ENVIRONMENTAL DOCUMENT LISTING

        JUNE 29, 2010

 

 

1.                  BACKGROUND INFORMATION @ IAAAP

 

2.                  DRAFT INSTALLATION ASSESSMENT SEPTEMBER 1978

FINAL INSTALLATION ASSESSMENT JANUARY 1980

 

2.1       SUBSURFACE INVESTIGATION AT SITE Z-1 (ABANDONED PINKWATER LAGOON) AT IOWA ARMY AMMUNITION PLANT, FEBRUARY 25, 1982, PREPARED BY SCS ENGINEERS

 

3.                 EVALUATION OF PINKWATER LAGOON, LINE 6 AND LINE 4A BY SCS ENGINEERS SEPTEMBER 22, 1981

 

4.                  CONTAMINATION REPORTS SEPTEMBER 17, 1982, PREPARED BY ERG

GEOTECHNICAL REPORT SEPTEMBER 17, 1982, PREPARED BY ERG

            CONTAMINATION REPORT JUNE 15, 1982, PREPARED BY ERG

 

5.                  FOLLOW-ON STUDY OF ENVIRONMENTAL CONTAMINATION AUGUST 29, 1984

 

6.                  PLANT UPTAKE STUDIES, PERFORMED BY ORNL, 1990-1996

 

7.                  (IAG) COMMUNITY RELATIONS PLAN, FEBRUARY 2001

 

7.1      DRAFT FINAL POTENTIAL AREAS OF CONCERN SUPPLEMENT MAY 1991, PREPARED BY THE CORPS OF ENGINEERS

 

7.2       DRAFT COMMUNITY RELATIONS PLAN UPDATE, MARCH 2009, PREPARED BY TETRA TECH

 

8.                  PRELIMINARY ASSESSMENT (PAS) FOR THE 43 IAAAP SITES 1991, PREPARED BY JAYCOR

 

9.                  FINAL WORK PLAN PHASE 1 REMEDIAL INVESTIGATION/FEASIBILITY STUDY JUNE 1992 VOLUME 1 OF 3, PREPARED BY JAYCOR

 

10.              FINAL WORK PLAN PHASE 1 REMEDIAL INVESTIGATION/FEASIBILITY STUDY JUNE 1992 VOLUME 2 OF 3, PREPARED BY JAYCOR

 

11.              FINAL WORK PLAN PHASE 1 REMEDIAL INVESTIGATION/FEASIBILITY STUDY JUNE 1992 VOLUME 3 OF 3, PREPARED BY JAYCOR

 

12.              ACUTE & CHRONIC TOXICITY TESTS – IAAAP 1993, PREPARED BY ESE

 

13.              BASEWIDE ANALYSIS & DRILLING PROCEDURES JAYCOR 1993

 

14.              INSTALLATION ENVIRONMENTAL ASSESSMENT OCTOBER 12, 1995

 

15.              PRELIMINARY SITE CHARACTERIZATION REPORTS MARCH 1993, PREPARED BY JAYCOR

 

16.              SITE CHARACTERIZATION REPORT R01, PREPARED BY JAYCOR

 

17.              SITE CHARACTERIZATION REPORT R02 & R03, PREPARED BY JAYCOR

 

18.              SITE CHARACTERIZATION REPORT R04 - R11, PREPARED BY JAYCOR

 

19.              SITE CHARACTERIZATION REPORT R12 - R21, PREPARED BY JAYCOR

 

20.              SITE CHARACTERIZATION REPORT R22 - R30, PREPARED BY JAYCOR

 

21.              ANNUAL HISTORICAL REVIEW OCTOBER 1, 1991SEPTEMBER 30, 1992, PREPARED BY MASON & HANGER

 

22.              FEASIBILITY STUDY INITIAL SCREENING DOCUMENT JAN 1994

            DRAFT FEASIBILITY STUDY MAY 1994, PREPARED BY JAYCOR

 

23.              DRAFT FINAL FIELD SAMPLING PLAN ADDENDUM FOLLOW-ON RI SAMPLING MARCH 1995, PREPARED BY JAYCOR

 

24.              RISK ASSESSMENT PROTOCOL DOCUMENT FOR THE RI/FS OCTOBER 1992, PREPARED BY JAYCOR

 

25.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 1 OF 11, PREPARED BY JAYCOR

 

26.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 2 OF 11, PREPARED BY JAYCOR

 

27.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 3 OF 11, PREPARED BY JAYCOR

 

28.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 4 OF 11, PREPARED BY JAYCOR

 

29.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 5 OF 11, PREPARED BY JAYCOR

 

30.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 6 OF 11, PREPARED BY JAYCOR

 

31.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 7 OF 11, PREPARED BY JAYCOR

 

32.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 8 OF 11, PREPARED BY JAYCOR

 

33.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 9 OF 11, PREPARED BY JAYCOR

 

34.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 10 OF 11, PREPARED BY JAYCOR

 

35.              REVISED DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 11 OF 11, PREPARED BY JAYCOR

 

36.              DRAFT BENCH SCALE COMPOSTING INVESTIGATION FOR THE IOWA ARMY AMMUNITION PLANT SOILS NOVEMBER 1997

 

37.              FINAL EVALUATION OF NATURAL ATTENUATION AT INDUSTRIAL OPERATIONS COMMAND SITES OCTOBER 1999, PREPARED BY PLATINUM INTERNATIONAL

 

38.       GUIDELINES FOR THE COORDINATION OF CERCLA ACTIVITIES BETWEEN ATSDR AND DOD, FEBRUARY 1995

 

39.       Draft IOWA AAP PUBLIC HEALTH ASSESSMENT AUGUST 21, 1999, PREPARED BY FEDERAL FACILITIES ASSESSMENT BRANCH

 

40.       IOWA AAP PUBLIC HEALTH ASSESSMENT DECEMBER 28, 1999, PREPARED BY FEDERAL FACILITIES ASSESSMENT BRANCH

 

42.       DRAFT ATSDR HEALTH CONSULTATION ENVIRONMENTAL PATHWAY EVALUATION FOR BERYILLIUM AND DU 8/15/03, PREPARED BY FEDERAL FACILITIES ASSESSMENT BRANCH

 

43.       FINAL ATSDR HEALTH CONSULTATION ENVIRONMENTAL PATHWAY EVALUATION FOR BERYILLIUM AND DU DECEMBER 9, 2003, PREPARED BY FEDERAL FACILITIES ASSESSMENT BRANCH

 

44.       DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 1 – TEXT (LINE 1 & FIRING SITE) & FIGURES, PREPARED BY TN & ASSOCIATES

 

45.       DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 2 – APPENDICIES A-J, PREPARED BY TN & ASSOCIATES

 

46.       DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 3 APPENDIX K, PREPARED BY TN & ASSOCIATES

 

47.       DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 4 APPENDIX K, PREPARED BY TN & ASSOCIATES

 

48.       DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 5 APPENDIX K, PREPARED BY TN & ASSOCIATES

 

49.       DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 6 APPENDIX K, PREPARED BY TN & ASSOCIATES

 

50.       DRAFT FINAL WORK PLANS FOR SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 1 & FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) SEPTEMBER 20 2001 VOLUME 7 APPENDIX L THRU 0, PREPARED BY TN & ASSOCIATES

 

51.       DRAFT LINE 1 & FIRING SITE SUPPLEMENTAL RI REPORT MAY 2002 VOLUME 1, PREPARED BY TN & ASSOCIATES

 

52.       DRAFT LINE 1 & FIRING SITE SUPPLEMENTAL RI REPORT MAY 2002 VOLUME 2, PREPARED BY TN & ASSOCIATES

 

53.       DRAFT FINAL LINE 1 & FIRING SITE SUPPLEMENTAL RI REPORT AUGUST 2002 VOLUME 1, PREPARED BY TN & ASSOCIATES

 

54.       DRAFT FINAL LINE 1 & FIRING SITE SUPPLEMENTAL RI REPORT AUGUST 2002 VOLUME 2, PREPARED BY TN & ASSOCIATES

 

55.       DRAFT AERIAL RADIATION SURVEY WORK PLAN, PREPARED BY ENVIRONMENTAL ASSESMENT DIVISION, SEPTEMBER 2002

 

56.       DRAFT FINAL AERIAL RADIATION SURVEY WORK PLAN, PREPARED BY ENVIRONMENTAL ASSESMENT DIVISION

 

57.       FINAL AERIAL RADIATION SURVEY WORK PLAN (2 COPIES), PREPARED BY ENVIRONMENTAL ASSESMENT DIVISION

 

59.       DRAFT AERIAL RADIOLOGICAL SURVEY APRIL 2003, PREPARED BY ARGONNE NATIONAL LAB AND REMOTE SENSING LAB

 

60.       DRAFT FINAL AERIAL RADIATION SURVEY JULY 10, 2003, PREPARED BY ARGONNE NATIONAL LAB AND REMOTE SENSING LAB

 

61.       DRAFT PROJECT MANAGEMENT PLAN JULY 2004, PREPARED BY TETRA TECH

 

62.       FINAL PROJECT MANAGEMENT PLAN DECEMBER 2004, PREPARED BY TETRA TECH

 

62.1     FINAL PROJECT MANAGEMENT PLAN AUGUST 2008, PREPARED BY TETRA TECH

 

63.       WORK PLAN FOR UNEXPLODED ORDNANCE (UXO) SUPPORT WORK SITE INVESTIGATION BLDG 600-84, JANUARY 2008, PA WEBER LC

 

64.       FINAL REPORT FOR UNEXPLODED ORDNANCE (UXO) SCAN WORK BLDG 600-84, JANUARY 28, 2008, PA WEBER LC

 

66.       DRAFT SITE CONSTRUCTION AND MANAGEMENT PLAN FOR THE 40MM TEST RANGE, MAY 2010, PREPARED BY AMERICAN ORDNANCE

 

75.       INSTALLATION ACTION PLAN FY05AUGUST 2004

 

76.       INSTALLATION ACTION PLAN FY06 JUNE 2005

 

77.       INSTALLATION ACTION PLAN APR/FY06, SEPTEMBER 27, 2006

 

78.       INSTALLATION ACTION PLAN (PUBLIC VERSION) APR/FY06, SEPTEMBER 27, 2006

 

80.              CLOSED TRANSFERRING AND TRANSFERRED RANGE/SITE INVENTORY, PREPARED BY ENGINEERING ENVIRONMENTAL MANAGEMENT

 

82.       INSTALLATION ACTION PLAN (PUBLIC VERSION) FY2008, NOVEMBER 10, 2008

 

83.       INSTALLATION ACTION PLAN FY2009 COMPLIANCE-RELATED CLEANUP, 22 JULY 2009

 

 

99.         WATER QUALITY ENGINEERING CONSULTATION NO. 31-24-0673-85 INVESTIGATION OF GROUNDWATER CONTAMINATION, 1985 SAMPLING EVENT, PREPARED BY UNITED STATES ARMY ENVIRONMENTAL HYGIENE AGENCY

 

100.     UNDERGROUND POLLUTION INVESTIGATION @ THE IAAAP FEBRUARY 22, 1982, PREPARED BY SCS ENGINEERS

 

101.     GROUNDWATER QUALITY ASSESSMENT PLAN INERT LANDFILL & LINE 6 AREA JUNE 1995, PREPARED BY AEHA

 

102.     DRAFT REPORT MIDWEST SITE CONFIRMATION SURVEY SAMPLING REPORT FEBRUARY 28, 1986, PREPARED BY DAMES & MOORE

 

103.     DRAFT FINAL MIDWEST SITE CONFIRMATION SURVEY SAMPLING AUGUST 29, 1986, PREPARED BY DAMES & MOORE

 

104.     FINAL REPORT GROUNDWATER QUALITY ASSESSMENT INERT LANDFILL AND LINE 6 AREAS DECEMBER 1989, PREPARED BY TERRA CON

 

105.     COMPREHENSIVE MONITORING EVALUATION (FINAL REPORT) JANUARY 21, 1992, PREPARED BY PRC ENVIRONMENTAL MANAGEMENT

 

106.     FINAL WORK PLAN AND GROUNDWATER QUALITY ASSESSMENT PLAN FOR TRENCH 5 AND LINE 6 OCTOBER 1993, PREPARED BY THE EARTH TECHNOLOGY CORPORATION

 

107.     DRAFT FINAL ACCELERATED GROUNDWATER QUALITY ASSESSMENT FOR THE ASH DISPOSAL CELL IN TRENCH 5 AND LINE 6 OCTOBER 1994   VOLUME 1, PREPARED BY THE EARTH TECHNOLOGY CORPORATION     

 

108.     DRAFT FINAL ACCELERATED GROUNDWATER QUALITY ASSESSMENT FOR THE ASH DISPOSAL CELL IN TRENCH 5 AND LINE 6 OCTOBER 1994 VOLUME 2, PREPARED BY THE EARTH TECHNOLOGY CORPORATION

 

109.     SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT DECEMBER 1, 1997 VOLUME 1, PREPARED BY HARZA

 

110.     SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT DECEMBER 1, 1997 VOLUME 2, PREPARED BY HARZA

 

111.     SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION (1997) REVISED DRAFT FINAL VOLUME 1 AUGUST 2001, PREPARED BY HARZA

 

112.     SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION (1997) REVISED DRAFT FINAL VOLUME 2 AUGUST 2001, PREPARED BY HARZA

 

113.     QUALITY CONTROL SUMMARY REPORT – SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATIONS JANUARY 1998, PREPARED BY HARZA

 

114.     DRAFT GROUNDWATER FEASIBILITY STUDY REPORT DECEMBER 22, 1997, PREPARED BY HARZA

 

115.     DRAFT WORK PLAN & DRAFT SAMPLING AND ANALYSIS PLAN – SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 800/PINKWATER LAGOON JULY 1998, PREPARED BY HARZA

 

116.     DRAFT/FINAL WORK PLAN & DRAFT/FINAL SAMPLING AND ANALYSIS PLAN – SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 800/PINK WATER LAGOON AUGUST 1998, PREPARED BY HARZA

 

117.     QUALITY CONTROL SUMMARY REPORT (DRAFT) – SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 800/PINK WATER LAGOON FEBRUARY 1999, PREPARED BY HARZA

 

118.     ANALYTICAL DATA REPORT – SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT LINE 800/PINK WATER LAGOON MARCH 1999, PREPARED BY HARZA

 

119.     WORK PLAN ADDENDUM – SUPPLEMENTAL REMEDIAL INVESTIGATION LINE 800/PINK WATER LAGOON (DRAFT) SEPTEMBER 1999, PREPARED BY HARZA

 

120.     RECOMMENDATIONS FOR ADDITIONAL REMEDIAL INVESTIGATION LINE 800/PINK WATER LAGOON, MAY 1999, PREPARED BY HARZA

 

121.     DRAFT SUPPLEMENTAL REMEDIAL INVESTIGATION REPORT LINE 800/PINK WATER LAGOON FEBRUARY 2001, PREPARED BY HARZA

 

122.     DRAFT FINAL SUPPLEMENTAL REMEDIAL INVESTIGATION REPORT LINE 800/PINK WATER LAGOON JULY 2001, PREPARED BY HARZA

 

123.     DRAFT INTERIM GROUNDWATER FEASIBILITY STUDY REPORT AUGUST 4, 1998, PREPARED BY HARZA

 

124.     DRAFT TECHNICAL MEMORANDUM FATE AND TRANSPORT OF CONTAMINANTS DRAFT 1999, PREPARED BY HARZA

DRAFT TECHNICAL MEMORANDUM EVALUATION OF CONTAMINANT SOURCES TO SURFACE STREAMS FEBRUARY 2001

DRAFT FINAL TECHNICAL MEMORANDUM EVALUATION OF CONTAMINANT SOURCES TO SURFACE STREAMS AUGUST 2001

 

125.     OFF BASE RESIDENTIAL DRINKING WATER WELLS VOLUME 1, APRIL 1993

 

126.     OFF BASE RESIDENTIAL DRINKING WATER WELLS VOLUME 2, APRIL 1993

 

126.1   1993 ACTION MEMO FOR OFFPOST RATHBUN HOOKUP

 

126.2   2001 ACTION MEMO ADDENDUM FOR PERMANENT POTABLE WATER SUPPLY  

 

127.     WORK PLAN & SAMPLING & ANALYSIS PLAN – GROUNDWATER INVESTIGATION OFFSITE GROUNDWATER INVESTIGATION (OU3) JUNE 1999, PREPARED BY HARZA

128.     TRANSMITTAL OF DRAFT SUMMARY TABLES LABORATORY ANALYTICAL RESULTS OFFSITE GROUNDWATER INVESTIGATION PHASE 1 AUGUST 11, 1999, PREPARED BY HARZA

 

129.     OFFSITE GROUNDWATER INVESTIGATION PHASE II, III, IV WORK PLAN ADDENDUM, PREPARED BY HARZA

 

130.     TECHNICAL MEMORANDUM – SUPPLEMENTAL INVESTIGATION OFF SITE GROUNDWATER, SURFACE WATER & SEDIMENT JANUARY 25, 2000, PREPARED BY HARZA

 

131.     PRELIMINARY DRAFT TECHNICAL MEMORANDUM – SUPPLEMENTAL INVESTIGATION OFFSITE GROUNDWATER PHASE III JULY 2000, PREPARED BY HARZA

 

132.     QUALITY CONTROL SUMMARY REPORT OFFSITE GROUNDWATER INVESTIGATION (OU3) PHASE I, II, III SEPTEMBER 2000, PREPARED BY HARZA

 

133.     QUALITY CONTROL SUMMARY REPORT OFF-SITE GROUNDWATER INVESTIGATION (OU3) PHASE IV MAY 2001, PREPARED BY HARZA

 

134.     DRAFT TECHNICAL MEMORANDUM, SUPPLEMENTAL INVESTIGATION, OFF-SITE GROUNDWATER PHASE IV JULY 2001, PREPARED BY HARZA

 

135.     FINAL TECHNICAL MEMORANDUM SUPPLEMENTAL INVESTIGATION OFF-SITE GROUNDWATER PHASE IV MAY 2002, PREPARED BY HARZA

 

136.     DRAFT OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION WORK PLAN ADDENDUM AUGUST 2001, PREPARED BY URS

 

137.     PUBLIC MEETING TRANSCRIPT, OFFPOST RATHBUN CONNECTION, AUGUST 18, 1993

 

138.     DRAFT FINAL DIRECT PUSH FIELD INVESTIGATION TECHNICAL MEMORANDUM & REVISED WORK PLAN OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION APRIL 2002, PREPARED BY URS

 

142.     DRAFT FINAL OFFSITE REMEDIAL INVESTIGATION REPORT APRIL 2003 VOLUME 1, PREPARED BY URS

 

143.     DRAFT FINAL OFFSITE REMEDIAL INVESTIGATION REPORT APRIL 2003 VOLUME 2, PREPARED BY URS

 

147.     DRAFT TECHNICAL MEMORANDUM GROUNDWATER FLOW AND CONTAMINANT FATE AND TRANSPORT MODELING OFF-SITE GROUNDWATER OCTOBER 2003, PREPARED BY URS

 

148.     DRAFT FINAL OFF-SITE GROUNDWATER FEASIBILITY STUDY MARCH 2004, PREPARED BY URS

 

149.     DRAFT FINAL TECHNICAL MEMORANDUM GROUNDWATER FLOW AND CONTAMINANT FATE AND TRANSPORT MODELING OFF-SITE GROUNDWATER MARCH 2004, PREPARED BY URS

  

151.     REVISED DRAFT FINAL OFF-SITE GROUNDWATER PROPOSED PLAN JULY 2004 (2 COPIES)

 

155.     DRAFT FINAL OFF-SITE GROUNDWATER ROD JANUARY 2005, PREPARED BY URS

 

156.     DRAFT FINAL OFF-SITE GROUNDWATER RECORD OF DECISION MAY 2005, PREPARED BY URS

 

159.     DRAFT FINAL OFF-SITE GROUNDWATER TREATABILITY STUDY WORK PLAN NOVEMBER 2004, PREPARED BY TETRA TECH

 

161.     DRAFT TREATABILITY STUDY RESULTS FOR IN SITU ENHANCED DEGRADATION OF OFF-SITE GROUNDWATER OCTOBER 2005, PREPARED BY TETRA TECH

 

162.     FINAL TREATABILITY STUDY RESULTS FOR IN SITU ENHANCED DEGARDATION OF OFF-SITE GROUNDWATER DATED AUGUST 2006, PREPARED BY TETRA TECH

 

 

164.     DRAFT REMEDIATION DESIGN FOR AN ENHANCED DEGRADATION SYSTEM FOR RDX IN OFF-SITE GROUNDWATER, MARCH 2006, PREPARED BY TETRA TECH

 

165.     DRAFT FINAL REMEDIAL DESIGN FOR AN ENHANCED DEGRADATION SYSTEM FOR RDX IN OFF-SITE GROUNDWATER, AUGUST 2006, PREPARED BY TETRA TECH

 

167.     DRAFT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, APRIL 2007, PREPARED BY TETRA TECH

 

168.     FINAL REDLINE/STRIKEOUT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, AUGUST 2007, PREPARED BY TETRA TECH

 

169.     DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, DECEMBER 2007, PREPARED BY TETRA TECH

 

170.     DRAFT FINAL REVISION 2 REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, MAY 2008, PREPARED BY TETRA TECH

 

171.     FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR OFF-SITE GROUNDWATER, APRIL 2009, PREPARED BY TETRA TECH

 

173.     DRAFT OFFSITE GROUNDWATER REMEDIATION PROGRESS REPORT ONE (OCTOBER 2007-FEBRUARY 2008), JUNE 2009, PREPARED BY TETRA TECH

 

174.     DRAFT FINAL OFFSITE GROUNDWATER REMEDIATION PROGRESS REPORT ONE (OCTOBER 2007-FEBRUARY 2008), NOVEMBER 2009, PREPARED BY TETRA TECH

 

176.     DRAFT OFFSITE GROUNDWATER REMEDIATION PROGRESS REPORT TWO (FEBRUARY 2008-OCTOBER 2008), JUNE 2009, PREPARED BY TETRA TECH

 

183.     TECHNICAL MEMORANDUM OFFSITE BRUSH CREEK SUPPLEMENTAL SURFACE WATER AND GROUNDWATER SAMPLING, FEBRUARY 2009, PREPARED BY TETRA TECH

 

184.     TECHNICAL MEMORANDUM OFFSITE BRUSH CREEK SUPPLEMENTAL SURFACE WATER AND GROUNDWATER RESULTS COLLECTED MARCH/APRIL 2009, DATED JUNE 2009, PREPARED BY TETRA TECH

 

 

191.     DRAFT FINAL FTP, WBPA, EBP FEASIBILTY STUDY DATA COLLECTION WORK PLAN ADDENDUM AUGUST 2002, PREPARED BY URS

 

195.     DRAFT FIRE TRAINING PIT GROUNDWATER REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 MAY 2004, PREPARED BY URS

 

196.     DRAFT FIRE TRAINING PIT GROUNDWATER REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 MAY 2004, PREPARED BY URS

 

197.     DRAFT EAST BURN PADS GROUNDWATER REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JUNE 2004, PREPARED BY URS

 

198.     DRAFT EAST BURN PADS GROUNDWATER REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JUNE 2004, PREPARED BY URS

 

199.     DRAFT WEST BURN PADS GROUNDWATER INVESTIGATION VOLUME 1 JUNE 2004, PREPARED BY URS

 

200.     DRAFT WEST BURN PADS GROUNDWATER INVESTIGATION VOLUME 2 JUNE 2004, PREPARED BY URS

 

201.     SIX SITES FEASIBILITY STUDY DATA COLLECTION MONITORING WELL AND STAFF GUAGE INSTALLATION DOCUMENTATION AND PHOTO LOG MAY 2004, PREPARED BY URS

 

203.     DRAFT SPRING CREEK, LONG CREEK AND SKUNK RIVER WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN OCTOBER 2004, PREPARED BY TETRA TECH

 

204.     DRAFT FINAL SPRING CREEK, LONG CREEK AND SKUNK RIVER WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN JANUARY 2005, PREPARED BY TETRA TECH

 

206.     DRAFT BRUSH CREEK WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN OCTOBER 2004, PREPARED BY TETRA TECH

 

207.     REVISED DRAFT FINAL BRUSH CREEK WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN JANUARY 2005, PREPARED BY TETRA TECH

 

208.     DRAFT FINAL BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN OCTOBER 2005, PREPARED BY TETRA TECH

 

209.     DRAFT FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN VOLUME I OF II, OCTOBER 2005, PREPARED BY TETRA TECH

 

210.     DRAFT FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN VOLUME II OF II, OCTOBER 2005, PREPARED BY TETRA TECH

 

211.     DRAFT FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN, OCTOBER 2006, PREPARED BY TETRA TECH (Note: this is an incomplete document.  It is still in redline strikeout format and the figures are not included).

 

212.     FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN, DECEMBER 2006, VOLUME I OF II, PREPARED BY TETRA TECH

 

213.     FINAL COMPREHENSIVE (BRUSH CREEK, SPRING CREEK, LONG CREEK, AND SKUNK RIVER) WATERSHEDS EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN, DECEMBER 2006, VOLUME II OF II, PREPARED BY TETRA TECH

 

216.     DRAFT REMEDIAL INVISTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2007, VOLUME 1 OF 4, PREPARED BY TETRA TECH

 

217.     DRAFT REMEDIAL INVISTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2007, VOLUME 2 OF 4, PREPARED BY TETRA TECH

 

218.     DRAFT REMEDIAL INVISTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2007, VOLUME 3 OF 4, PREPARED BY TETRA TECH

 

219.     DRAFT REMEDIAL INVISTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2007, VOLUME 4 OF 4, PREPARED BY TETRA TECH

 

220.     REVISED DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2008, VOLUME 1 OF 4, PREPARED BY TETRA TECH

 

221.     REVISED DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2008, VOLUME 2 OF 4, PREPARED BY TETRA TECH

 

222.     REVISED DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2008, VOLUME 3 OF 4, PREPARED BY TETRA TECH

 

223.     REVISED DRAFT REMEDIAL INVESTIGATION/FEASIBILITY STUDY FOR OU-3 SITEWIDE GROUNDWATER, APRIL 2008, VOLUME 4 OF 4, PREPARED BY TETRA TECH

 

233.     DRAFT FINAL TECHNICAL MEMORANDUM GROUNDWATER FLOW AND TRANSPORT MODELING LINE 800 LAGOON FEBRUARY 2003, PREPARED BY URS

 

236.     DRAFT FINAL LINE 800 PINKWATER LAGOON FEASIBILITY STUDY FEBRUARY 2003, PREPARED BY URS

 

238.     DRAFT PROPOSED PLAN FOR THE LINE 800 PINKWATER LAGOON GROUNDWATER EXPLOSIVES PLUME APRIL 2003, PREPARED BY URS

 

240.     DRAFT FINAL LINES 2, 3 & 9 FEASIBILITY STUDY DATA COLLECTION WORK PLAN AUGUST 2002, PREPARED BY URS

 

241.     DRAFT FINAL LINE 3 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JANUARY 2004, PREPARED BY URS

 

242.     DRAFT FINAL LINE 3 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JANUARY 2004, PREPARED BY URS

 

243.     DRAFT FINAL LINE 9 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JANUARY 2004, PREPARED BY URS

 

244.     DRAFT FINAL LINE 9 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JANUARY 2004, PREPARED BY URS

 

245.     DRAFT FINAL LINE 2 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 FEBRUARY 2004, PREPARED BY URS

 

246.     DRAFT FINAL LINE 2 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 FEBRUARY 2004, PREPARED BY URS

 

247.     IAAP SAMPLING AND RECONNAISSANCE OF BRUSH CREEK 1/20/2004, PREPARED BY C.C. JOHNSON & MALHOTRA, P.C.

 

250.     DRAFT FINAL BRUSH CREEK POINT SOURCE CONTROL WORK PLAN NOVEMBER 2004, PREPARED BY TETRA TECH

 

251.     FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM DESIGN MARCH 2005, PREPARED BY TETRA TECH

 

252.     FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM DESIGN MAY 2005, PREPARED BY TETRA TECH

 

253.     DRAFT OPERATION AND MAINTENANCE MANUAL FOR BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM, DATED OCTOBER 2005, PREPARED BY TETRA TECH

 

254.     FINAL OPERATION AND MAINTENANCE MANUAL FOR BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM, DATED JUNE 2006,

            PREPARED BY TETRA TECH

 

254.1   FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM REPORT, APRIL 2008, PREPARED BY TETRA TECH

 

254.2   FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM REPORT, JUNE 2009, PREPARED BY TETRA TECH

 

255.     DRAFT-FINAL TREATABILITY STUDY TEST PLAN FOR IN SITU BIODEGRADATION OF ON-POST GROUNDWATER APRIL 2005, PREPARED BY TETRA TECH

 

256.     DRAFT TECHNICAL MEMORANDUM FULL SCALE TREATABILITY STUDY FOR IN SITU BIODEGRADATION OF ON POST GROUNDWATER, DATED SEPTEMBER 2007, PREPARED BY TETRA TECH

 

257.     FINAL TECHNICAL MEMORANDUM FULL SCALE TREATABILITY STUDY FOR INSITU BIODEGRADATION OF ON POST GROUNDWATER, DATED FEBRUARY 2009, PREPARED BY TETRA TECH

 

310.     MONITORING WELL INVENTORY VOLUME 1 1-93 THRU 800-MW-26

 

311.     MONITORING WELL INVENTORY VOLUME 2 C95-1 THRU G-16

 

312.     MONITORING WELL INVENTORY VOLUME 3 G-17 THRU JAW-45

 

313.     MONITORING WELL INVENTORY VOLUME 4 JAW-46 THRU L3-MW2

 

314.     MONITORING WELL INVENTORY VOLUME 5   L9-MW1 THRU MW-517

 

315.     MONITORING WELL INVENTORY VOLUME 6 NBPLF-MW1 THRU WBP-MW3

 

315.1   MONITORING WELL INVENTORY VOLUME 7

 

315.2   MONITORING WELL INVENTORY VOLUME 8

 

315.3   MONITORING WELL INVENTORY VOLUME 9

 

316.     MONITORING WELL MANAGEMENT PLAN (DRAFT REPORT) JANUARY 1999, PREPARED BY HARZA

 

317.     DRAFT FINAL – LETTER WORK PLAN FOR MONITORING WELL ABANDONMENT AND MAINTENANCE APRIL 12, 2000, PREPARED BY TN & ASSOCIATES

 

318.     MONITORING WELL MAINTENANCE AND ABANDONMENT REPORT 10/17/00, PREPARED BY TN & ASSOCIATES

 

319.     FINAL SPRING 2001 GROUNDWATER MONITORING WORK PLAN ADDENDUM MAY 2001, PREPARED BY URS

 

320.     DRAFT FINAL FACILITY WIDE WORK PLAN FEBRUARY 2002, PREPARED BY URS

 

321.     DRAFT SPRING 2002 GROUNDWATER MONITORING WORK PLAN ADDENDUM MAY 2002, PREPARED BY HYDROGEOLOGIC

 

324.     DRAFT FINAL 2003 GROUNDWATER MONITORING REPORT VOLUME 1 DECEMBER 2004, PREPARED BY HYDROGEOLOGIC

 

325.     DRAFT FINAL 2003 GROUNDWATER MONITORING REPORT VOLUME 2 DECEMBER 2004, PREPARED BY HYDROGEOLOGIC

 

328.     DRAFT FINAL 2004 GROUNDWATER MONITORING REPORT, VOLUME 1 OF 2, FEBRUARY 2005, PREPARED BY HYDROGEOLOGIC

 

329.     DRAFT FINAL 2004 GROUNDWATER MONITORING REPORT, VOLUME 2 OF 2, FEBRUARY 2005, PREPARED BY HYDROGEOLOGIC

 

330.     DRAFT GROUNDWATER MONITORING PROGRAM JANUARY 2005, PREPARED BY TETRA TECH

 

331.     DRAFT FALL 2005 GROUNDWATER AND SURFACE WATER SAMPLING PROGRAM WORK PLAN SEPTEMBER 2005, PREPARED BY TETRA TECH

 

333.     DRAFT FINAL 2004-2005 GROUNDWATER SAMPLING REPORT, DECEMBER 2005, PREPARED BY TETRA TECH

 

336.     DRAFT 2006 GROUNDWATER SAMPLING REPORT, JULY 2007, PREPARED BY TETRA TECH

 

337.     FINAL 2006 GROUNDWATER SAMPLING REPORT, FEBRUARY 2009, PREPARED BY TETRA TECH

 

338.     CONCENTRATION TRENDS FOR SELECTED WELLS AND PARAMETERS, AUGUST 2007, PREPARED BY TETRA TECH

 

340.     DRAFT 2007 GROUNDWATER SAMPLING REPORT, DECEMBER 2007, PREPARED BY TETRA TECH

 

341.     FINAL 2007 GROUNDWATER SAMPLING REPORT, FEBRUARY 2009, PREPARED BY TETRA TECH

 

400.     REPLACE/UPGRADE EXPLOSIVES COLLECTION SUMPS STUDY DECEMBER 14, 1990, PREPARED BY MASON & HANGER

 

401.     FINAL REPORT – CONTAMINATION ASSESSMENT OF CONCRETE SUMPS JUNE 9, 1993, PREPARED BY JAYCOR

 

402.     FINAL EE/CA FOR SUMPS OCTOBER 11, 1994, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

403.     FINAL ENGINEERING EVALUATION/COST ANALYSIS FOR PESTICIDE PIT REMOVAL AUGUST 16, 1994 & OCTOBER 11, 1994, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

404.     PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS REMOVAL ACTIONS SEPTEMBER 1, 1994, PREPARED BY OHM

 

405.     DRAFT ACTION MEMO PESTICIDE PIT AND SUMPS MARCH 7, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

406.     ACTION MEMORANDUM FOR THE PESTICIDE PIT MARCH 20, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

407.     FINAL ACTION MEMORANDUM FOR THE EXPLOSIVE – CONTAMINATED SUMP REMOVAL NOVEMBER 3, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

408.     SAMPLING AND ANALYSIS PLAN FOR RAPID RESPONSE INTERIM REMOVAL ACTIONS AT THE PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS, APRIL 1995, PREPARED BY OHM

 

409.     FINAL WORK PLAN – RAPID RESPONSE INTERIM REMOVAL ACTION @ THE PESTICIDE PIT & EXPLOSIVE CONTAMINATED SUMPS APRIL 11, 1995, PREPARED BY OHM

 

410.     DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 1, PREPARED BY OHM

 

411.     DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 2, PREPARED BY OHM

 

412.     DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 3, PREPARED BY OHM

 

413.     DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 4, PREPARED BY OHM

 

414.     DRAFT FINAL REPORT REMOVAL ACTIONS (PESTICIDE PIT AND EXPLOSIVE CONTAMINATED SUMPS) JANUARY 8, 1996 BOOK 5, PREPARED BY OHM

 

415.     FINAL REPORT ADDENDUM FOR FINAL TRANSPORTATION AND DISPOSAL AND OTHER ACTIVITIES, NOVEMBER 6, 1996, PREPARED BY OHM

 

416.     DRAFT FINAL REPORT ENDANGERMENT ASSESSMENT FORMER LINE 1 IMPOUNDMENT AND LINE 800 PINK WATER LAGOON JULY 1989, PREPARED BY DAMES & MOORE

 

417.     DRAFT FINAL FEASIBILITY STUDY FORMER LINE 1 IMPOUNDMENT AND PINKWATER LAGOON AUGUST 1989, PREPARED BY DAMES & MOORE

 

418.     DRAFT FINAL REPORT (REVISED) FEASIBILITY STUDY FORMER LINE 1 IMPOUNDMENT AND PINK WATER LAGOON JUNE 1, 1994, PREPARED BY JAYCOR AND CDM FEDERAL PROGRAMS CORPORATION

 

419.     DRAFT FINAL REPORT (REVISED) BASELINE HUMAN HEALTH ECOLOGICAL RISK ASSESSMENT FORMER LINE 1 IMPOUNDMENT AND PINK WATER LAGOON JUNE 1, 1994, PREPARED BY JAYCOR AND ICAIR

420.     DRAFT EE/CA FOR THE PINKWATER LAGOON AND THE LINE 1 IMPOUNDMENT, DECEMBER 1994, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

421.     DRAFT FIELD INVESTIGATION REPORT FORMER LINE 1 IMPOUNDMENT AND LINE 800 PINK WATER LAGOON APRIL 1995, PREPARED BY THE CORPS OF ENGINNERS

 

422.     DRAFT EVALUATION OF TREATMENT ALTERNATIVES LINE 1 IMPOUNDMENT AND LINE 800 PINKWATER LAGOON, JUNE 15, 1995, PREPARED BY PLEXUS CORP.

 

423.     DRAFT ACTION MEMORANDUM FOR THE LINE 800 PINK WATER LAGOON LINE 1 IMPOUNDMENT AND EXPLOSIVES-CONTAMINATED SOIL STOCK PILE SEPTEMBER 7 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

424.     ACTION MEMORANDUM FOR THE LINE 800 PINK WATER LAGOON AND FORMER LINE 1 IMPOUNDMENT OCTOBER 1996, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

425.     LINE 1 & 800 PHYTOREMEDIATION MONITORING FEBRUARY 5, 1999, PHYTOREMEDIATION RESULTS FALL 1997

            PHYTOREMEDIATION RESULTS 1997, PREPARED BY ECC

 

426.     ACTION MEMORANDUM FOR THE INERT LANDFILL OCTOBER 4, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

427.     ACTION MEMORANDUM FOR THE INERT LANDFILL SEPTEMBER 1997, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

428.     DRAFT EE/CA FOR MULTIPLE REMOVAL ACTIONS MARCH 6, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

429.     DRAFT EE/CA MULTIPLE REMOVAL ACTIONS VOLUME 1 APRIL 3, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

430.     DRAFT EE/CA MULTIPLE REMOVAL ACTIONS VOLUME 2 APRIL 3, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

431.     DRAFT FINAL ENGINEERING EVALUATION/COST ANALYSIS FOR THREE REMOVAL ACTIONS VOLUME 2 APPENDICES  MAY 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

432.     ACTION MEMO MULTIPLE REMOVAL ACTIONS AUGUST 17, 1995, PREPARED BY CDM FEDERAL PROGRAMS CORPORATION

 

433.     DESIGNATION OF CAMU MARCH 8, 1996

 

434.     FINAL WORK PLAN FOR MULTIPLE REMOVAL ACTIONS AUGUST 31, 1996, PREPARED BY ECC

 

435.     MULTIPLE REMOVAL ACTIONS – CONSTRUCTION PROGRESS PHOTOGRAPHS SEPTEMBER 1997, PREPARED BY THE CORPS OF ENGINNERS

 

436.     DRAFT FINAL REPORT – MULTIPLE REMOVAL ACTIONS JANUARY 11, 1999, PREPARED BY ECC

 

437.     FINAL REPORT – MULTIPLE REMOVAL ACTIONS APRIL 2001, PREPARED BY ECC

 

438.     DRAFT ENGINEERING EVALUATION/COST ANALYSIS – FIRE TRAINING PIT JANUARY 1996, PREPARED BY HARZA

 

439.     FINAL ENGINEERING EVALUATION/COST ANALYSIS – FIRE TRAINING PIT MAY 1996, PREPARED BY HARZA

 

440.     DRAFT ACTION MEMORANDUM & EXPLANATION OF SIGNIFICANT DIFFERENCE – FIRE TRAINING PIT NOV 1997, PREPARED BY ECC

 

441.     FINAL FIRE TRAINING PIT - EXPLANATION OF SIGNIFICANT DIFFERENCE & ACTION MEMORANDUM, DECEMBER 1997, PREPARED BY ECC

 

442.     FINAL WORK PLAN , FINAL SAMPLING AND ANALYSIS PLAN ADDENDUM, FINAL SITE SAFETY &  HEALTH PLAN ADDENDUM – FIRE TRAINING PIT JULY 1998, PREPARED BY ECC

 

443.     DRAFT REMEDIAL ACTION REPORT – FIRE TRAINING PIT JUNE 1999, PREPARED BY ECC

 

444.     FINAL REMEDIAL ACTION – FIRE TRAINING PIT OCTOBER 2000, PREPARED BY ECC

 

445.     DRAFT SUPPLEMENTAL RA WORK PLAN FOR THE FIRE TRAINING PIT REMOVAL ACTION JULY & AUGUST 2003, PREPARED BY ECC

 

446.     FINAL SUPPLEMENTAL WORK PLAN FOR THE FIRE TRAINING PIT REMOVAL ACTION JULY & AUGUST 2003, PREPARED BY ECC

 

448.     DRAFT REMEDIAL ACTION REPORT ADDENDUM FOR THE FIRE TRAINING PIT SEPTEMBER 2003, PREPARED BY ECC

 

448B.  DRAFT ADDENDUM REMEDIAL ACTION REPORT FOR THE FIRE TRAINING PIT REMOVAL ACTION APPENDIX B VOLUME 2 JULY 28 2005, PREPARED BY ECC

 

448C.  DRAFT ADDENDUM REMEDIAL ACTION REPORT FOR THE FIRE TRAINING PIT REMOVAL ACTION APPENDIX B VOLUME 3 JULY 28 2005, PREPARED BY ECC

 

448D.  DRAFT ADDENDUM REMEDIAL ACTION REPORT FOR THE FIRE TRAINING PIT REMOVAL ACTION APPENDIX B VOLUME 4 JULY 28 2005, PREPARED BY ECC

 

450.     DRAFT FINAL ADDENDUM REMEDIAL ACTION REPORT FOR THE FIRE TRAINING PIT AUGUST 2005, PREPARED BY ECC

 

451.     DRAFT FINAL SOILS FOCUSED FEASIBILITY STUDY VOLUME 1 OF 1 PREPARED BY JAYCOR 24 JUNE 1996

 

452.     DRAFT FINAL SOILS FOCUSED FEASIBILITY VOLUME 1 OF 1 PREPARED BY ENGINEERED EFFICIENCY NOVEMBER 1996

 

453.     EPA REGION VII REWRITE OF FOCUSED FEASIBILITY STUDY JANUARY 1997

 

454.     SOILS FOCUSED FEASIBILITY STUDY VOLUME 1 OF 1 PREPARED BY ENGINEERED EFFICIENCY MAY 8, 1997

 

455.     DRAFT SOILS FEASIBILITY STUDY MARCH 27, 1997, PREPARED BY ENGINEERED EFFICIENCY

 

456.     DRAFT FINAL FEASIBILITY STUDY FOR OPERABLE UNIT 1: CONTAMINATED SOILS NOVEMBER 10, 1997 PREPARED BY ENGINEERED EFFICIENCY

 

457.     DRAFT ENVIRONMENTAL PROTECTION PLAN OCTOBER 14, 1997, PREPARED BY ECC

 

458.     DRAFT/FINAL SOILS FEASIBILITY STUDY REPORT MAY 18, 1998, PREPARED BY HARZA

 

459.     FINAL SOILS FEASIBILITY STUDY REPORT/OPERABLE UNIT NO. 1 JUNE 19, 1998, PREPARED BY HARZA

 

460.     FOCUSED SOILS PROPOSED PLAN MAY 1997

 

461.     SUPERFUND PROPOSED PLAN SOILS OPERABLE UNIT #1, DRAFT MARCH 1997, DRAFT FINAL MAY 1998, FINAL JUNE 1998

 

462.     PUBLIC MEETING TRANSCRIPT JULY 9, 1998

 

463.     U.S. ARMY INTERIM SOILS ACTION FOR OPERABLE UNIT #1 RECORD OF DECISION MARCH 4, 1998

 

464.     DRAFT RECORD OF DECISION SOILS OPERABLE UNIT #1 JULY 1998, PREPARED BY HARZA

 

465.     FINAL RECORD OF DECISION SOILS OPERABLE UNIT #1 AUGUST 1998

 

466.     DRAFT FINAL ESD FOR THE FINAL ROD FOR THE SOILS OPERABLE UNIT (OU-1) JANUARY 2003 SIGNED APRIL 2003 (2 COPIES)

 

466.2   DRAFT ESD FOR DELETION OF RADIOLOGICALLY CONTAMINATED SOILS FROM RECORD OF DECISION (ROD) SOILS OU1, DECEMBER 2005

 

466.3   FINAL ESD FOR DELETION OF RADIOLOGICAL CONTAMINANTS FROM INTERIM RECORD OF DECISION (IROD) SOILS OPERABLE UNIT 1, JUNE 2006, PREPARED BY TETRA TECH

 

466.5   EXPLANATION OF SIGNIFICANT DIFFERENCES FOR THE INTERIM ACTION RECORD OF DECISION (IROD) SOILS OU1 – ADDITION OF ENVIRONMENTAL PROTECTIVENESS TO THE REMEDY AND TRANSFER OF SITES FROM OU4 TO OU1, JANUARY 2008, PREPARED BY TETRA TECH

 

466.6   FINAL EXPLANATION OF SIGNIFICANT DIFFERENCES FOR THE INTERIM ACTION RECORD OF DECISION (IROD) SOILS OU1 – ADDITION OF ENVIRONMENTAL PROTECTIVENESS TO THE REMEDY AND TRANSFER OF SITES FROM OU4 TO OU1, JUNE 2008, PREPARED BY TETRA TECH

 

467.     SUMMARY REPORT – PRE-DESIGN EXCAVATION DELINEATION DECEMBER 1998 LINE 5A/5B ROUNDHOUSE RDX SITE IDA STORAGE/BURNING GROUNDS, PREPARED BY THE CORPS OF ENGINEERS, DECEMBER 1998

 

 

466.8   DRAFT ESD FOR THE FINAL RECORD OF DECISION SOILS OU1 CHANGE OF PRIMARY TREATMENT TECHNOLOGY FROM BIOLOGICAL TO ALKALINE HYDROLYSIS CHEMICAL TREATMENT, JUNE 2009

 

468.     A.O. CONSTRUCTION PROJECTS SAMPLING AND ANALYSIS WORKPLAN JAN 2002, PREPARED BY URS

 

469.     DRAFT REPORT OF ACTION LAUNDRY EFFLUENT PRETREATMENT SAMPLING & ANALYSIS SEPTEMBER 1997, PREPARED BY MASON & HANGER

 

470.     FINAL REVISED WORK PLAN & REVISED CQCP-PHASE 1 MAY 12, 1998, PREPARED BY ECC

 

471.     FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 OCTOBER 2000 BOOK 1 OF 19, PREPARED BY ECC

 

472.     DRAFT FINAL WORK PLAN ADDENDUM, CONTINGENCY PLAN, CQCP ADDENDUM. SAP ADDENDUM, SSHP ADDENDUM PHASE 2 JUNE 1999, PREPARED BY ECC

 

473.     INFORMATION SUMMARY FOR FOCUSED FEASIBILITY STUDY SITES, PREPARED BY CORPS OF ENGINEERS, SEPTEMBER 1996

 

474.     FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APRIL 2001 BOOK 1 OF 21, PREPARED BY ECC

 

478.     DRAFT FINAL WORK PLAN AMENDMENT FOCUSED FEASIBILITY STUDIES SOILS REMEDIATION BARIUM CONTAMINATED SOILS STABILIZATION VOLUME 1 OF 2 OCTOBER 2000, PREPARED BY CAPE ENVIRONMENTAL

 

479.     WORK PLAN AMENDMENT FOCUSED FEASIBILITY STUDIES SOILS REMEDIATION BARIUM CONTAMINATED SOILS STABILIZATION VOLUME 2 OF 2 OCTOBER 2000, PREPARED BY CAPE ENVIRONMENTAL

 

481.     BIOREMEDIATION/METALS TREATMENT WBPLF SOILS IN INERTLANDFILL TRENCH 6 & 7 JULY 24, 2001 WORK PLAN AMENDMENT, PREPARED BY CAPE ENVIRONMENTAL

 

482.     BIOREMEDIATION/METALS TREATMENT WBPLF SOILS IN INERTLANDFILL TRENCH 6 & 7 SUPPLEMENTAL WORK PLAN AUGUST 7, 2001, PREPARED BY CAPE ENVIRONMENTAL

 

483.     DRAFT FINAL WORK PLAN ADDENDUM METALS TREATMENT WEST BURN PADS LANDFILL SOILS IN INERT LANDFILL TRENCH 6 & 7 AUGUST 2002, PREPARED BY CAPE ENVIRONMENTAL

 

484.     DRAFT FINAL EXCAVATION REPORT PHASE 3 NOVEMBER 2001, PREPARED BY ECC

 

487.     DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY SOIL STUDY SITES, PHASE III REMEDIAL ACTION-WBPA DEC 2002, PREPARED BY CAPE ENVIRONMENTAL

 

491.     DRAFT FINAL FACILITY WIDE WORK PLAN REMEDIAL DESIGN/REMEDIAL ACTION ACTIVITES OPERABLE UNIT 1 REVISION 2, JULY 2003, PREPARED BY SHAW

 

492.     DRAFT LABORATORY QUALIFICATIONS PACKAGE 10/15/03, PREPARED BY SHAW

 

504.     DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL REMEDIAL DESIGN (INCLUDING HAS) FOR PHASE 4 SOIL SITE MARCH 2003 VOLUME 1, PREPARED BY TN & ASSOCIATES

 

505.     DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL REMEDIAL DESIGN (INCLUDING HAS) FOR PHASE 4 SOIL SITE MARCH 2003 VOLUME 2, PREPARED BY TN & ASSOCIATES

 

507.     DRAFT PROPOSED REVISIONS TO WORK PLAN FOR SUPPLEMENTAL REMEDIAL DESIGN PHASE 4 SOIL SITES, OPERABLE UNIT 1 DECEMBER 22, 2003, PREPARED BY SHAW

 

508.     DRAFT REMEDIAL ACTION ADDENDUM FOR SOILS EXCAVATION PHASE 4 SOILS SITES JANURARY 20, 2004, PREPARED BY SHAW

 

509.     DRAFT FINAL REMEDIAL ACTION WORK PLAN FOR SOIL EXCAVATION PHASE 4 SOIL SITES MAY 20, 2004, PREPARED BY SHAW

 

511.     DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005, PREPARED BY SHAW

 

511A.  DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005, PREPARED BY SHAW

 

511B.  DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 1 OF 15, PREPARED BY SHAW

 

511C.   DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 2 OF 15, PREPARED BY SHAW

 

511D.  DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 3 OF 15, PREPARED BY SHAW

 

511E.  DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 4 OF 15, PREPARED BY SHAW

 

511F.  DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 5 OF 15, PREPARED BY SHAW

 

511G. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 6 OF 15, PREPARED BY SHAW

 

511H. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 7 OF 15, PREPARED BY SHAW

 

511I.   DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 8 OF 15, PREPARED BY SHAW

 

511J.   DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 9 OF 15, PREPARED BY SHAW

 

511K. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 10 OF 15, PREPARED BY SHAW

 

511L.   DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 11 OF 15, PREPARED BY SHAW

 

511M. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 12 OF 15, PREPARED BY SHAW

 

511N. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 13 OF 15, PREPARED BY SHAW

 

511O. DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 14 OF 15, PREPARED BY SHAW

 

511P.   DRAFT REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 3, 2005 APPENDIX H VOLUME 15 OF 15, PREPARED BY SHAW

 

512.     FINAL REMEDIAL ACTION REPORT PHASE 4 SOIL SITES OU1 AUGUST 2005, PREPARED BY SHAW ENVIRONMENTAL, INC.

 

513.     DRAFT HISTORICAL SITE ASSESMENT FOR LINE 6, LINE 800, CENTRAL TEST AREA, AND DEACT FURNACE SEPTEMBER 2003, PREPARED BY TN & ASSOCIATES

 

514.     DRAFT FINAL HISTORICAL RECORDS REVIEW FOR LINE 6, LINE 800, CENTRAL TEST AREA, AND DEACTIVATION FURNACE OCTOBER 2004, PREPARED BY TN & ASSOCIATES

 

516.     DRAFT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OU#1 OCTOBER 2004, PREPARED BY TETRA TECH

 

517.     DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OPERABLE UNIT 1 FEBRUARY 2005, PREPARED BY TETRA TECH

 

518.     REVISED DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OPERABLE UNIT 1 JUNE 2005, PREPARED BY TETRA TECH

 

521.     DRAFT FINAL OPERATIONS AND MAINTENANCE OPTIMIZATION PLAN AT THE INERT DISPOSAL AREA, LINE 1 POND, AND LINE 800 LAGOON SEPTEMBER 2005, PREPARED BY TETRA TECH

 

521.1   FINAL OPERATIONS AND MAINTENANCE OPTIMIZATION PLAN AT THE INERT DISPOSAL AREA, LINE 1 POND, AND LINE 800 LAGOON FEBRUARY 2009, PREPARED BY TETRA TECH

 

522.     OVERALL OPERABLE UNIT 1 DATA – ALL EXCAVATIONS DONE AT THE IAAAP BY SITE, DEPTH OF SAMPLING POINTS, SOURCES OF CONTAMINATION, TRENCH CHARTS, FIGURES AND TABLES,  MAY 2005, PREPARED BY TETRA TECH

 

523.     IDA TOPOGRAPHICAL SURVEY JULY 27, 2005 MARTIN 7 WHITACRE SURVEYORS & ENGINEERS, INC

 

524.     DRAFT FINAL TECHNICAL MEMORANDUM CESIUM SOURCE EVALUATION SEPTEMBER 2005, PREPARED BY TETRA TECH

 

524.1   FINAL TECHNICAL MEMORANDUM CESIUM SOURCE EVALUATION, FEBRUARY 2009, PREPARED BY TETRA TECH

 

 

526.     DRAFT FINAL OPERATION AND MAINTENANCE PLAN FOR IDA, LINE 1 IMPOUNDMENT, AND LINE 800 LAGOON, DATED APRIL 2006, PREPARED BY TETRA TECH

 

527.     FINAL OPERATION AND MAINTENANCE PLAN FOR IDA, LINE 1 IMPOUNDMENT, AND LINE 800 LAGOON, DATED FEBRUARY 2009, PREPARED BY TETRA TECH

 

531.     DRAFT HISTORICAL SITE ASSESSMENT FOR LINE 2, 3, 3A, INCENDIARY DISPOSAL AREA, OLD FLYASH WASTE PILE, POSSIBLE DEMOLITION SITE, EXPLOSIVE WASTE INCINERATOR, CONSTRUCTION DEBRIS LANDFILL AND LINE 3A POND AUGUST 25, 2004, PREPARED BY SHAW

 

532.     DRAFT FINAL HISTORICAL RECORDS REVIEW FOR LINE 2, 3, 3A, INCENDIARY DISPOSAL AREA, OLD FLYASH WASTE PILE, POSSIBLE DEMOLITION SITE, EXPLOSIVE WASTE INCINERATOR, CONSTRUCTION DEBRIS LANDFILL AND LINE 3A POND JANUARY 5, 2005, PREPARED BY SHAW

 

538.     DRAFT WORK PLAN FOR SOIL SAMPLING LINE 7 DECONTAMINATION AND DECOMMISSIONING ACTIVITIES, JANUARY 2006, PREPARED BY TETRA TECH

 

539.     DRAFT FINAL SITE SAFETY AND HEALTH PLAN REMEDIAL DESIGN/REMEDIAL ACTION ACTIVITIES DECEMBER 2005, PREPARED BY TETRA TECH

 

541.     DRAFT MEMORANDUM FOR POST-RECORD OF DECISION CHANGE FOR THE INCLUSION OF OPERABLE UNIT 4 SOILS TO OPERABLE UNIT 1 FEBRUARY 2006, PREPARED BY TETRA TECH

 

542.     PROPOSED EXCAVATIONS FOR LINES 3 AND 3A, SEPTEMER 2005, PREPARED BY TETRA TECH

 

543.     OU1 SOIL EXCAVATION PLANS, VOLUME 1 OF 2, SUMMER 2006, PREPARED BY TETRA TECH

 

544.     OU1 SOIL EXCAVATION PLANS, VOLUME 2 OF 2, SUMMER 2006, PREPARED BY TETRA TECH

 

545.     DRAFT TECHNICAL MEMORANDUM FOR NO FURTHER REMEDIAL ACTION OF COPPER IMPACTED DITCH SOILS DOWNSTREAM OF LOAD LINE 3, OPERABLE UNIT 1, SEPTEMBER 2006 AND MAY 2007 SUBMITTALS, PREPARED BY TETRA TECH

           

 

547.     DRAFT EXCAVATION PLAN FOR REMEDIAL ACTION FOR PHASES 5, 7, AND 7 OF OPERABLE UNIT 1, MARCH 2007, PREPARED BY TETRA TECH

 

548.     DRAFT FINAL EXCAVATION PLAN FOR REMEDIAL ACTION FOR PHASES 5, 7, AND 7 OF OPERABLE UNIT 1, JULY 2007, PREPARED BY TETRA TECH

 

550.     DRAFT REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION SIDE ECOLOGICAL EVALUATION, JULY 2007, PREPARED BY TETRA TECH

 

551.     DRAFT FINAL REDLINE STRIKEOUT REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, MAY 2008, PREPARED BY TETRA TECH

 

552.          DRAFT FINAL REV. 1 REDLINE STRIKEOUT REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, AUGUST 2008, PREPARED BY TETRA TECH

 

553.     DRAFT FINAL REV. 2 REDLINE STRIKEOUT REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, FEBRUARY 2009, PREPARED BY TETRA TECH

 

554.     FINAL REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, VOLUME 1 OF 2, AUGUST 2009, PREPARED BY TETRA TECH

 

555.     FINAL REMEDIAL ACTION REPORT FOR OU1 SOILS PHASE 5, 7, AND 8 SITES AND INSTALLATION WIDE ECOLOGICAL EVALUATION, VOLUME 2 OF 2, AUGUST 2009, PREPARED BY TETRA TECH

 

572.     DRAFT FINAL SUPPLEMENTAL RI FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA AND LINE 3A POND JULY 2003, PREPARED BY MKM ENGINEERS

 

573.     DRAFT FINAL VERSION 2 SUPPLEMENTAL RI FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA AND LINE 3A POND OCTOBER 2003, PREPARED BY MKM ENGINEERS

 

574.     DRAFT FINAL VERSION 3 SUPPLEMENTAL RI FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR JANUARY 2004, PREPARED BY MKM ENGINEERS

 

575.     DRAFT FINAL VERSION 4 SOIL DATA COLLECTION FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR MAY 2004, PREPARED BY MKM ENGINEERS

 

576.     DRAFT FINAL VERSION 5 SOIL DATA COLLECTION FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR JULY 2004, PREPARED BY MKM ENGINEERS

 

579.     DRAFT FINAL REPORT FOR THE SOIL DATA COLLECTION AT THE INCENDIARY DISPOSAL AREA, FLY ASH WASTE PILE, POSSIBLE DEMOLITION SITE, LINE 3A POND, EXPLOSIVE WASTE INCINERATOR AND CONSTRUCTION DEBRIS LANDFILL MAY 2005, PREPARED BY MKM ENGINEERS 

 

581.     DRAFT SUPPLEMENTAL REMEDIAL INVESTIGATION WORK PLAN FOR OU4 OCTOBER 2004, PREPARED BY TETRA TECH

 

582.     DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 FEBRUARY 2005, PREPARED BY TETRA TECH

 

583.     DRAFT FINAL (REVISION 1) WORK PLAN FOR SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 AUGUST 2005, PREPARED BY TETRA TECH

 

584.     DRAFT FINAL (REVISION 2) WORK PLAN FOR SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 MAY 2006, PREPARED BY TETRA TECH

 

586.     DRAFT SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, DATED APRIL 2006, PREPARED BY TETRA TECH

 

587.     DRAFT SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 – APPENDICES APRIL 2006, PREPARED BY TETRA TECH

 

588.     DRAFT FINAL SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 1 OF 2, DATED AUGUST 2006, PREPARED BY TETRA TECH

 

589.     DRAFT FINAL SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 2 OF 2, DATED AUGUST 2006, PREPARED BY TETRA TECH

 

589.1   REVISED DRAFT FINAL SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 1 OF 2, DATED APRIL 2007, PREPARED BY TETRA TECH

 

589.2   REVISED DRAFT FINAL SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 2 OF 2, DATED APRIL 2007, PREPARED BY TETRA TECH

 

589.3   DRAFT FINAL REV. 1 SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 1 OF 2, DATED JULY 2008, PREPARED BY TETRA TECH

 

589.4   DRAFT FINAL REV. 1 SUPPLEMENAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, VOLUME 2 OF 2, DATED JULY 2008, PREPARED BY TETRA TECH

 

589.5   DRAFT FINAL REV. 2 SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4, DATED SEPTEMBER 2009, PREPARED BY TETRA TECH 

 

591.     DRAFT FEASIBILITY STUDY FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA (IDA) OU4, JULY 2006, PREPARED BY TETRA TECH

 

592.     DRAFT FINAL REDLINE/STRIKEOUT FOCUSED FEASIBILITY STUDY FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA (IDA) OU4, OCTOBER 2006, PREPARED BY TETRA TECH

 

593.     FINAL FOCUSED FEASIBILITY STUDY FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA (IDA) OU4, JANUARY 2007, PREPARED BY TETRA TECH

 

594.     DRAFT (SECURITY REVIEW) PROPOSED PLAN FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA, JANUARY 2007, PREPARED BY TETRA TECH

 

595.     DRAFT PROPOSED PLAN FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA, JANUARY 2007, PREPARED BY TETRA TECH

 

596.     FINAL PROPOSED PLAN FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA, MAY 2007, PREPARED BY TETRA TECH

 

 

598.     DRAFT INTERIM ACTION RECORD OF DECISION FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA IN SOILS OU4, SEPTEMBER 2007, PREPARED BY TETRA TECH

 

599.     DRAFT FINAL INTERIM ACTION RECORD OF DECISION FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA IN SOILS OU4, REDLINE STRIKEOUT VERSION, DECEMBER 2007, PREPARED BY TETRA TECH

 

599.1   DRAFT FINAL REV. 1 INTERIM ACTION RECORD OF DECISION FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA IN SOILS OU4, REDLINE STRIKEOUT VERSION, FEBRUARY 2008, PREPARED BY TETRA TECH

 

599.1.1 DRAFT FINAL REV. 1 INTERIM ACTION RECORD OF DECISION FOR TRENCH 6, TRENCH 7, AND THE CAP EXTENSION AREA OF THE INERT DISPOSAL AREA IN SOILS OU4, SEPTEMBER 2008, PREPARED BY TETRA TECH

 

599.3   DRAFT REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION AREA (CEA), SEPTEMBER 2008, PREPARED BY TETRA TECH

 

599.4   DRAFT FINAL REDLINE STRIKEOUT REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION AREA (CEA), DECEMBER 2008, PREPARED BY TETRA TECH

 

599.5   FINAL REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION AREA (CEA), APRIL 2009, PREPARED BY TETRA

 

599.6   DRAFT CONSTRUCTION QA/QC PLAN (ATTACHMENT 1 TO THE REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION ARE (CEA), JANUARY 2009, PREPARED BY TETRA TECH

 

599.7   DRAFT FINAL REDLINE STRIKEOUT CONSTRUCTION QA/QC PLAN [ATTACHMENT 1 TO THE REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION ARE (CEA)], APRIL 2009, PREPARED BY TETRA TECH

 

599.8   FINAL CONSTRUCTION QA/QC PLAN [ATTACHMENT 1 TO THE REMEDIAL ACTION WORK PLAN FOR CLOSURE OF THE CAP EXTENSION ARE (CEA)], MAY 2009, PREPARED BY TETRA TECH

 

601.     DRAFT REMEDIAL ACTION WORK PLAN FOR SOILS TREATMENT AT INERT DISPOSAL AREA DECEMBER 2004, PREPARED BY TETRA TECH

 

 

602.     DRAFT FINAL REMEDIAL ACTION WORK PLAN FOR SOILS TREATMENT AT THE INERT DISPOSAL AREA APRIL 2005, PREPARED BY TETRA TECH

 

602.1   DRAFT FINAL (REVISION 1) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, APRIL 2007, PREPARED BY TETRA TECH

 

602.2   DRAFT FINAL (REVISION 2) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, AUGUST 2007, PREPARED BY TETRA TECH

 

602.3   DRAFT FINAL (REVISION 3) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, FEBRUARY 2008, PREPARED BY TETRA TECH

 

602.4   DRAFT FINAL (REVISION 4) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, JUNE 2008, PREPARED BY TETRA TECH

 

602.5   DRAFT FINAL (REVISION5) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, JUNE 2008, PREPARED BY TETRA TECH

 

602.6   DRAFT FINAL (REVISION 6) REMEDIAL ACTION WORK PLAN FOR SOIL TREATMENT AT THE INERT DISPOSAL AREA, REDLINE STRIKEOUT VERSION, AUGUST 2008, PREPARED BY TETRA TECH

 

602.6.2   DRAFT REMEDIAL ACTION REPORT FOR BIOLOGICAL SOIL TREATMENT AT THE INERT DISPOSAL AREA, OCTOBER 2009

 

602.6.3   FINAL REMEDIAL ACTION REPORT FOR BIOLOGICAL SOIL  TREATMENT AT THE INERT DISPOSAL AREA, JANUARY 2010

 603.     DRAFT SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7 JULY 2005, PREPARED BY TETRA TECH

 

604.     DRAFT (REVISION 1) SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7 AUGUST 2005, PREPARED BY TETRA TECH

 

605.     DRAFT FINAL SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7, DECEMBER 2005, PREPARED BY TETRA TECH

 

606.     DRAFT FINAL REVISION 1 SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7 (CAMU), FEBRUARY 2006, PREPARED BY TETRA TECH

 

607.     DRAFT FINAL REVISION 2 SOIL TREATABILITY TEST PLAN FOR BIOREMEDIATION OF EXPLOSIVES IN TRENCH 7 (CAMU), MARCH 2006, PREPARED BY TETRA TECH

607.1   STATUS REPORT FOR SOIL CHEMICAL TREATMENT INERT DISPOSAL AREA, FEBRUARY 2009, PREPARED BY TETRA TECH

 

607.2.1STATUS REPORT FOR SOIL CHEMICAL TREATMENT INERT DISPOSAL AREA, MARCH 2009, PREPARED BY TETRA TECH

 

607.4   TECHNICAL MEMORANDUM FOR SOIL TREATMENT RESULTS FOR ALKALINE HYDROLYSIS IN TRENCH 6 INERT DISPOSAL AREA, JULY 2009, PREPARED BY TETRA TECH

 

607.5   FINAL TECHNICAL MEMORANDUM FOR SOIL TREATMENT RESULTS FOR ALKALINE HYDROLYSIS IN TRENCH 6 INERT DISPOSAL AREA, NOVEMBER 2009, PREPARED BY TETRA TECH

 

609.     DRAFT FINAL BRUSH CREEK SURFACE WATER AND SEDIMENT INVESTIGATION WORK PLAN OPERABLE UNIT 4 JANUARY 2006, PREPARED BY TETRA TECH

 

610.     DRAFT FINAL BRUSH CREEK SURFACE WATER AND SEDIMENT INVESTIGATION WORK PLAN OPERABLE UNIT 4, FEBRUARY 2006, PREPARED BY TETRA TECH

 

610.1   PROGRESS REPORT: EVALUATION OF PHASE 1 SEDIMENT AND SURFACE WATER DATA AND RECOMMENDATIONS FOR PHASE 2 SAMPLING IN BRUSH CREEK, BRUSH CREEK SURFACE WATER AND SEDIMENT INVESTIGATION OPERABLE UNIT 4, MAY 2007, PREPARED BE TETRA TECH

 

610.2   DRAFT PROGRESS REPORT: EVALUATION OF PHASE 1 SEDIMENT AND SURFACE WATER DATA AND RECOMMENDATIONS FOR PHASE 2 SAMPLING IN BRUSH CREEK, BRUSH CREEK SURFACE WATER AND SEDIMENT INVESTIGATION OPERABLE UNIT 4, JULY 2007, PREPARED BY TETRA TECH

 

610.3   PROGRESS REPORT: EVALUATION OF PHASE 1 AND PHASE 2 BRUSH CREEK SEDIMENT AND SURFACE WATER DATA AND RECOMMENDATIONS FOR PHASE 3 SAMPLING IN BRUSH CREEK, JULY 2008, PREPARED BY TETRA TECH

 

632.     DRAFT REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR CAPPING OF TRENCH 6, MARCH 2010, PREPARED BY TETRA TECH

 

633.     DRAFT ATTACHMENT 1 TO THE REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN FOR CAPPING OF TRENCH 6: CONSTRUCTION QUALITY ASSURANCE/QUALITY CONTROL PLAN, MARCH 2010, PREPARED BY TETRA TECH 

 

655.     DRAFT FINAL MEC DENSITY SURVEY REPORT FOR LINE 6 AND THE CENTRAL TEST AREA MAY 2005, PREPARED BY MKM ENGINEERS

 

701.     DRAFT FIVE YEAR REVIEW AUGUST 2004, PREPARED BY THE CORPS OF ENGINEERS

 

703.     DRAFT FINAL FIVE YEAR REVIEW VOLUME 1, DECEMBER 2004, PREPARED BY THE CORPS OF ENGINEERS

 

704.     DRAFT FINAL FIVE YEAR REVIEW VOLUME 2, DECEMBER 2004, PREPARED BY THE CORPS OF ENGINEERS

 

705.     REVISED DRAFT FINAL FIVE YEAR REVIEW, JANUARY 2006, PREPARED BY THE CORPS OF ENGINEERS

 

706.     REVISED DRAFT FINAL FIVE YEAR REVIEW REPORT, FEBRUARY 2006, PREPARED BY TETRA TECH

 

707.     FINAL FIVE-YEAR REVIEW REPORT, MARCH 2006, PREPARED BY TETRA TECH

 

721.     IAAP CLOSURE PLAN LINE 6 30 JUNE – 30 JULY 1988

 

722.     SITE CLEAN-UP REPORT CONTAMINATED WASTE PROCESSOR NOVEMBER 17, 1993, PREPARED BY GEOTECHNICS

 

723.     DRAFT CLOSURE PLAN LINE 6 & BILLET SPLITTER SITE FEBRUARY 1992, PREPARED BY THE CORPS OF ENGINEERS

 

724.     INERT LANDFILL CLOSURE PLANS 1994, PREPARED BY THE CORPS OF ENGINEERS

 

725.     CLOSURE/POST CLOSURE PLANS FOR THE INERT LANDFILL APRIL 1998

            AMENDMENT TO CLOSURE/POST CLOSURE PLAN FEBRUARY 1997, PREPARED BY THE CORPS OF ENGINEERS

 

726.     RCRA CLOSURE REPORT EXPLOSIVE WASTE INCINERATOR JUNE 1998, PREPARED BY PDC TECHNICAL SERVICES

 

727.     FACILITY REDUCTION PROGRAM LINE 7 AND BUILDINGS 500-30-10 AND 500-197-3 CLOSE OUT REPORT, JUNE 2005, PREPARED BY PARSONS

 

750.     DRAFT (REVISION 2) DECONTAMINATION AND DEMOLITION LOAD, ASSEMBLY, AND PACK (LAP) LINES 5A, 5B, 6, 7, 8, 9, AND 800 WORK PLAN AUGUST 2005, PREPARED BY PLEXUS SCIENTIFIC CORPORATION.

 

751.     DRAFT FINAL (REVISION 4) DECONTAMINATION AND DEMOLITION LOAD, ASSEMBLY, AND PACK (LAP) LINES 5A, 5B, 6, 7, 8, 9, AND 800 WORK PLAN, NOVEMBER 2005, PREPARED BY PLEXUS SCIENTIFIC CORPORATION.          

 

752.     DECONTAMINATION/DEMOLITION OF LINES 5A, 5B, 6, 7, 8, 9, AND 800 VOLUME II HEALTH AND SAFETY PLAN AUGUST 2005.  PLEXUS SCIENTIFIC CORPORATION.   

 

753.     FINAL 3X BUILDING ASSESSMENT AND WASTE CHARACTERIZATION, JANUARY 2006, PREPARED BY PLEXUS SCIENTIFIC

 

754.     LUCE COMPANIES WORK PLAN TLC JOB NO. 2122

 

755.     ASBESTOS REMOVAL FOR LINE 7, 23 NOVEMBER 2005, PREPARED BY PLEXUS SCIENTIFIC

 

756.     DOCUMENTATION OF ASBESTOS REMOVAL/DISPOSAL AT LINE 7,                    5 DECEMBER 2005, PREPARED BY PLEXUS SCIENTIFIC

 

757.     DRAFT FINAL REPORT FOR LINE 7 DECONTAMINATION AND DEMOLITION, MARCH 2006, PREPARED BY PLEXUS SCIENTIFIC

 

758.     FRP SAMPLING AND ANALYSIS PLAN, PART 1: FIELD SAMPLING PLAN DEMOLITION OF MULTIPLE BUILDINGS, BHATE ENVIRONMENTAL ASSOCIATES, OCTOBER 2008

 

759.     COMPLETION REPORT: DEMOLITION OF MULTIPLE BUILDINGS, AUGUST 2007, PREPARED BY BHATE ASSOCIATES

 

760.     FRP SAMPLING AND ANALYSIS PLAN, PART 1: FIELD SAMPLING PLAN DEMOLITION OF MULTIPLE BUILDINGS, BHATE ENVIRONMENTAL ASSOCIATES, AUGUST 2009

 

761.     FRP SAMPLING AND ANALYSIS PLAN, PART 2: QUALITY ASSURANCE PROJECT PLAN DEMOLITION OF MULTIPLE BUILDINGS, BHATE ENVIRONMENTAL ASSOCIATES, AUGUST 2009

 

762.     FRP SAMPLING AND ANALYSIS PLAN, REVISION 2, PART 1: FIELD SAMPLING PLAN POST BUILDING DEMOLITION SAMPLING, ADDENDUM TO DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION ACTIVITIES OPERABLE UNIT 1, BHATE ENVIRONMENTAL ASSOCIATES, MARCH 2010  

 

763.     FRP SAMPLING AND ANALYSIS PLAN, REVISION 2, PART 2: QUALITY ASSURANCE PROJECT PLAN DEMOLITION OF MULTIPLE BUILDINGS, BHATE ENVIRONMENTAL ASSOCIATES, MARCH 2010

 

800.     DRAFT WORK/QUALITY ASSURANCE PLAN – ECOLOGICAL RISK ASSESSMENT ADDENDUM JUNE 1997, PREPARED BY THE HARZA

 

801.     FINAL WORK/QUALITY ASSURANCE PLAN – ECOLOGICAL RISK ASSESSMENT

            ADDENDUM JULY 1997, PREPARED BY THE HARZA

 

802.     HISTORICAL ECOLOGICAL RISK ASSESSMENT ADDENDUM, DRAFT REPORT, OCTOBER 1997, VOLUME 1, PREPARED BY THE HARZA

 

803.     HISTORICAL ECOLOGICAL RISK ASSESSMENT ADDENDUM, DRAFT FINAL REPORT, MARCH 1998, VOLUME 1, PREPARED BY THE HARZA

 

804.     DRAFT TECHNICAL MEMORANDUMS NO 1-4 FOR THE ECOLOGICAL RISK ASSESSMENT, APRIL 2002

 

805.     MODIFICATION TO THE SAMPLING & ANALYSIS PLAN (SAP) REVISED INVESTIGATION RELATED TO THE ECOLOGICAL ASSESSMENT APRIL 10, 2000, PREPARED BY THE HARZA

 

806.     ECO-RISK ROUND 2 SAMPLING SEPTEMBER 2000, PREPARED BY THE HARZA

 

807.     ECOLOGICAL RISK ASSESSMENT – SCREENING LEVEL ASSESSMENT, APRIL 4 2001, PREPARED BY THE HARZA

 

808.     DEVELOPMENT OF DOSE ESTIMATION MODELS AND TOXICITY REFERENCE VALUES ECOLOGICAL RISK ASSESSMENT AUGUST 2001, PREPARED BY THE HARZA

809.     SCREENING LEVEL RISK ASSESSMENT, ECOLOGICAL RISK ASSESSMENT AUGUST 2001, PREPARED BY THE HARZA

 

810.     ADDENDUM TO SCREENING LEVEL RISK ASSESSMENT ECOLOGICAL RISK ASSESSMENT DECEMBER 2001, PREPARED BY THE HARZA

 

815.     DRAFT BASELINE ECOLOGICAL RISK ASSESSMENT VOLUME 1 OCTOBER 2003, PREPARED BY THE HARZA

 

816.     DRAFT BASELINE ECOLOGICAL RISK ASSESSMENT VOLUME 2 OCTOBER 2003, PREPARED BY THE HARZA

 

819.     PRESUBMITTAL DRAFT FINAL BASELINE ECOLOGICAL RISK ASSESSMENT AUGUST 2004

 

820.     DRAFT FINAL BASELINE ECOLOGICAL RISK ASSESSMENT VOLUME 1 OCTOBER 2004, PREPARED BY THE HARZA

 

821.     DRAFT FINAL BASELINE ECOLOGICAL RISK ASSESSMENT VOLUME 2 OCOTBER 2004, PREPARED BY THE HARZA

                                               

823.     TECHNICAL MEMORANDUM TO CLOSE OUT BASELINE ECOLOGICAL RISK ASSESSMENT (BERA), DATED APRIL 2006, PREPARED BY TETRA TECH

 

826.     ENVIRONMENTAL BASELINE SURVEY, PROJECT NO. IAANG 03007, TRANSFER OF LAND TO IOWA NATIONAL GUARD, BARKER LEMAR, JULY 20, 2005

 

900.     ANNUAL REPORT 2000 REGISTRY OF HAZARDOUS WASTE

 

901.     ANNUAL REPORT 1999 REGISTRY OF HAZARDOUS WASTE

 

902.     ANNUAL REPORT 1998 REGISTRY OF HAZARDOUS WASTE

 

903.     ANNUAL REPORT 1997 REGISTRY OF HAZARDOUS WASTE

 

904.     SEMINAR PUBLICATION – TRANSPORT AND FATE OF CONTAMINANTS IN THE SUBSURFACE

 

905.     HANDBOOK – REMEDIATION OF CONTAMINATED SEDIMENTS

 

906.     SEMINAR PUBLICATION – SITE CHARACTERIZATION FOR SUBSURFACE REMEDIATION

 

907.     STABILIZATION/SOLIDIFICATION OF CERCLA & RCRA WASTES – PHYSICAL TESTS, CHEMICAL TESTING PROCEDURES, TECHNOLOGY SCREENING & FIELD ACTIVITIES

 

908.     CONTROL OF AIR EMISSIONS FROM SUPERFUND SITES

 

909.     HANDBOOK – GROUNDWATER AND WELLHEAD PROTECTION

 

910.     HANDBOOK – CONTROL TECHNOLOGIES FOR HAZARDOUS POLLUTANTS

 

911.     HANDBOOK – APPROACHES FOR THE REMEDIATION OF FEDERAL FACILITIES SITES CONTAMINATED WITH EXPLOSIVES OR RADIOACTIVE WASTE

 

912.     HANDBOOK – RECYCLING AND REUSE OF MATERIAL FOUND ON SUPERFUND SITES

 

913.     COMMUNITY RELATIONS IN SUPERFUND: A HANDBOOK

 

914.     ENVIRONMENTAL QUALITY – 1975

 

915.     FIELD DEMONSTRATION OF SLURRY REACTOR BIOTREATMENT OF EXPLOSIVES-CONTAMINATED SOURCES

 

916.     EXPLOSIVE SOIL COMPOSTING 1991

 

917.     WHAT WORKS? ALTERNATIVE STRATEGIES FOR SUPERFUND CLEANUPS SEPTEMBER 1991

 

918.     MAKING SUPERFUND WORK RECOMMENDATIONS TO IMPROVE PROGRAM IMPLEMENTATIONS JANUARY 1989

 

919.     SECTION 106, STEP-BY-STEP

 

920.     SUPERFUND GUIDANCE FEBRUARY 1994

 

921.     FINAL REPORT OF THE FEDERAL FACILITIES ENVIRONMENTAL RESTORATION DIALOGUE COMMITTEE APRIL 1996

 

922.     FINAL REPORT OF THE FEDERAL FACILITIES ENVIRONMENTAL RESTORATION DIALOGUE COMMITTEE APRIL 1996

 

923.     GROUNDWATER NOVEMBER – DECEMBER 1992

 

924.     EVALUATION OF GROUNDWATER QUALITY IN THE SKUNK RIVER BASIN

 

925.     EVALUATION OF SW846 METHOD 8330 FOR CHARACTERIZATION OF SITES CONTAMINATED WITH RESIDUES OF HIGH EXPLOSIVES

 

926.     INTERIM REPORT OF THE FEDERAL FACILITIES ENVIRONMENTAL RESTORATION DIALOGUE COMMITTEE FEB 1993

            ENVIRONMENTAL ACRONYMS, ABBREVIATIONS AND GLOSSARY OF TERMS

 

927.     ENVIRONMENTAL QUALITY TECHNOLOGY DEMONSTRATION, EVALUATION AND TRANSFER ACTIVITIES ANNUAL REPORT

 

928.     REMEDIATION TECHNOLOGIES SCREENING MATRIX AND REFERENCE GUIDE

 

930.     ARMY GUIDANCE CONCERNING RESTORATION ADVISORY BOARDS

            RESTORATION ADVISORY BOARD (RAB) RESOURCE BOOK

 

931.     ARMY MATERIAL COMMAND FOST/FOSL GUIDANCE FEBRUARY 1998

 

932.     BIOLOGICAL SURVEY OF FEDERALLY ENDANGERED BATS SEPTEMBER 1998

 

933.     2003 INDIANA BAT INVSETIGATIONS

 

934.     DRAFT ENVIRONMENT SITE CLOSEOUT GUIDE NOVEMBER 1998

 

935.     EPA CITIZEN’S GUIDES TO CLEAN-UP TECHNOLOGIES

 

936.     FEDERAL FACILITIES AGREEMENT

 

937.     GUIDANCE ON CONDUCTING NON-TIME CRITICAL REMOVAL ACTIONS UNDER CERCLA

 

938.     INDEPENDENT TECHNICAL REVIEW QUESTIONNAIRE, JANUARY 29, 1999

 

939.     MANAGEMENT GUIDANCE FOR THE DEFENSE ENVIRONMENTAL RESTORATION PROGRAM & DRAFT MANAGEMENT GUIDANCE FOR THE DERP SEPTEMBER 2001

 

940.     U.S. ARMY ENVIRONMENTAL RESTORATION PROGRAM GUIDANCE MANUAL APRIL 4, 1998

 

941.     PRINCIPLES OF ENVIRONMENTAL RESTORATION AND THEIR APPLICATION TO STREAM LINING INITIATIVES

 

942.     REQUIREMENTS FOR THE PREPARATION OF SAMPLING & ANALYSIS PLAN

 

943.     THE ROAD TO ROD

 

944.     SUPERFUND AMENDMENTS OF AND REAUTHORIZATION ACT 1986

 

945.     SUPERFUND REMOVAL PROCEDURE ACTION MEMORANDUM GUIDANCE

 

946.     PHYTOREMEDIATION STUDIES

 

947.     INTERIM ARMY LAND USE CONTROLS (LUC) MANAGEMENT PLAN AUGUST 2001

 

948.     LINKING LEGACIES CONNECTING THE COLDWAR NUCLEAR WEAPONS PRODUCTION PROCESSES TO THEIR ENVIRONMENTAL CONSEQUENCES

 

949.     DOCUMENTS THAT CORRESPOND TO DSERTS SITES

 

950.     LINE 6 SEWER COLLECTION SYSTEM VISUAL RECCONNAISSANCE FOR UXO 3/25/03

 

951.     POLYCHLORINATED BIPHENYL (PCB) SITE REVITALIZATION GUIDANCE UNDER THE TOXIC SUBSTANCES CONTROL ACT (TSCA), EPA, NOVEMBER 2005

 

1000.   DRAFT CLOSED, TRANSFERRING, AND TRANSFERRED RANGE/SITE INVENTORY REPORT, AUGUST 2003, PREPARED BY ENGINEERING-ENVIRONMENTAL MANAGEMENT

 

1001.   FINAL CLOSED, TRANSFERRING, AND TRANSFERRED RANGE/SITE INVENTORY REPORT, OCTOBER 2003, PREPARED BY ENGINEERING-ENVIRONMENTAL MANAGEMENT

 

1002.   DRAFT U.S. ARMY OPERATIONAL RANGE INVENTORY SUSTAINMENT FY06, JUNE 2006, PREPARED BY USAEC

 

1003.   FINAL U.S. ARMY OPERATIONAL RANGE INVENTORY SUSTAINMENT FY06, FEBRUARY 2007, PREPARED BY USAEC

 

1005.   DRAFT HISTORICAL RECORDS REVIEW FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, MARCH 2007, PREPARED BY URS

 

1006.   FINAL HISTORICAL RECORDS REVIEW FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, JULY 2007, PREPARED BY URS

 

1007.   FINAL SITE INSPECTION REPORT FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2007, PREPARED BY URS

 

1009.   DRAFT CHECK COPY REMEDIAL INVESTIGATION WORK PLAN FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2007, PREPARED BY URS

 

1010.   DRAFT REMEDIAL INVESTIGATION WORK PLAN FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2007, PREPARED BY URS

 

1011.   DRAFT FINAL REMEDIAL INVESTIGATION WORK PLAN FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, APRIL 2008, PREPARED BY URS

 

1012.   FINAL PROJECT MANAGEMENT PLAN FOR THE MILITARY MUNITIONS RESPONSE PROGRAM REMEDIAL INVESTIGATION WORK PLAN, AUGUST 2007, PREPARED BY URS

 

1014.   DRAFT WORK PLAN ADDENDUM MILITARY MUNITIONS RESPONSE PROGRAM GEOPHYSICAL PROVE-OUT PLAN, APRIL 2008, PREPARED BY URS

 

1015.   DRAFT FINAL WORK PLAN ADDENDUM MILITARY MUNITIONS RESPONSE PROGRAM GEOPHYSICAL PROVE-OUT PLAN, JUNE 2008, PREPARED BY URS

 

1016.   DRAFT GEOPHYSICAL INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, 30 JULY 2008, PREPARED BY URS

 

1017.   DRAFT FINAL GEOPHYSICAL INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2008, PREPARED BY URS

 

1018.      DRAFT GEOPHYSICAL PROVE-OUT TECHNICAL MEMORANDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, AUGUST 2008, PREPARED BY URS

 

1019.      DRAFT FINAL GEOPHYSICAL PROVE-OUT TECHNICAL MEMORANDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, SEPTEMBER 2008, PREPARED BY URS

 

1020.      DRAFT INTRUSIVE INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, FEBRUARY 2008, PREPARED BY URS

 

1021.      DRAFT INTRUSIVE INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, FEBRUARY 2009, PREPARED BY URS

 

1022.      DRAFT FINAL INTRUSIVE INVESTIGATION LETTER WORK PLAN ADDENDUM FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, MAY 2009, PREPARED BY URS

 

1024.   DRAFT REMEDIAL INVESTIGATION REPORT FOR THE MILITARY MUNITIONS RESPONSE PROGRAM, MAY 2010, PREPARED BY URS

 

S100.   DOCUMENTS FROM REPOSITORIES-DOCUMENT 1 NEWS RELEASE ENVIRONMENTAL STUDY BEGINS DATED AUGUST 1991, DOCUMENT 3 CONCEPTUAL PROGRAM PLAN FOR THE RI/FS AT IAAP DATED SEPTEMBER 12, 1991, DOCUMENT 5 WATER QUALITY QUESTIONNAIRES WITH COVER LETTER DATED OCTOBER 29 ,1992,  DOCUMENT 6 TECHNICAL REVIEW COMMITTE MINUTES  DATED MAY 19, 1993 DOCUMENT 7 ADDITIONAL WATER QUALITY QUESTIONNAIRES

 

S101.   CONTAMINATION SURVEY SCOPE OF WORK

 

S102.   CONCEPTUAL PROGRAM PLAN FOR RI/FS AT IAAAP SEPTEMBER 12, 1991, JAYCOR

 

S103.   SAMPLING AND ANALYSIS PLAN AND QUALITY ASSURANCE PROJECT PLAN VOLUME 1 JUNE 1991, JAYCOR

 

S104.   SAMPLING AND ANALYSIS PLAN AND FIELD SAMPLING PLAN VOLUME 2 JUNE 1991, JAYCOR

 

S105.   SAMPLING AND ANALYSIS PLAN AND QUALITY ASSURANCE PROJECT PLAN VOLUME 1 JULY1991, JAYCOR

 

S106.   RISK ASSESSMENT PROTOCOL OCTOBER 1992, JAYCOR

 

S107.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 1 OF 10, JAYCOR

 

S108.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 2 OF 10, JAYCOR

 

S109.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 3 OF 10, JAYCOR

 

S110.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 4 OF 10, JAYCOR

 

S111.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 5 OF 10, JAYCOR

 

S112.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 6 OF 10, JAYCOR

 

S113.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 7 OF 10, JAYCOR

 

S114.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 8 OF 10, JAYCOR

 

S115.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 9 OF 10, JAYCOR

 

S116.   DRAFT REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 10 OF 10, JAYCOR

 

S117.   DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 1 OF 7, JAYCOR

 

S118.   DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 2 OF 7, JAYCOR

 

S119.   DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 3 OF 7, JAYCOR

 

S120.   DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 4 OF 7, JAYCOR

 

S121.   DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 5 OF 7, JAYCOR

 

S122.   DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 6 OF 7, JAYCOR

 

S123.   DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 7 OF 7, JAYCOR

 

S124.   DRAFT FINAL REMEDIAL INVESTIGATION/RISK ASSESSMENT VOLUME 7 OF 7, JAYCOR

 

S125.   DRAFT FOLLOW ON REMEDIAL INVESTIGATIO SAMPLING ADDENDUM DECEMBER 1, 1994, JAYCOR

 

S126.   DRAFT WORK PLAN FOR SUUPLEMENTAL REMEDIAL INVESTIGATION FOR LINE 1 AND THE FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) VOLUME 1 MARCH 29, 2001, TN & A ASSOCIATES

 

S127.   DRAFT WORK PLAN FOR SUPLEMENTAL REMEDIAL INVESTIGATION FOR LINE 1 AND THE FIRING SITE (INCLUDING HISTORICAL SITE ASSESSMENT) VOLUME 2 MARCH 29, 2001, TN & A ASSOCIATES

 

S150.   TEST BORING AND MONITORING WELL INSTALLATION PLAN AT THE INERT LANDFILL AND LINE 6 DECEMBER 1987, TERRACON EC

 

S151.   SAMPLING AND ANALYSIS PLAN/ QUALITY CONTROL/QUALITY ASSURANCE PLAN FOR INERT LANDFILL AND LINE 6 MARCH 1988, TERRACON EC

 

S152.   GROUNDWATER ASSESSMENT TRENCH 5 AND LINE 6 MAY 5, 1994

 

S153.   SITE GROUNDWATER INVESTIGATION FIRE TRAINING PIT WORK PLAN (FINAL) SAMPLING AND ANALYSIS PLAN (FINAL) APRIL 1997, HARZA

 

S154.   DRAFT SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT HISTORICAL VOLUME 1 APRIL 1997, HARZA

 

S155.   DRAFT SUPPLEMENTAL GROUNDWATER REMEDIAL INVESTIGATION REPORT HISTORICAL VOLUME 2 APRIL 1997, HARZA

 

S200.   DRAFT GROUNDWATER FLOW MODELING LINE 800 PINKWATER LAGOON JUNE 2002 – WITHDRAWN, URS 

           

S202.   draft technical memorandum groundwater flow modeling line 800 pinkwater lagoon, URS AUGUST 2002

 

S204.   DRAFT LINE 800 PINKWATER LAGOON FEASIBILITY STUDY AUGUST 2002, URS           

 

S205.   DRAFT FINAL LINE 800 PINKWATER LAGOON FEASIBILITY STUDY FEBRUARY 2003, URS      

 

S206.   DRAFT FINAL TECHNICAL MEMORANDUM GROUNDWATER FLOW AND CONTAMINANT FATE AND TRANSPORT MODELING LINE 800 PINK WATER LAGOON FEBRUARY 2003, URS  

           

S208.   DRAFT LINE 800 PINK WATER LAGOON PROPOSED PLAN APRIL 2003, URS        

 

S209.   OFF-SITE MONITORING WELL AND STAFF GAUGE PHOTOGRAPHIC LOG DECEMBER 2002, URS

 

S210.   DRAFT FINAL OFF-SITE REMEDIAL INVESTIGATION VOLUME 1 APRIL 2003, URS          

 

S211.   DRAFT FINAL OFF-SITE REMEDIAL INVESTIGATION VOLUME 2     APRIL 2003, URS      

 

S212.   DRAFT FINAL OFF-SITE GROUNDWATER FEASIBILITY STUDY MARCH 2004, URS         

 

S213.   DRAFT FINAL OFF-SITE GROUNDWATER TECHNICAL MEMORANDUM FOR GROUNDWATER FLOW AND CONTAMINANT FATE AND TRANSPORT MODELING, URS MARCH 2004

 

S214.   DRAFT DIRECT PUSH FIELD INVESTIGATION TECHNICAL MEMORANDUM & REVISED WORK OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION, URS, FEBRUARY 2002

 

S216.   DRAFT OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION DECEMBER 2002 VOLUME 1, URS           

 

S217.   DRAFT OFF-SITE GROUNDWATER REMEDIAL INVESTIGATION DECEMBER 2002 VOLUME 2, URS           

 

S219.   DRAFT OFF-SITE GROUNDWATER FEASIBILITY STUDY, DATED SEPTEMBER 2003, URS           

           

S221.   OFF-SITE GROUNDWATER PROPOSED PLAN PUBLIC MEETING HANDOUTS

PUBLIC MEETING TRANSCRIPT FOR OFF POST GROUNDWATER PROPOSED PLAN (2 COPIES), 2004, URS

 

S223.   DRAFT OFF-SITE GROUNDWATER ROD, DATED SEPTEMBER 2004, URS    

 

S224.   DRAFT FINAL OFF-SITE GROUNDWATER RECORD OF DECISION MAY 2005, URS          

 

S226.   DRAFT OFF-SITE GROUNDWATER TREATABILITY STUDY WORK PLAN AUGUST 2004, TETRA TECH

 

S227.   DRAFT FINAL OFF-SITE GROUNDWATER TREATABILITY STUDY WORK PLAN NOVEMBER 2004, TETRA TECH

 

S241.   DRAFT LINES 2, 3 & 9 FEASIBILITY STUDY DATA COLLECTION WORK PLAN AUGUST 2002, URS

 

S242.   DRAFT FINAL SPRING CREEK, LONG CREEK AND SKUNK RIVER WATERSHED EVALUATION AND DATA COLLECTION WORK PLAN, DATED JANUARY 2005, PREPARED BY TETRA TECH

 

S243.   DRAFT FINAL BRUSH CREEK WATERSHED EVALUATION AND SUPPLEMENTAL DATA COLLECTION WORK PLAN JANUARY 2005, TETRA TECH

 

S246.   DRAFT BRUSH CREEK POINT SOURCE CONTROL WORK PLAN AUGUST 2004, TETRA TECH

 

S247.   DRAFT FINAL BRUSH CREEK POINT SOURCE CONTROL WORK PLAN NOVEMBER 2004, TETRA TECH

 

S248.   FINAL BRUSH CREEK POINT SOURCE CONTROL TREATMENT SYSTEM DESIGN MAY 2005, TETRA TECH

 

S249.   DRAFT-FINAL TREATABILITY STUDY TEST PLAN FOR IN SITU BIODEGRADATION OF ON-POST GROUNDWATER APRIL 2005, TETRA TECH

 

S250.   INITIAL GROUNDWATER ANALYTICAL RESULTS & PROPOSED MONITORING WELL LOCATIONS SIX SITES FEASIBILITY STUDY DATA COLLETION JANUARY 30, 2003, URS

 

S251.   INITIAL GROUNDWATER ANALYTICAL RESULTS & PROPOSED MONITORING WELL LOCATIONS SIX SITES FEASIBILITY STUDY DATA COLLETION FEBRUARY 20, 2003, URS

 

S252.   INITIAL GW ANALYTICAL RESULTS 6 SITES FS DATA COLLECTION 9/9/03, URS

 

S253.   SIX SITES FEASIBILITY STUDY DATA COLLECTION MONITORING WELL AND STAFF GAUGE INSTALLATION DOCUMENTATION & PHOTO LOG MAY 2004, URS

 

S254.   DRAFT FIRE TRAINING PIT REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 MAY 2004, URS

 

S255.   DRAFT FIRE TRAINING PIT REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 MAY 2004, URS

 

S256.   DRAFT EAST BURN PADS REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JUNE 2004, URS

 

S257.   DRAFT EAST BURN PADS REMEDIAL ALTERNATVE ANALYSIS VOLUME 2 JUNE 2004, URS

 

S258.   DRAFT WEST BURN PADS GROUNDWATER INVESTIGATION VOLUME 1 JUNE 2004, URS

 

S259.   DRAFT WEST BURN PADS GROUNDWATER INVESTIGATION VOLUME 2 JUNE 2004, URS

 

S260.   DRAFT LINE 3 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JANUARY 2004, URS

 

S261.   DRAFT LINE 3 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JANUARY 2004, URS

 

S262.   DRAFT LINE 9 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 JANUARY 2004, URS

 

S263.   DRAFT LINE 9 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 JANUARY 2004, URS

 

S264.   DRAFT LINE 2 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 1 FEBRUARY 2004, URS

 

S265.   DRAFT LINE 2 REMEDIAL ALTERNATIVE ANALYSIS VOLUME 2 FEBRUARY 2004, URS

 

S266.   DRAFT FTP, WBPA, EBP FEASIBILTY STUDY DATA COLLECTION WORK PLAN ADDENDUM AUGUST 2002, URS

 

S300.   FINAL SUPPLEMENTAL RA WORK PLAN FOR THE FIRE TRAINING PIT REMOVAL ACTION JULY & AUGUST 2003, ECC

 

S301.   DRAFT FINAL FACILITY WIDE WORK PLAN REMEDIAL DESIGN/REMEDIAL ACTION ACTIVITIES OPERABEL UNIT 1 REVISION 2 JULY 2003, SHAW

 

S302.   DRAFT WORK PLAN AMENDMENT & SAP AMENDMENT & SSHP AMENDMENT PHASE 3 DECEMBER 1999, ECC

 

S303.   DRAFT WORK PLAN AMENDMENT FOCUSED FEASIBILITY STUDIES SOILS REMEDIATION BARIUM – CONTAMINATED SOILS STABILIZATION AUGUST 2000, CAPE ENVIRONMENTAL

 

S304.   DRAFT TREATABILITY STUDY FOR BARIUM IMPACTED SOIL STABILIZATION AUGUST 2000, CAPE ENVIRONMENTAL

 

S305.   BIOREMEDIATION/METALS TREATMENT JUNE 14, 2001, CAPE ENVIRONMENTAL

 

S307.   DRAFT REMEDIAL ACTION REPORT FOCUSED FEASIBILITY SOIL STUDY SITES, PHASE III REMEDIAL ACTION-WBPA MAY 2002, CAPE ENVIRONMENTAL

 

S310.   DRAFT FACILITY WIDE WORK PLAN FOR REMEDIAL DESIGN/ REMEDIAL ACTION ACTIVITIES, DATED 3/20/03 VOLUME 1, SHAW

 

S313.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOIL SITES VOLUME 1 OCTOBER 2002, TN & ASSOCIATES

 

S314.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOIL SITES VOLUME 2 OCTOBER 2002, TN & ASSOCIATES

 

S315.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 5 SOIL SITES VOLUME 1 OCTOBER 2002, TN & ASSOCIATES

 

S316.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 5 SOIL SITES VOLUME 2 OCTOBER 2002, TN & ASSOCIATES

 

S317.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 1 DECEMBER 2002, TN & ASSOCIATES

 

S318.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 2 DECEMBER 2002, TN & ASSOCIATES

 

S319.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 3 DECEMBER 2002, TN & ASSOCIATES

 

S320.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 4 DECEMBER 2002, TN & ASSOCIATES

 

S321.   DRAFT WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOILS SITES VOLUME 5 DECEMBER 2002, TN & ASSOCIATES

 

S322.   DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOIL SITES VOLUME 1 MARCH 2003, TN & ASSOCIATES

 

S323.   DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL RI (INCLUDING HSA) FOR PHASE 4 SOIL SITES VOLUME 2 MARCH 2003, TN & ASSOCIATES

 

S328.   DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OPERABLE UNIT 1 FEBRUARY 2005, TETRA TECH

 

S329.   revised DRAFT FINAL REMEDIAL DESIGN/REMEDIAL ACTION WORK PLAN AND SAMPLING AND ANALYSIS PLAN ADDENDUM SOILS OPERABLE UNIT 1 JUNE 2005, TETRA TECH

 

S400.   TRENCH 5 REPORT 1995, EARTH TECH

 

S401.   TRENCH 5 REPORT 1996, EARTH TECH

 

S402.   TRENCH 5 REPORT 1997, MASON & HANGER

 

S403.   TRENCH 5 REPORT 1998, MASON & HANGER

 

S404.   TRENCH 5 REPORT 1999, AMERICAN ORDNANCE

 

S405.   ANNUAL REPORT SEMI ANNUAL GROUNDWATER MONITORING REPORT ASH DISPOSAL CELL TRENCH 5, INERT DISPOSAL AREA MARCH 2000, TN & ASSOCIATES

 

S406.   ASH DISPOSAL CELL TRENCH 5, INERT DISPOSAL AREA MONITORING WELL INSTALLATION WORK PLAN AUGUST 30, 2000, TN & ASSOCIATES

 

S407.   INTERIM REPORT SEMI ANNUAL GROUNDWATER MONITORING ASH DISPOSAL CELL TRENCH 5 INERT DISPOSAL AREA OCTOBER 2001, URS

 

S408.   ANNUAL REPORT SEMI ANNUAL GROUNDWATER MONITORING (INCLUDING NEW MONITORING WELL INSTALLATIONS) ASH DISPOSAL CELL, TRENCH 5 REPORT 2001, TN & ASSOCIATES

 

S409.   TRENCH 5 REPORT 2001, URS

 

S410.   TRENCH 5 REPORT 2002, HYDROLGEOLOGIC

 

S411.   TRENCH 5 REPORT 2003, HYDROLGEOLOGIC

 

S412.   TRENCH 5 REPORT 2004, HYDROLGEOLOGIC

 

S412.1.2005 SEMI-ANNUAL GROUNDWATER MONITORING REPORT – TRENCH 5 INERT DISPOSAL AREA, DATED FEBRUARY 2006, TETRA TECH   

 

S412.2 DRAFT 2006 SEMI-ANNUAL GROUNDWATER MONITORING REPORT – ASH DISPOSAL CELL AT TRENCH 5 INERT DISPOSAL AREA, DATED FEBRUARY 2007, TETRA TECH

 

S413.   PROJECT SUMMARY REPORT FOR THE ENVIRONMENTAL GROUNDWATER MONITORING COVERING THE PERIOD 15 JULY 1994 – 30 JUNE 1995, TECHNICAL DATA REPORT FOR THE ENVIRONMENTAL GROUNDWATER MONITORING FY1994 SAMPLING, TECHNICAL DATA REPORT FOR THE ENVIRONMENTAL GROUNDWATER MONITORING FY1995, LB&M ASSOCIATES

 

S414.   REPORT FOR THE FALL 1995 MONITORING OF IRP WELLS, MASON & HANGER

 

S415.   REPORT FOR THE SPRING 1996 MONITORING OF IRP WELLS, MASON & HANGER

 

S416.   REPORT FOR THE FIRST CYCLE 1997 MONITORING OF IRP WELLS, MASON & HANGER

 

S417.   REPORT FOR THE SECOND CYCLE 1997 MONITORING OF IRP WELLS, MASON & HANGER

 

S418.   DRAFT LONG-TERM MONITORING EVENTS FALL 1999 AND SPRING 2000 WORK PLAN ADDENDUM OCTOBER 1999, HARZA

 

S419.   DRAFT LONG-TERM MONITORING EVENTS FALL 1999 AND SPRING 2000 WORK PLAN ADDEDUM NOVEMBER 1999, HARZA

 

S420.   LONG-TERM MONITORING SPRING 2000 WORK PLAN ADDENDUM MARCH 2000, HARZA

 

S421.   LONG-TERM MONITORING SPRING 2000 WORK PLAN ADDENDUM APRIL 2000, HARZA

 

S422.   WELL COMPLETION REPORT FALL 1999 LONG-TERM GROUNDWATER MONITORING EVENT JUNE 2000, HARZA

 

S423.   LONG-TERM MONITORING REPORT FALL 1999 JUNE 2000, HARZA

 

S424.   MONITORING WELL MAINTENANCE & ABANDONMENT REPORT OCTOBER 2000, TN & ASSOCIATES

 

S425.   QUALITY CONTROL SUMMARY REPORT GROUNDWATER MONITORING PROGRAM FALL 1999 SAMPLING EVENT JULY 2000, HARZA

 

S426.   WELL COMPLETION REPORT SPRING 2000 GROUNDWATER MONITORING EVENT JULY 2000, HARZA

 

S427.   GROUNDWATER MONITORING REPORT SPRING 2000 OCTOBER 2000, HARZA

 

S428.   QUALITY CONTROL SUMMARY REPORT GROUNDWATER MONITORING PROGRAM SPRING 2000 SAMPLING EVENT AUGUST 2001, HARZA

 

S429.   DRAFT GROUNDWATER MONITORING PROGRAM JANUARY 2001 DRAFT FINAL GROUNDWATER MONITORING PROGRAM AUGUST 2001, HARZA

 

S430.   DRAFT FALL 2001 GROUNDWATER MONITORING INTERIM REPORT APRIL 2001 VOLUME 1, URS

 

S431.   DRAFT FALL 2001 GROUNDWATER MONITORING INTERIM REPORT APRIL 2001 VOLUME 2, URS

 

S432.   DRAFT FALL 2000 GROUNDWATER MONITORING RESULTS SUMMARY APRIL 2001, URS

 

S433.   DRAFT FALL 2000 SPRING 2001 GROUNDWATER MONITORING REPORT SEPTEMBER 2001 VOLUME 1, URS

 

S434.   DRAFT FALL 2000 SPRING 2001 GROUNDWATER MONITORING REPORT SEPTEMBER 2001 VOLUME 2, URS

 

S435.   DRAFT FINAL FALL 2000 SPRING 2001 GROUNDWATER MONITORING REPORT VOLUME 1, URS

 

S436.   DRAFT FINAL FALL 2000 SPRING 2001 GROUNDWATER MONITORING REPORT VOLUME 2, URS

 

S437.   FALL 2000 AND SPRING 2001 GROUNDWATER MONITORING RESULTS SUMMARY AUGUST 2001, URS

 

S438.   DRAFT FINAL FACILITY WIDE WORK PLAN, URS

 

S439.   DRAFT 2002 GROUNDWATER MONITORING REPORT VOLUME 1 MARCH 2001, HYDROGEOLOGIC

 

S440.   DRAFT 2002 GROUNDWATER MONITORING REPORT VOLUME 2 MARCH 2001, HYDROGEOLOGIC

 

S441.   DRAFT FINAL 2002 GROUNDWATER MONITORING REPORT AUGUST 2003 VOLUME 1, HYDROGEOLOGIC

 

S442.   DRAFT FINAL 2002 GROUNDWATER MONITORING REPORT AUGUST 2003 VOLUME 2, HYDROGEOLOGIC

 

S443.   DRAFT 2003 GROUNDWATER MONITORING REPORT VOLUME 1 AUGUST 2004, HYDROGEOLOGIC

 

S444.   DRAFT 2003 GROUNDWATER MONITORING REPORT VOLUME 2 AUGUST 2004, HYDROGEOLOGIC

 

S445.   DRAFT FINAL 2003 GROUNDWATER MONITORING REPORT VOLUME 1 DECEMBER 2004, HYDROGEOLOGIC

 

S446.   DRAFT FINAL 2003 GROUNDWATER MONITORING REPORT VOLUME 2 DECEMBER 2004, HYDROGEOLOGIC

 

S500.   SITE ASSESSMENT PROJECT PLAN FOR AET, DATED 1999

 

S501.   SITE ASSESSMENT PROJECT PLAN FOR AET REV.2, DATED 2000

 

S502.   FIELD SAMPLING REPORT AET BLDG. 600-84, DATED FEBRUARY 2001

 

S503.   ACTION MEMORANDUM FOR INERT LANDFILL AUGUST 25, 1995, CDM FEDERAL PROGRAMS

 

S504.   FINAL IMPLEMENTATION PROPOSAL FOR ENVIRONMENTAL  PROTECTION, DATED FEBRUARY 1996, PREPARED BY ECC

 

S505.   FINAL WORK PLAN FOR MULTIPLE REMOVAL ACTION FEBRUARY 14, 1996, ECC

 

S506.   SAMPLING & ANALYSIS PLAN FOR TREATED DISCHARGES OF THE WATER CONTAINED IN THE LINE 800 PINK WATER LAGOON AUGUST 1996, ECC

 

S507.   WETLAND BORROW AREA ASSESSMENT REPORT AUGUST 1996, ECC

 

S508.   MULTIPLE REMOVAL ACTIONS TRANSMITTAL OF FINAL RADIO ACTIVE ISOTOPE ANALYTICAL REPORT, DATED MAY 1997, ECC

 

S509.   MULTIPLE REMOVAL ACTIONS FINAL WATER TREATMENT PLAN FOR PERCHED WATER AT THE IDA, DATED FEBRUARY 1998, ECC

 

S510.   FINAL REMEDIAL ACTION REPORT FOR MULTIPLE REMOVAL ACTIONS, DATED APRIL 2001, ECC

 

S511.   DRAFT WORK PLAN FOR THE FIRING TRAINING PIT APRIL 1998, ECC

 

S512.   DRAFT SOILS FOCUSED FEASIBILITY STUDY VOLUME 1 OF 1 MARCH 6, 1996, JAYCOR

 

S513.   WORKING DRAFT SOILS FOCUSED FEASIBILITY STUDY JANUARY 10, 1997

 

S514.   SOILS FOCUSED FEASIBILITY STUDY USARMY DECISION DOCUMENT FOR FOCUSED SOILS REMOVAL MAY 1, 1997

 

S515.   DRAFT SOILS FEASIBILITY REPORT MARCH 16, 1998

 

S516.   FINAL SOILS FEASIBILITY REPORT JUNE 1998

 

S517.   SITE SAFETY SUBMISSION FOR EDA (EAST BURN PADS) APRIL 1997, CORPS OF ENGINEERS

 

S518.   DRAFT  PHASE 1 REVISED WORK PLAN AND CONTRACTOR QUALITY CONTROL PLAN JANUARY 14, 1998, ECC

 

S519.   DRAFT REMEDIAL ACTION REPORT PHASE 1 MAY 1999, ECC

 

S520.   DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 OCTOBER 2000 BOOK 1 OF 19, ECC

 

S521.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX A OCTOBER 2000 BOOK 2 OF 19, ECC

 

S522.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX A OCTOBER 2000 BOOK 3 OF 19, ECC

 

S523.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 4 OF 19, ECC

 

S524.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 5 OF 19, ECC

 

S525.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 6 OF 19, ECC

 

S526.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 7 OF 19, ECC

 

S527.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 8 OF 19, ECC

 

S528.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 9 OF 19, ECC

 

S529.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – EAST BURN PADS OCTOBER 2000 BOOK 10 OF 19, ECC

 

S530.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 11 OF 19, ECC

 

S531.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 12 OF 19, ECC

 

S532.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 13 OF 19, ECC

 

S533.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 14 OF 19, ECC

 

S534.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 15 OF 19, ECC

 

S535.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS LANDFILL OCTOBER 2000 BOOK 16 OF 19, ECC

 

S536.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS OCTOBER 2000 BOOK 17 OF 19, ECC

 

S537.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS OCTOBER 2000 BOOK 18 OF 19, ECC

 

S538.   FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 1 APPENDIX B – NORTH BURN PADS OCTOBER 2000 BOOK 19 OF 19, ECC

 

S539.   DRAFT WORK PLAN ADDENDUM, CONTIGENCY PLAN, CQCP ADDENDUM, SAP ADDENDUM AND SSHP ADDENDUM PHASE 2 MARCH 1999, ECC

 

S540.   DRAFT REMEDIAL ACTION REPORT PHASE 2 SEPTEMBER 2000, ECC

 

S541.   DRAFT FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APRIL 2001 BOOK 1 OF 21, ECC

 

S542.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 1 NORTH SUMP CHARACTERIZATION SAMPLES APRIL 2001 BOOK 2 OF 21, ECC

 

S543.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 1 NORTH SUMP CHARACTERIZATION SAMPLES APRIL 2001 BOOK 3 OF 21, ECC

 

S544.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 1 SOUTH SUMP CHARACTERIZATION SAMPLES APRIL 2001 BOOK 4 OF 21, ECC

 

S545.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – ROUNDHOUSE RDX SITE CHARACTERIZATION APRIL 2001 BOOK 5 OF 21, ECC

 

S546.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 6 OF 21, ECC

 

S547.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 7 OF 21, ECC

 

S548.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 8 OF 21, ECC

 

S549.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 9 OF 21, ECC

 

S550.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 10 OF 21, ECC

 

S551.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 11 OF 21, ECC

 

S552.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 12 OF 21, ECC

 

S553.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5A SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 13 OF 21, ECC

 

S554.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 14 OF 21, ECC

 

S555.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 15 OF 21, ECC

 

S556.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 16 OF 21, ECC

 

S557.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 17 OF 21, ECC

 

S558.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 18 OF 21, ECC

 

S559.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX C – LINE 5B SITE CHARACTERIZATION SAMPLES APRIL 2001 BOOK 19 OF 21, ECC

 

S560.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX E – EXCAVATION AND SURVEY MAPS APRIL 2001 BOOK 20 OF 21, ECC

 

S561.   FINAL REMEDIAL ACTION REPORT – FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION PHASE 2 APPENDIX G – SAFETY & HEALTH REPORTS & DATA APRIL 2001 BOOK 21 OF 21, ECC

 

S562.   DRAFT FINAL EXCAVATION REPORT FOCUSED FEASIBILITY SOIL STUDY SITES, PHASE 3 REMEDIAL ACTION WEST BURN PADS AREA NOVEMBER 2001, ECC

 

S563.   DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 1, ECC

 

S564.   DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 2, ECC

 

S565.   DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 3, ECC

 

S566.   DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 4, ECC

 

S567.   DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 5, ECC

 

S568.   DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 6, ECC

 

S569.   DRAFT FINAL REMEDIAL ACTION REPORT FOCUSED FEASIBILITY STUDY SITES REMEDIAL ACTION WEST BURN PADS NOVEMBER 2001 APPENDIX B VOLUME 7, ECC

 

S601.   DRAFT SUPPLEMENTAL RI FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA AND LINE 3A POND MARCH 2003, MKM ENGINEERS

 

S602.   DRAFT FINAL VERSION 5 SOIL DATA COLLECTION FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR JULY 2004, MKM ENGINEERS

 

S604.   DRAFT REPORT FOR SOIL DATA COLLECTION FOR INCENDIARY DISPOSAL AREA, FLYASH WASTE PILE, POSSIBLE DEMOLITION AREA, LINE 3A POND, CONSTRUCTION DEBRIS LANDFILL AND THE CONTAMINATED WASTE PROCESSOR DECEMBER 2004, MKM ENGINEERS

 

S605.   DRAFT FINAL REPORT FOR THE SOIL DATA COLLECTION AT THE INCENDIARY DISPOSAL AREA, FLY ASH WASTE PILE, POSSIBLE DEMOLITION SITE, LINE 3A POND, EXPLOSIVE WASTE INCINERATOR AND CONSTRUCTION DEBRIS LANDFILL MAY 2005, MKM ENGINEERS

 

S606.   DRAFT FINAL WORK PLAN FOR SUPPLEMENTAL REMEDIAL INVESTIGATION OPERABLE UNIT 4 FEBRUARY 2005, MKM ENGINEERS

 

S607.   DRAFT FINAL REMEDIAL ACTION WORK PLAN FOR SOILS TREATMENT AT THE INERT DISPOSAL AREA APRIL 2005, PREPARED BY TETRA TECH

 

S650.   REPORT FOR THE INVESTIGATION OF THE TAR-LIKE SUBSTANCE PILES AT IOWA AAP SEPTEMBER 2003, MKM ENGINEERS

 

S653.   DRAFT WORK PLAN FOR THE UXO SURVEY OF LOAD LINE 6 AND CENTRAL TEST AREA VOLUME 1 MAY 2004, MKM ENGINEERS

 

S654.   DRAFT MEC DENSITY SURVEY REPORT FOR LINE 6 AND THE CENTRAL TEST AREA FEBRUARY 2005, MKM ENGINEERS

 

S655.   DRAFT FINAL MEC DENSITY SURVEY REPORT FOR LINE 6 AND THE CENTRAL TEST AREA MAY 2005, MKM ENGINEERS

 

S700.   DRAFT FINAL FIVE YEAR REVIEW VOLUME 1, DATED DECEMBER 2004, PREPARED BY CORPS OF ENGINNERS

 

S701.   DRAFT FINAL FIVE YEAR REVIEW VOLUME 2, DATED DECEMBER 2004, PREPARED BY CORPS OF ENGINNERS

 

S725.   INSTALLATION ACTION PLAN FY00 MARCH 2000

 

S726.   INSTALLATION ACTION PLAN FY01 MARCH 2001

 

S727.   INSTALLATION ACTION PLAN FY02 MARCH 2002

 

S728.   INSTALLATION ACTION PLAN FY03 MARCH 2003

 

S729.   INSTALLATION ACTION PLAN FY04 MARCH 2004

 

S730.   INSTALLATION ACTION PLAN FY05 AUGUST (WORKING COPY)

 

S750.   DRAFT FINAL REPORT FOR ENVIRONMENTAL REMEDIATION SERVICES AT THE IOWA ARMY AMMUNITION PLANT LINE 6 AND BILLET SPLITTER BUILDING CLOSURE VOLUME 1 MARCH 29, 1994, OHM

 

S751.   DRAFT FINAL REPORT FOR ENVIRONMENTAL REMEDIATION SERVICES AT THE IOWA ARMY AMMUNITION PLANT LINE 6 AND BILLET SPLITTER BUILDING CLOSURE VOLUME 2 MARCH 29, 1994, OHM

 

S752.   RCRA CLOSURE EXPLOSIVE WASTE INCINERATOR JUNE 1998, ECC

 

S753.   HEALTH AND SAFETY PLAN FOR A BIOLOGICAL SOIL SLURRY LAGOON PILOT SCALE DEMONSTRATION SEPTEMBER 1996, ENVIRONMENTAL RESEARCH DIVISION

 

S754.   TEST PLAN FOR A BIOLOGICAL SOIL SLURRY LAGOON PILOT SCALE DEMONSTRATION SEPTEMBER 1999, ENVIRONMENTAL RESEARCH DIVISION

 

S755.   FINAL REPORT: CLOSURE, DEMOBILIZATION AND SAMPLING ACTIVITIES AT THE BIOLOGICAL SOIL SLURRY LAGOON DECEMBER 1999, ENVIRONMENTAL RESEARCH DIVISION

 

S775.   FY99 ER,A

 

S776.   FY00 ER,A

 

S777.   FY01 ER,A

 

S778.   FY02 ER,A

 

S779.</