRING 2001 GROUNDWATER MONITORING REPORT VOLUME 2, URS
S437. FALL 2000 AND SPRING 2001 GROUNDWATER MONITORING RESULTS SUMMARY AUGUST 2001, URS
S438. DRAFT FINAL FACILITY WIDE WORK PLAN, URS
S439. DRAFT 2002 GROUNDWATER MONITORING REPORT VOLUME 1 MARCH 2001, HYDROGEOLOGIC
S440. DRAFT 2002 GROUNDWATER MONITORING REPORT VOLUME 2 MARCH 2001, HYDROGEOLOGIC
S441. DRAFT FINAL 2002 GROUNDWATER MONITORING REPORT AUGUST 2003 VOLUME 1, HYDROGEOLOGIC
S442. DRAFT FINAL 2002 GROUNDWATER MONITORING REPORT AUGUST 2003 VOLUME 2, HYDROGEOLOGIC
S443. DRAFT 2003 GROUNDWATER MONITORING REPORT VOLUME 1 AUGUST 2004, HYDROGEOLOGIC
S444. DRAFT 2003 GROUNDWATER MONITORING REPORT VOLUME 2 AUGUST 2004, HYDROGEOLOGIC
S445. DRAFT FINAL 2003 GROUNDWATER MONITORING REPORT VOLUME 1 DECEMBER 2004, HYDROGEOLOGIC
S446. DRAFT FINAL 2003 GROUNDWATER MONITORING REPORT VOLUME 2 DECEMBER 2004, HYDROGEOLOGIC
S500. SITE ASSESSMENT PROJECT PLAN FOR AET, DATED 1999
S501. SITE ASSESSMENT PROJECT PLAN FOR AET REV.2, DATED 2000
S502. FIELD SAMPLING REPORT AET BLDG. 600-84, DATED FEBRUARY 2001
S503. ACTION MEMORANDUM FOR INERT LANDFILL AUGUST 25, 1995, CDM FEDERAL PROGRAMS
S504. FINAL IMPLEMENTATION PROPOSAL FOR ENVIRONMENTAL PROTECTION, DATED FEBRUARY 1996, PREPARED BY ECC
S505. FINAL WORK PLAN FOR MULTIPLE REMOVAL ACTION FEBRUARY 14, 1996, ECC
S506. SAMPLING & ANALYSIS PLAN FOR TREATED DISCHARGES OF THE WATER CONTAINED IN THE LINE 800 PINK WATER LAGOON AUGUST 1996, ECC
S507. WETLAND BORROW AREA ASSESSMENT REPORT AUGUST 1996, ECC
S508. MULTIPLE REMOVAL ACTIONS TRANSMITTAL OF FINAL RADIO ACTIVE ISOTOPE ANALYTICAL REPORT, DATED MAY 1997, ECC
S509. MULTIPLE REMOVAL ACTIONS FINAL WATER TREATMENT PLAN FOR PERCHED WATER AT THE IDA, DATED FEBRUARY 1998, ECC
S510. FINAL REMEDIAL ACTION REPORT FOR MULTIPLE REMOVAL ACTIONS, DATED APRIL 2001, ECC
S511. DRAFT WORK PLAN FOR THE FIRING TRAINING PIT APRIL 1998, ECC
S512. DRAFT SOILS FOCUSED FEASIBILITY STUDY VOLUME 1 OF 1 MARCH 6, 1996, JAYCOR
S513. WORKING DRAFT SOILS FOCUSED FEASIBILITY STUDY JANUARY 10, 1997
S514. SOILS FOCUSED FEASIBILITY STUDY USARMY DECISION DOCUMENT FOR FOCUSED SOILS REMOVAL MAY 1, 1997
S515. DRAFT SOILS FEASIBILITY REPORT MARCH 16, 1998
S516. FINAL SOILS FEASIBILITY REPORT JUNE 1998
S517. SITE SAFETY SUBMISSION FOR EDA (EAST BURN PADS) APRIL 1997, CORPS OF ENGINEERS
S518. DRAFT PHASE 1 REVISED WORK PLAN AND CONTRACTOR QUALITY CONTROL PLAN JANUARY 14, 1998, ECC
S519. DRAFT REMEDIAL ACTION REPORT PHASE 1 MAY 1999, ECC
S520. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 OCTOBER 2000 BOOK 1 OF 19, ECC
S521. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX A OCTOBER 2000 BOOK 2 OF 19, ECC
S522. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX A OCTOBER 2000 BOOK 3 OF 19, ECC
S523. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 4 OF 19, ECC
S524. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 5 OF 19, ECC
S525. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 6 OF 19, ECC
S526. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 7 OF 19, ECC
S527. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 8 OF 19, ECC
S528. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 9 OF 19, ECC
S529. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 10 OF 19, ECC
S530. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 11 OF 19, ECC
S531. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 12 OF 19, ECC
S532. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 13 OF 19, ECC
S533. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 14 OF 19, ECC
S534. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 15 OF 19, ECC
S535. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 16 OF 19, ECC
S536. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS OCTOBER 2000 BOOK 17 OF 19, ECC
S537. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS OCTOBER 2000 BOOK 18 OF 19, ECC
S538. FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS OCTOBER 2000 BOOK 19 OF 19, ECC
S539. DRAFT WORK PLAN ADDENDUM, CONTIGENCY PLAN, CQCP ADDENDUM, SAP ADDENDUM AND SSHP ADDENDUM PHASE 2 MARCH 1999, ECC
S540. DRAFT REMEDIAL ACTION REPORT PHASE 2 SEPTEMBER 2000, ECC
S541. DRAFT FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APRIL 2001 BOOK 1 OF 21, ECC
S542. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 1 NORTH SUMP CHARACTERIZATION SAMPLES APRIL 2001 BOOK 2 OF 21, ECC
S543. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 1 NORTH SUMP CHARACTERIZATION SAMPLES APRIL 2001 BOOK 3 OF 21, ECC
S544. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 1 SOUTH SUMP CHARACTERIZATION SAMPLES APRIL 2001 BOOK 4 OF 21, ECC
S545. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – ROUNDHOUSE RDX SITE CHARACTERIZATION APRIL 2001 BOOK 5 OF 21, ECC
S546. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 6 OF 21, ECC
S547. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 7 OF 21, ECC
S548. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 8 OF 21, ECC
S549. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 9 OF 21, ECC
S550. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 10 OF 21, ECC
S551. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 11 OF 21, ECC
S552. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 12 OF 21, ECC
S553. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 13 OF 21, ECC
S554. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 14 OF 21, ECC
S555. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 15 OF 21, ECC
S556. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 16 OF 21, ECC
S557. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 17 OF 21, ECC
S558. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 18 OF 21, ECC
S559. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 19 OF 21, ECC
S560. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX E – EXCAVATION AND SURVEY MAPS APRIL 2001 BOOK 20 OF 21, ECC
S561. FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX G – SAFETY & HEALTH REPORTS & DATA APRIL 2001 BOOK 21 OF 21, ECC
S562. DRAFT FINAL EXCAVATION REPORT FOCUSED FEASIBILITY SOIL STUDY SITES, PHASE 3 REMEDIAL ACTION WEST BURN PADS AREA NOVEMBER 2001, ECC
S563. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 1, ECC
S564. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 2, ECC
S565. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 3, ECC
S566. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 4, ECC
S567. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 5, ECC
S568. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 6, ECC
S569. DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 7, ECC
S601. DRAFT SUPPLEMENTAL RI FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA AND LINE 3A POND MARCH 2003, MKM ENGINEERS
S602. DRAFT FINAL VERSION 5 SOIL DATA COLLECTION FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR JULY 2004, MKM ENGINEERS
S604. DRAFT REPORT FOR SOIL DATA COLLECTION FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR DECEMBER 2004, MKM ENGINEERS
S605. DRAFT FINAL REPORT FOR THE SOIL DATA COLLECTION AT THE INCENDIARY DISPOSAL AREA, FLY ASH WASTE PILE, POSSIBLE DEMOLITION SITE, LINE 3A POND, EXPLOSIVE WASTE INCINERATOR AND CONSTRUCTION DEBRIS LANDFILL MAY 2005, MKM ENGINEERS
S606. DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 FEBRUARY 2005, MKM ENGINEERS
S607. DRAFT FINAL REMEDIAL ACTION WORK PLAN FOR SOILS TREATMENT AT THE INERT DISPOSAL AREA APRIL 2005, PREPARED BY TETRA TECH
S650. REPORT FOR THE INVESTIGATION OF THE TAR-LIKE SUBSTANCE PILES AT IOWA AAP SEPTEMBER 2003, MKM ENGINEERS
S653. DRAFT WORK PLAN FOR THE UXO SURVEY OF LOAD LINE 6 AND CENTRAL TEST AREA VOLUME 1 MAY 2004, MKM ENGINEERS
S654. DRAFT MEC DENSITY SURVEY REPORT FOR LINE 6 AND THE CENTRAL TEST AREA FEBRUARY 2005, MKM ENGINEERS
S655. DRAFT FINAL MEC DENSITY SURVEY REPORT FOR LINE 6 AND THE CENTRAL TEST AREA MAY 2005, MKM ENGINEERS
S700. DRAFT FINAL FIVE YEAR REVIEW VOLUME 1, DATED DECEMBER 2004, PREPARED BY CORPS OF ENGINNERS
S701. DRAFT FINAL FIVE YEAR REVIEW VOLUME 2, DATED DECEMBER 2004, PREPARED BY CORPS OF ENGINNERS
S725. INSTALLATION ACTION PLAN FY00 MARCH 2000
S726. INSTALLATION ACTION PLAN FY01 MARCH 2001
S727. INSTALLATION ACTION PLAN FY02 MARCH 2002
S728. INSTALLATION ACTION PLAN FY03 MARCH 2003
S729. INSTALLATION ACTION PLAN FY04 MARCH 2004
S730. INSTALLATION ACTION PLAN FY05 AUGUST (WORKING COPY)
S750. DRAFT FINAL REPORT FOR ENVIRONMENTAL REMEDIATION SERVICES AT THE IOWA ARMY AMMUNITION PLANT LINE 6 AND BILLET SPLITTER BUILDING CLOSURE VOLUME 1 MARCH 29, 1994, OHM
S751. DRAFT FINAL REPORT FOR ENVIRONMENTAL REMEDIATION SERVICES AT THE IOWA ARMY AMMUNITION PLANT LINE 6 AND BILLET SPLITTER BUILDING CLOSURE VOLUME 2 MARCH 29, 1994, OHM
S752. RCRA CLOSURE EXPLOSIVE WASTE INCINERATOR JUNE 1998, ECC
S753. HEALTH AND SAFETY PLAN FOR A BIOLOGICAL SOIL SLURRY LAGOON PILOT SCALE DEMONSTRATION SEPTEMBER 1996, ENVIRONMENTAL RESEARCH DIVISION
S754. TEST PLAN FOR A BIOLOGICAL SOIL SLURRY LAGOON PILOT SCALE DEMONSTRATION SEPTEMBER 1999, ENVIRONMENTAL RESEARCH DIVISION
S755. FINAL REPORT: CLOSURE, DEMOBILIZATION AND SAMPLING ACTIVITIES AT THE BIOLOGICAL SOIL SLURRY LAGOON DECEMBER 1999, ENVIRONMENTAL RESEARCH DIVISION
S775. FY99 ER,A
S776. FY00 ER,A
S777. FY01 ER,A
S778. FY02 ER,A
S779.