The IAAAP Administrative Record is now available online at www.iaaap.adminrecord.com.
Documents 1, 3, 4, 5, 6, 7, 9, 10, 20, 33 and 34 were removed from the repositories because they were replaced with a later document or are no longer applicable to the current clean-up activities.
Document 22 was removed because it was a RCRA repository document and was incorrectly placed in the ER,A repositor
DOCUMENT: 2
TITLE: Community Relations Plan for the IAAP (PIRP)/Community Relations Plan
Update
AUTHORS: William Boe, Evelyn Knauft, and Norma Miller/Gail Smith
SOURCE: Environmental Science and Engineering, Inc./Operations Support Command
REPORT: 3-90-9003-3170-3170/ NA
DATED: May 1991/February 2001
PAGES: 125/58
PROGRAM: Installation Restoration Program
DOCUMENT: 08
TITLE: Official Transcript and Presentation (Rathbun Water)
AUTHORS: M. Jane Weingart, MJW Court Reporting Services
SOURCE: MJW Court Reporting Services
REPORT: None
DATED: 18 August 1993
PAGES: 39
PROGRAM: Installation Restoration Program
DOCUMENT: 11
TITLE: Draft Final Report (Revised) Baseline Human Health and
Ecological Risk Assessment
AUTHORS: JAYCOR and ICAIR Life Systems, Inc.
SOURCE: JAYCOR and ICAIR Life Systems, Inc.
REPORT: None
DATED: 1 June 1994
PAGES: 625
PROGRAM: Installation Restoration Program
DOCUMENT: 12
TITLE: Draft Final Report (Revised) Feasibility Study
AUTHORS: JAYCOR and CDM Federal Programs Corp.
SOURCE: JAYCOR and CDM Federal Programs Corp.
REPORT: None
DATED: 1 June 1994
PAGES: 525
PROGRAM: Installation Restoration Program
DOCUMENT: 13
TITLE: Revised Draft Final RI and Risk Assessment
AUTHORS: JAYCOR and ICAIR Life Systems, Inc.
SOURCE: JAYCOR and ICAIR Life Systems, Inc.
REPORT: Volumes 1 through 11
DATED: 21 May 1996
PAGES: 12,500
PROGRAM: Installation Restoration Program
DOCUMENT: 14
TITLE: Final Engineering Evaluation/Cost Analysis for Pesticide Pit
AUTHORS: CDM Federal Programs Corp.
SOURCE: CDM Federal Programs Corp.
REPORT: None
DATED: 11 October 1994
PAGES: Approximately 150
PROGRAM: Installation Restoration Program
DOCUMENT: 15
TITLE: Final Engineering Evaluation/Cost Analysis for Explosive-Contaminated Sumps
AUTHORS: CDM Federal Programs Corp.
SOURCE: CDM Federal Programs Corp.
REPORT: None
DATED: 11 October 1994
PAGES: 121
PROGRAM: Installation Restoration Program
DOCUMENT: 16
TITLE: Action Memorandum for Pesticide Pit at IAAP
AUTHORS: CDM Federal Programs Corp.
SOURCE: CDM Federal Programs Corp.
REPORT: None
DATED: 20 March 1995
PAGES: 15
PROGRAM: Installation Restoration Program
DOCUMENT: 17
TITLE: Corrective Action Management Unit Designation
AUTHORS: Scott Marquess, RPM, SUPR/FFSE
SOURCE: U.S. EPA, Region VII
REPORT: None
DATED: 29 November 1995
PAGES: 9
PROGRAM: Installation Restoration Program
DOCUMENT: 18
TITLE: Draft Final Engineering Evaluation/Cost Analysis for Inert Landfill and
Multiple Removal Actions
AUTHORS: CDM Federal Program Corp.
SOURCE: CDM Federal Program Corp.
REPORT: 4 Volumes
DATED: 15 May 1995
PAGES: Approximately 500
PROGRAM: Installation Restoration Program
DOCUMENT: 19
TITLE: Engineering Evaluation/Cost Analysis Study for Fire Training Pit
AUTHORS: HARZA Environmental Services Inc.
SOURCE: HARZA Environmental Services Inc
REPORT: None
DATED: May 1996
PAGES: 220
PROGRAM: Installation Restoration Program
DOCUMENT: 21
TITLE: Action Memorandum for the Line 800 Pinkwater Lagoon and the
Former Line 1 Impoundment at the Iowa Army Ammunition Plant
AUTHORS: CDM Federal Programs Corporation
SOURCE: U.S. Army Corps of Engineers
REPORT: 1 Volume
DATED: October 1996
PAGES: 34
PROGRAM: Installation Restoration Program
DOCUMENT: 23
TITLE: Draft Final Soils Focused Feasibility Study
AUTHORS: Engineered Efficiency/Steve Birchmeier
SOURCE: U.S. Army Environmental Center
REPORT: 1 Volume
DATED: 8 May 1997
PAGES: Approximately 750
PROGRAM: Installation Restoration Program
DOCUMENT: 24
TITLE: Proposed Plan for Interim Action Soils Operable Unit IAAAP Site
AUTHORS: Engineered Efficiency/Steve Birchmeier
SOURCE: U.S. Army Environmental Center
REPORT: None
DATED: MAY 1997
PAGES: 25
PROGRAM: Installation Restoration Program
DOCUMENT: 25
TITLE: Action Memorandum for the Inert Landfill at the Iowa Army Ammunition Plant
AUTHORS: CDM Federal Programs Corp.
SOURCE: U.S. Army Corps of Engineers – Omaha District
REPORT: None
DATED: September 1997
PAGES: 42
PROGRAM: Installation Restoration Program
DOCUMENT: 26
TITLE: Fire Training Pit - Iowa Army Ammunition Plant
Explanation of Significant Difference and Action Memorandum
AUTHORS: Environmental Chemical Corporation
SOURCE: U.S. Army Corps of Engineers, Omaha District
REPORT: None
DATED: December 1997
PAGES: 112
PROGRAM: Installation Restoration Program
DOCUMENT: 27
TITLE: Superfund Proposed Plan - Iowa Army Ammunition Plant
Soils Operable Unit #1
AUTHORS: HARZA
SOURCE: U.S. Army Corps of Engineers, Omaha District
REPORT: None
DATED: June 17, 1998
PAGES: 26
PROGRAM: Installation Restoration Program
DOCUMENT: 28
TITLE: Soils Feasibility Study Report - Operable Unit No. 1 (Final)
AUTHORS: HARZA
SOURCE: U.S. Army Corps of Engineers, Omaha District
REPORT: None
DATED: June 19, 1998
PAGES: 151
PROGRAM: Installation Restoration Program
DOCUMENT: 29
TITLE: U.S. Army Interim Soils Action For Operable Unit #1 Record of Decision.
AUTHORS: Dept of Army/Environmental Protection Agency
SOURCE: Corps of Engineers Omaha District
REPORT: None
DATED: March 4, 1998
PAGES: 69
PROGRAM: Installation Restoration Program
DOCUMENT: 30
TITLE: Transcript of Public Meeting for Superfund Proposed Plan - Iowa Army
Ammunition Plant Soils Operable Unit #1
AUTHORS: M. Jane Weingart, C.S.R., R.M.R.
SOURCE:
REPORT: None
DATED: July 9, 1998
PAGES: 52
PROGRAM: Installation Restoration Program
DOCUMENT: 31
TITLE: Preliminary Assessments(PAs) for the 43 Iowa Army Ammunition Plant sites
AUTHORS: Tracy A. Young
SOURCE: JAYCOR
REPORT: None
DATED: 4 October 1994
PAGES: 394
PROGRAM: Installation Restoration Program
DOCUMENT: 32
TITLE: Final Record of Decision Iowa Army Ammunition Plant Soils Operable Unit #1
AUTHORS: Dept of Army/Environmental Protection Agency
SOURCE: Corps of Engineers Omaha District
REPORT: None
DATED: August 1998
PAGES: 65
PROGRAM: Installation Restoration Program
DOCUMENT: 35
TITLE: Public Health Assessment
AUTHORS: Federal Facilities Assessment Branch
SOURCE: Agency for Toxic Substances and Disease Registry
REPORT: None
DATED: December 28, 1999
PAGES: 90
PROGRAM: Installation Restoration Program
DOCUMENT: 36
TITLE: Installation Action Plan
AUTHORS: Rodger Allison, IAAAP
SOURCE:
REPORT: None
DATED: October 2008
PAGES: 117
PROGRAM: Installation Restoration Program
DOCUMENT: 37
TITLE: Corrective Action Design Report
AUTHORS: Jeffrey White, TRILEAF
SOURCE:
REPORT: None
DATED: July 2001
PAGES: 40
PROGRAM: Installation Restoration Program
DOCUMENT: 38
TITLE: RBCA TIER-2 REPORT
AUTHORS: Jeffery White, TRILEAF
SOURCE:
REPORT: None
DATED: May 19, 2000
PAGES: 269
PROGRAM: Installation Restoration Program
DOCUMENT: 39
TITLE: Final Remedial Action Report for the Fire Training Pit
AUTHORS: Environmental Chemical Corporation
SOURCE:
REPORT: None
DATED: October 2000
PAGES: 104
PROGRAM: Installation Restoration Program
DOCUMENT: 40
TITLE: Final Remedial Action Report for the Focused Feasibility Study
Sites Remedial Action Phase I
AUTHORS: Environmental Chemical Corporation
SOURCE:
REPORT: None
DATED: October 2000
PAGES: 373
PROGRAM: Installation Restoration Program
DOCUMENT: 41
TITLE: Final Remedial Action Report for the Focused Feasibility Study Sites Remedial Action Phase II
AUTHORS: Environmental Chemical Corporation
SOURCE:
REPORT: None
DATED: April 2001
PAGES: 235
PROGRAM: Installation Restoration Program
DOCUMENT: 42
TITLE: Final Remedial Action Report for the Multiple Removal Actions
AUTHORS: Environmental Chemical Corporation
SOURCE:
REPORT: None
DATED: April 2001
PAGES: 86
PROGRAM: Installation Restoration Program
DOCUMENT: 43
TITLE: Draft Final Work Plans for Supplemental Remedial Investigation for Line 1 &
Firing Site(Including Historical Site Assessment)
AUTHORS: TN & Associates, Inc.
SOURCE:
REPORT: 2 Volumes (Context, Appendices)
DATED: September 20, 2001
PAGES: 417
PROGRAM: Installation Restoration Program
DOCUMENT: 44
TITLE: Revised Draft Final Supplemental Groundwater Remedial Investigation Report
(1997)
AUTHORS: Harza
SOURCE:
REPORT: 2 Volumes
DATED: August 2001
PAGES: 1176
PROGRAM: Installation Restoration Program
DOCUMENT: 45
TITLE: Final Technical Memorandum Supplemental Investigation Off-Site
Groundwater, Phase IV
AUTHORS: Harza
SOURCE:
REPORT: 1 Volume
DATED: May 2002
PAGES: 134
PROGRAM: Installation Restoration Program
DOCUMENT: 46
TITLE: Draft Final Line 1 & Firing Site Supplemental Remedial Investigation Report
AUTHORS: TN&A
SOURCE:
REPORT: 2 Volumes
DATED: August 2002
PAGES: 1800
PROGRAM: Installation Restoration Program
DOCUMENT: 47
TITLE: Report of Over Excavation Former Fueling Station
AUTHORS: TriLeaf
SOURCE:
REPORT: 1 Volume
DATED: August 2002
PAGES: 36
PROGRAM: Installation Restoration Program
DOCUMENT: 48
TITLE: 3rd Quarter Site Monitoring Report for the Former Fuel Station
AUTHORS: TriLeaf
SOURCE:
REPORT: 1 Volume
DATED: October 2002
PAGES: 61
PROGRAM: Installation Restoration Program
DOCUMENT: 49
TITLE: Draft Final Remedial Action Report Focused Feasibility Soil Study Sites, Phase III Remedial Action-WBPA
AUTHORS: CAPE
SOURCE:
REPORT: 1 Volume
DATED: December 2002
PAGES: 1223
PROGRAM: Installation Restoration Program
DOCUMENT: 50
TITLE: Draft Final Line 800 Pink Water Lagoon Groundwater Flow & Contaminant Fate & Trasport Modeling Technical Memorandum
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: February 2003
PAGES: 220
PROGRAM: Installation Restoration Program
DOCUMENT: 51
TITLE: Draft Final Line 800 Pink Water Lagoon Feasibility Study
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: February 2003
PAGES: 300
PROGRAM: Installation Restoration Program
DOCUMENT: 52
TITLE: Draft Final Off-Site Groundwater Remedial Investigation
AUTHORS: URS
SOURCE:
REPORT: 2 Volumes
DATED: April 2003
PAGES: 950
PROGRAM: Installation Restoration Program
DOCUMENT: 53
TITLE: Explanation of Significant Differences for the Final Record of Decision for the Soils Operable Unit 1
AUTHORS: Iowa AAP
SOURCE:
REPORT: 1 Volume
DATED: January 2003 signed April 2003
PAGES: 17
PROGRAM: Installation Restoration Program
DOCUMENT: 54
TITLE: Draft Final Aerial Radiological Survey
AUTHORS: Argonne National Laboratory
SOURCE:
REPORT: 1 Volume
DATED: July 10, 2003
PAGES: 73
PROGRAM: Installation Restoration Program
DOCUMENT: 55
TITLE: Final 2007 Groundwater Sampling Report
AUTHORS: Tetra Tech
SOURCE:
REPORT: 1 Volume
DATED: February 2009
PAGES: 201
PROGRAM: Installation Restoration Program
DOCUMENT: 56
TITLE: 3rd Quarter Site monitoring Report for the Former Fuel Station
AUTHORS: TriLeaf
SOURCE:
REPORT: 1 Volume
DATED: October 2003
PAGES: 66
PROGRAM: Installation Restoration Program
DOCUMENT: 57
TITLE: ATSDR Health Consultation Environmental Pathway Evaluation for Beryllium & Depleted Uranium
AUTHORS: ATSDR
SOURCE:
REPORT: 1 Volume
DATED: December 9, 2003
PAGES: 38
PROGRAM: Installation Restoration Program
DOCUMENT: 58
TITLE: Draft Final Off-Site Groundwater Feasibility Study
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: March 2004
PAGES: Approx. 300
PROGRAM: Installation Restoration Program
DOCUMENT: 59
TITLE: Draft Final Groundwater Flow & Contaminant Fate and Transport Modeling Off-Site Groundwater
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: March 2004
PAGES: Approx. 300
PROGRAM: Installation Restoration Program
DOCUMENT: 60
TITLE: Revised Draft Final Off-Site Groundwater Proposed Plan
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: July 2004
PAGES: 14
PROGRAM: Installation Restoration Program
DOCUMENT: 61
TITLE: Former Fuel Station No Further Action Documentation
AUTHORS: Trileaf
SOURCE:
REPORT: 1 Volume
DATED: August 2004
PAGES: 33
PROGRAM: Installation Restoration Program
DOCUMENT: 62
TITLE: Public Meeting Transcript for the Off-Post Groundwater Proposed Plan
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: July 29, 2004
PAGES: 31
PROGRAM: Installation Restoration Program
DOCUMENT: 63
TITLE: Draft Final Baseline Ecological Risk Assessment
AUTHORS: Montgomery Watson Harza
SOURCE:
REPORT: 2 Volume
DATED: October 2004
PAGES: Approx. 1500
PROGRAM: Installation Restoration Program
DOCUMENT: 64
TITLE: Final Five Year Review
AUTHORS: Tetra Tech
SOURCE:
REPORT: 1 Volume
DATED: March 2006
PAGES: 277
PROGRAM: Installation Restoration Program
DOCUMENT: 65
TITLE: Draft Final Historical Record Review for Line 6, Line 800, Central Test Area and the Deactivation Furnace
AUTHORS: TN&A and Shaw
SOURCE:
REPORT: 1 Volume
DATED: October 2004
PAGES: Approx. 70
PROGRAM: Installation Restoration Program
DOCUMENT: 66
TITLE: Draft Final Off-Site Groundwater Record of Decision
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: June 2005
PAGES: Approx. 90
PROGRAM: Installation Restoration Program
DOCUMENT: 67
TITLE: Draft Final Supplemental Remedial Investigation Work Plan and Regulatory Path Forward for Six Non-ER,A Eligible Sites
AUTHORS: Tetra Tech, Inc
SOURCE:
REPORT: 1 Volume
DATED: March 2006
PAGES: 159
PROGRAM: Compliance Cleanup
DOCUMENT: 68
TITLE: Final Comprehensive (Brush Creek, Spring Creek, Long Creek, and Skunk River) Watersheds Evaluation and Supplemental Data Collection Work Plan
AUTHORS: Tetra Tech, Inc
SOURCE:
REPORT: 2 Volumes
DATED: December 2006
PAGES: Approx. 300
PROGRAM: Installation Restoration Program
DOCUMENT: 69
TITLE: Final Focused Feasibility Study for Trench 6, Trench 7, and the Cap Extension Area of the Inert Disposal Area (IDA)
AUTHORS: Tetra Tech, Inc
SOURCE:
REPORT: 1 Volume
DATED: January 2007
PAGES: 68
PROGRAM: Installation Restoration Program
DOCUMENT: 70
TITLE: Proposed Plan for Trench 6, Trench 7, and the Cap Extension Area of the Inert Disposal Area (IDA)
AUTHORS: Tetra Tech, Inc
SOURCE:
REPORT: 1 Volume
DATED: May 2007
PAGES: 16
PROGRAM: Installation Restoration Program
DOCUMENT: 71
TITLE: Explanation of Significant Differences Deletion of Radiological Contaminants from Interim Record of Decision (IROD) Soils Operable Unit #1 (OU-1)
AUTHORS: Tetra Tech, Inc
SOURCE:
REPORT: 1 Volume
DATED: June 2006
PAGES: 9
PROGRAM: Installation Restoration Program
DOCUMENT: 72
TITLE: Final Historical Records Review for the Military Munitions Response Program
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: July 2007
PAGES: 464
PROGRAM: Military Munitions Response Program
DOCUMENT: 73
TITLE: Final Site Inspection Report for the Military Munitions Response Program
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: September 2007
PAGES: 478
PROGRAM: Military Munitions Response Program
DOCUMENT: 74
TITLE: Draft Final Remedial Investigation Work Plan for the Military Munitions Response Program
AUTHORS: URS
SOURCE:
REPORT: 1 Volume
DATED: April 2008
PAGES: 1031
PROGRAM: Military Munitions Response Program
DOCUMENT: 75
TITLE: Final Explanation of Significant Differences for the Interim Action Record of Decision (IROD) Soils Operable Unit (OU-1) Addition of Environmental Protectiveness to the Remedy and Transfer of Sites from OU-4 to OU-1
REPORT: 1 Volume
DATED: June 2008
PAGES: 22
PROGRAM: Installation Restoration Program
DOCUMENT: 76
TITLE: Draft Final Work Plan Addendum Military Munitions Response Program Geophysical Prove-Out Plan
REPORT: 1 Volume
DATED: June 2008
PAGES: 178
PROGRAM: Military Munitions Response Program
DOCUMENT: 77
TITLE: Draft Final Geophysical Investigation Letter Work Plan Addendum Military Munitions Response Program
REPORT: 1 Volume
DATED: September 2008
PAGES: 35
PROGRAM: Military Munitions Response Program
DOCUMENT: 78
TITLE: Draft Final Revision 1 Interim Action Record of Decision for Trench 6, Trench 7, and the Cap Extension Area of the Inert Disposal Area
REPORT: 1 Volume
DATED: September 2008
PAGES: 63
PROGRAM: Installation Restoration Program
DOCUMENT: 79
TITLE: Draft Final Geophysical Prove-Out Technical Memorandum Military Munitions Response Program
REPORT: 1 Volume
DATED: September 2008
PAGES: 275
PROGRAM: Military Munitions Response Program
DOCUMENT: 80
TITLE: Final Technical Memorandum Cesium Source Evaluation
REPORT: 1 Volume
DATED: February 2009
PAGES: 6
PROGRAM: Installation Restoration Program
DOCUMENT: 81
TITLE: Final Technical Memorandum for Full-Scale Treatability Study for In-Situ Biodegradation of On-Post Groundwater
REPORT: 1 Volume
DATED: February 2009
PAGES: 32
PROGRAM: Installation Restoration Program
DOCUMENT: 82
TITLE: Final Intrusive Investigation Letter Work Plan Addendum for the Military Munitions Response Program
REPORT: 1 Volume
DATED: May 2009
PAGES: 71
PROGRAM: Military Munitions Response Program
DOCUMENT: 83
TITLE: Final Brush Creek Point Source Control Treatment System Report
REPORT: 1 Volume
DATED: June 2009
PAGES: 187
PROGRAM: Installation Restoration Program
DOCUMENT: 84
TITLE: Technical Memorandum Offsite Brush Creek Supplemental Surface Water and Groundwater Sampling
REPORT: 1 Volume
DATED: February 2009
PAGES: 15
PROGRAM: Installation Restoration Program
DOCUMENT: 85
TITLE: Technical Memorandum Offsite Brush Creek Supplemental Surface Water and Groundwater Results Collected March/April 2009
REPORT: 1 Volume
DATED: June 2009
PAGES: 12
PROGRAM: Installation Restoration Program
DOCUMENT: 86
TITLE: Status Report for Soil Chemical Treatment Inert Disposal Area
REPORT: 1 Volume
DATED: March 2009
PAGES: 20
PROGRAM: Installation Restoration Program
DOCUMENT: 87
TITLE: Final Technical Memorandum Soil Treatment Results for Alkaline Hydrolysis in Trench 6 Inert Disposal Area
AUTHORS: Tetra Tech, Inc.
REPORT: 1 Volume
DATED: November 2009
PAGES: 36
PROGRAM: Installation Restoration Program
DOCUMENT: 88
TITLE: Final Explanation of Significant Differences for the Final Record of Decision Soils OU1 Change of Primary Treatment Technology from Biological to Alkaline Hydrolysis Chemical Treatment
AUTHORS: Tetra Tech, Inc.
REPORT: 1 Volume
DATED: September 2009
PAGES: 71
PROGRAM: Installation Restoration Program
DOCUMENT: 89
TITLE: Final Brush Creek Point Source Control Treatment System Report
AUTHORS: Tetra Tech, Inc.
REPORT: 1 Volume
DATED: June 2009
PAGES: 187
PROGRAM: Installation Restoration Program
DOCUMENT: 90
TITLE: Final Remedial Action Report for Biological Soil Treatment at the Inert Disposal Area
AUTHORS: Tetra Tech, Inc.
REPORT: 1 Volume
DATED: January 2010
PAGES: 188
PROGRAM: Installation Restoration Program
DOCUMENT: 91
TITLE: Draft Final Remedial Investigation Report for the Firing Sites Area, Yards C, E, F, G, and L, Warehouse 3-01 and area west of Line 5B
AUTHORS: U.S. Army Corps of Engineers
REPORT:
DATED: July 25, 2008
PAGES: 3071
PROGRAM: FUSRAP